Defrost cycle

A routine in which an air-source heat pump melts frost from its outdoor coil, usually by reversing the refrigerant flow for several minutes.

What is a defrost cycle?

A defrost cycle is a routine in which an air-source heat pump melts the frost on its outdoor coil. A frosted coil takes less heat from the air, so the unit must clear it to keep heating. The most common method is reverse-cycle defrost. The unit switches from heating to cooling mode, and warm refrigerant melts the ice. A 2024 peer-reviewed study in Energy and Buildings (Gollamudi and co-authors) lists other methods. They include hot gas bypass, electric resistance and thermal energy storage. Defrost is normal operation, but each cycle interrupts heating and uses energy.

This page uses three kinds of source. A US consumer guide from the Consortium for Energy Efficiency (CEE) gives the owner's view. The peer-reviewed study gives the physics and the energy effect. The installation manual of one R290 monobloc gives product rules. The CEE guide is for US owners. Read its figures as typical values, not as limits for a Slovak project.

What causes frost on a heat pump outdoor unit?

In heating mode the outdoor coil takes heat from the air. The CEE guide says that when the outdoor coils drop below freezing, condensation freezes on them and forms frost. The Gollamudi study adds the range of conditions. In its simulation of 45 Canadian cities, frosting dominates where the ambient air is mostly between -15 °C and 6 °C. At very low temperatures the air holds little moisture. At -25 °C, for example, going from 40% to 100% relative humidity adds only 0.2 g of water per kg of dry air. It therefore treats the frost loss below -15 °C as small. Frost is thus a mild-and-damp problem more than a deep-frost problem.

How does reverse-cycle defrost work?

The CEE guide describes the sequence for an owner. The heat pump enters a defrost cycle from time to time, switches to cooling mode and melts the ice on the coils with warm refrigerant. The fans might stop or slow, and auxiliary heating could start to keep the temperature stable. The ice then clears and the unit returns to heating. The sequence is the same in outline for air-to-water units, as in the air-to-water heat pump.

The unit decides when to defrost with its own controls. A US Department of Energy field study by the National Renewable Energy Laboratory (NREL) finds defrost among seven operating modes. The researchers detect each mode by comparing temperature and power measurements. Defrost is therefore a normal, detectable phase, not a rare fault. The Midea manual shows a controller with a force defrost setting and a signal output for a defrost run.

Phase What the unit does What the owner notices
Heating Coil takes heat from outdoor air Normal heat
Defrost Unit switches to cooling mode, fans might stop or slow Heat can dip, auxiliary heat could start
Recovery Ice has cleared, unit returns to heating Heating resumes

How long does a defrost cycle last?

The CEE guide says defrost typically takes 5 to 15 minutes. It gives no number of cycles per day. The Gollamudi study says only that frosting conditions need frequent defrost cycles. For a given unit, the manufacturer's control logic sets the timing, so ask the installer for the defrost behaviour of the chosen model.

What happens to heating and backup heat during defrost?

Because the unit switches to cooling mode, it does not heat the house for the duration. The CEE guide says that in ducted systems supplemental heat may start during defrost to prevent a gap in heating. In ductless systems the indoor head may put off some cooling to heat the outdoor coils. The guide also says auxiliary electric resistance heat is costly and inefficient, and advises an HVAC check if it runs often. The Midea manual describes its optional backup heater as extra capacity for low outdoor temperatures. It also protects the outside water pipes against freezing.

Aspect Defrost cycle Backup heating
Purpose Melt frost from the outdoor coil Add heat when the heat pump alone does not meet the demand
Typical duration (CEE guide) 5 to 15 minutes As long as the demand lasts
Energy cost (CEE guide) Uses some energy Electric resistance is costly and inefficient

How much does frost cost in energy?

The Gollamudi study says frosting can lower the coefficient of performance (COP) by 10% to 20%, a figure it takes from earlier work. In its simulation of Canadian cities the annual energy increase from frosting reaches 13.5% of annual heating energy in the worst city. These figures come from Canadian climates and a model. They show the size of the effect and do not predict a Slovak house. Regulation (EU) No 813/2013 defines the seasonal coefficient of performance (SCOP). It is the reference annual heating demand divided by the annual energy consumption of the designated heating season. The text of 813/2013 and of the energy label Regulation 811/2013 does not mention defrost. How the test standard counts defrost was not checked for this page. See heat pump SCOP for the definition.

