Bivalence point
A bivalence point is the outdoor temperature below which a heat pump alone cannot meet the heating load and needs a second heat source.
What is the bivalence point of a heat pump?
A bivalence point is the outdoor temperature below which a heat pump alone cannot meet the heating load and needs a second heat source. The EU ecodesign rules call it the bivalent temperature. Regulation (EU) No 813/2013 defines it as the outdoor temperature that the manufacturer declares. At that temperature the declared capacity equals the part load for heating. Below it, the unit needs supplementary capacity to meet that load (Annex I, point 39).
The same Regulation says a heat pump space heater may have one or more supplementary heaters. These use either electric resistance elements or the combustion of fuel (Article 2, point 17). A supplementary heater generates heat when the heat demand is greater than the rated heat output of the main heater (Article 2, point 19).
The bivalence point is therefore a value the manufacturer declares for the appliance. It is not a property of your house. The heat load of the house decides how much supplementary capacity is needed in practice.
How does the bivalence point differ from the operation limit temperature?
The operation limit temperature is the lower threshold. For an air-to-water heat pump, it is the outdoor temperature that the manufacturer declares. Below it, the unit cannot deliver any heating capacity (Annex I, point 40). Above it, the declared capacity is more than zero.
The two values bracket a range. Between the bivalence point and the operation limit temperature, the heat pump still runs. Its capacity is lower than the load, so supplementary capacity covers the difference. Below the operation limit temperature, the heat pump delivers nothing and the supplementary heater has to cover the whole load. Both values appear as separate lines in the same data table, so read them as two thresholds and not as one switching point.
What bivalent temperature does the regulation allow?
Annex III, Table 4 of Regulation 813/2013 sets the reference design conditions for heat pumps under average climate conditions. These conditions are the basis for the rated heat output. The table gives three outdoor temperatures.
| Reference value | Symbol | Value in Table 4 |
|---|---|---|
| Reference design temperature | Tdesignh | -10 °C (wet bulb -11 °C) |
| Bivalent temperature | Tbiv | maximum +2 °C |
| Operation limit temperature | TOL | maximum -7 °C |
The Regulation defines the part load ratio in a formula. You subtract 16 °C from the outdoor temperature and divide by the reference design temperature minus 16 °C (Annex I, point 23). At the design temperature of -10 °C the ratio is 1. With this formula, the ratio at +2 °C is 14 divided by 26, about 0.54. At -7 °C it is 23 divided by 26, about 0.88. A unit declared at the maximum bivalent temperature of +2 °C therefore needs supplementary capacity once the load passes about half of the design load. This is our calculation from the Regulation's formula, not a figure the Regulation states.
How do hybrid systems use a second heat source?
The Joint Research Centre status report describes the most common hybrid configuration as an air-water heat pump paired with a condensing gas boiler. It says the boiler "provides supplementary heating capacity when needed, particularly during periods of low outdoor temperatures". The report adds that hybrid heat pumps assume the gas grid is kept in place. You can read more in the entry on the hybrid heat pump.
The Regulation defines the declared temperature for the appliance. It does not say where an installer should set the changeover in a particular house. It also does not say whether the two sources run together or one after the other. Ask the installer which temperature the controller uses, how it was chosen, and which source runs first.
How is the bivalence point different from the coefficient of performance?
The coefficient of performance is a ratio of heat delivered to electricity used at a stated test condition. The bivalence point is a temperature. A heat pump can show a good coefficient at one outdoor temperature. It can still need a second source at a colder one. The two values answer different questions.
| Term | What it is | Regulation 813/2013 |
|---|---|---|
| Bivalence point (bivalent temperature) | Outdoor temperature below which supplementary capacity is needed | Annex I, point 39 |
| Operation limit temperature | Outdoor temperature below which an air-to-water heat pump delivers no heating capacity | Annex I, point 40 |
| Declared coefficient of performance | Heat delivered per unit of electricity at a limited number of specified outdoor temperatures | Annex I, point 38 |
The Regulation calculates the seasonal coefficient of performance from three inputs at each outdoor temperature. These are the part load for heating, the supplementary capacity and the coefficient. It weights them by the hours at which that temperature occurs (Annex III, point 4). The supplementary heater is therefore part of the seasonal figure. See SCOP for the seasonal figure.
What should you check on the data sheet?
The Regulation requires a table of technical parameters in the installer and user manuals. It must also be on the manufacturer's website (Annex II, point 5 and Table 2). The table lists the bivalent temperature and, for air-to-water units, the operation limit temperature. Ask for these before the plant room is drawn.
- Check that both temperatures belong to the exact model offered.
- Ask what the supplementary heater is, an electric element or a boiler, and how much capacity it has.
- If the second source burns fuel, check that its fuel supply and flue are in the design.
Architects rarely size the heat pump themselves. The bivalence point is a short line in a data sheet, but it tells you at which temperature a second source starts to matter.
Frequently asked questions
- Is the bivalence point the lowest outdoor temperature a heat pump can work at?
- No. The lowest value is the operation limit temperature, below which an air-to-water heat pump delivers no heating capacity (Regulation 813/2013, Annex I, point 40). The bivalence point is higher. Between the two, the heat pump still runs but needs supplementary capacity.
- What bivalent temperature does the EU regulation allow?
- Annex III, Table 4 of Regulation 813/2013 sets three values. The reference design temperature is -10 °C. The bivalent temperature is at most +2 °C. The operation limit temperature is at most -7 °C. These are the reference design conditions for heat pumps under average climate conditions.
- Does a bivalent heat pump always need a boiler?
- No. The Regulation says a heat pump space heater may have supplementary heaters. They use electric resistance elements or burn fuel (Article 2, point 17). A boiler is one option, and the common hybrid configuration in the JRC report pairs a heat pump with a condensing gas boiler.
- Who sets the bivalence point?
- The manufacturer declares the bivalent temperature for the appliance. The Regulation does not say how an installer sets the changeover in a particular house. Ask the installer which temperature the controller uses and how it was chosen.
- Where do I find the bivalent temperature of a heat pump?
- In the table of technical parameters (Regulation 813/2013, Annex II, point 5 and Table 2). The installer and user manuals and the manufacturer website must contain it. The table lists the bivalent temperature and, for air-to-water units, the operation limit temperature.
- Does a hybrid heat pump need a gas connection?
- The common hybrid configuration pairs an air-water heat pump with a condensing gas boiler. The JRC report says hybrid heat pumps assume the gas grid stays in place. A system with an electric supplementary heater does not need gas.
Sources
- Commission Regulation (EU) No 813/2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · Publications Office of the European Union (EUR-Lex, Cellar) · Article 2, points 17 and 19; Annex I, points 22, 23, 27, 33, 38, 39, 40; Annex II points 3 and 5 (Table 2); Annex III point 4 and Table 4
- Heat Pumps in the European Union: Status Report on Technology Development, Trends, Value Chains and Markets, 2025 (EUR 40528) · Joint Research Centre, European Commission · Section Hybrid heat pumps