Where should the outdoor unit sit to cope with meltwater and ice?

The CEE guide says meltwater drips at the outdoor unit, so it must not pool and refreeze on a walkway. It warns that in cold climates a unit under a roof eave's drip line or under deck slats can get snow and water problems. These affect airflow. It prefers the gable end of the house. The Midea manual gives product rules for a monobloc unit. Condensate must drain to a frost-free area. On soft ground the manual calls for a downpipe into a gravel bed, with a self-regulating heating cable in the downpipe. For cold climates it strongly recommends a belt heater against frozen drain water. It also puts the rear of the unit against a wall and adds a lateral canopy. It asks for a high pedestal or wall mount, with at least 100 mm clearance from snow.

What do owners often misread about defrost?

A common misreading is that a defrosting unit is faulty. The CEE guide says it is normal for frost to form below freezing, and that the unit defrosts itself. Covering the unit is another mistake. The guide says to leave it uncovered, because it needs airflow, and to shield it from excessive water and snow. If the unit stays in defrost or has ice all over it, the guide says to consult an HVAC professional.

Does Slovak law set rules for defrost?

The sources read for this page include no Slovak act or standard on defrost. The practical rules come from the manual of the unit and from the installer's design. Anything further should be checked against the current Slovak texts before it enters a design brief.

Frequently asked questions

Is frost on my heat pump outdoor unit normal?
Yes. The CEE consumer guide says condensation freezes on the outdoor coils when they drop below freezing, and the unit defrosts itself from time to time. Call a technician if the unit stays in defrost or has ice all over it.
How long does a defrost cycle take?
The CEE guide says typically 5 to 15 minutes. The number of cycles per day depends on the weather and the controls. The manual of the unit is the reference for a given model.
Does defrosting use energy and reduce heating?
Yes. The unit switches to cooling mode and warm refrigerant melts the ice, so the house gets less heat. Auxiliary heat could start. The CEE guide calls electric resistance auxiliary heat costly and inefficient.
Should I cover the outdoor unit in winter?
No. The CEE guide says to avoid covering it, because it needs airflow. It advises shielding the unit from excessive water and snow, for example by placing it on the gable end or using a snow shield.
At which temperatures does frost form?
The Gollamudi study of Canadian cities finds frosting dominates where ambient air is mostly between -15 °C and 6 °C. Very cold air holds little moisture, so frost loss is small below -15 °C.
Does defrost raise the energy use of a heat pump?
Yes. The Gollamudi study cites a COP loss of 10% to 20% from frosting. Its simulation gives up to 13.5% extra annual heating energy in the worst Canadian city. Those are Canadian model values, not a forecast for a Slovak house.

Sources

  1. You Installed an Air Source Heat Pump. Now What? · Consortium for Energy Efficiency (CEE), US consumer guide, hosted by the US Department of Energy Building Science Education Center · Heat pumps defrost themselves; Frequently asked ASHP questions (frost, auxiliary heating, covering the unit); Protect your unit from roof run off
  2. Methodology to evaluate design modifications intended to eliminate frosting and high discharge temperatures in air-source heat pumps (ASHPs) in cold climates · Energy and Buildings 312 (2024) 114209, University of Saskatchewan and Oak Ridge National Laboratory (accepted manuscript on OSTI) · Abstract, Introduction, Section on the frosting map
  3. NREL Field Validation of Air-Source Heat Pumps for Cold Climates 2021-2023 · US Department of Energy, Heat Pump Data platform (NREL study) · Study summary (operating mode identification)
  4. Commission Regulation (EU) No 813/2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · Publications Office of the European Union (EUR-Lex, Cellar) · Article 2, definition of seasonal coefficient of performance (SCOP)
  5. Midea ATW Heat Pump Installation Manual (R290 monobloc range M-Thermal Arctic Mono, file MD23IU-047I-EN, PDF modified 21 November 2024) · Midea Group · 2.8 Hydraulic module, 4.3 Drainage, 4.4 In cold climates, 6.5.4 Wiring of alarm or defrost run, 3.9 Force defrost