Split heat pump
A heat pump with separate outdoor and indoor units joined by refrigerant lines, so a certified installer must work on the refrigerant circuit.
What is a split heat pump?
A split heat pump is a heat pump with a separate outdoor unit and indoor unit that refrigerant lines connect. The Joint Research Centre (JRC) of the European Commission describes it this way. The JRC says the layout offers flexibility in installation and design. The split layout exists for both main air-source types. An air-to-water split unit heats water for a heating system. An air-to-air split unit, the type used in air conditioners, serves each room with an indoor unit. The JRC lists both. The Slovak name is split tepelné čerpadlo. For the general principle see heat pump.
How is a split heat pump different from a monobloc heat pump?
The difference is where the parts sit. A monobloc heat pump has all components in one outdoor unit. A split heat pump divides them between an outdoor and an indoor unit, and the two units need refrigerant lines between them. The table sets out the points that the JRC states.
| Point of comparison | Split heat pump | Monobloc heat pump |
|---|---|---|
| Main parts | Separate outdoor and indoor units | One outdoor unit with all components |
| Link between the parts | Refrigerant lines | No refrigerant line between units |
| Installation and design | The JRC notes flexibility | Set by the unit as built |
| EU sales 2019 to 2024 (air-to-water) | 315,000 to 374,000 (up 19%) | 108,000 to 357,000 (up 232%) |
Both layouts can contain a refrigerant, so the certification rules below apply to both. The layout changes where the refrigerant work happens. It does not change the need for a specialist.
Which refrigerants do split heat pumps use?
The JRC 2025 report says R410A was the usual refrigerant in air-to-water heat pumps sold in Europe. It says most air-to-air heat pumps on the market use R32. It adds that the F-Gas Regulation drives the industry toward natural refrigerants, and that monobloc units are quickly switching to propane. The report names no similar switch for split units. For the working fluid itself, see refrigerant. For propane, see R290 refrigerant.
Who may install the refrigerant lines in the EU?
Regulation (EU) 2024/573 on fluorinated greenhouse gases sets the rule. Article 5(2), point (c), lists heat pumps among the stationary equipment in scope. Article 10 sets the certification duties.
| Duty | Who must hold it | Where it comes from |
|---|---|---|
| Installation, maintenance or servicing, repair or decommissioning of heat pumps | Certified natural person | Regulation (EU) 2024/573, Article 10(1), point (a) |
| Leak checks of heat pumps | Certified natural person | Regulation (EU) 2024/573, Article 10(1), point (b) |
| Installation, maintenance or servicing, repair or decommissioning by a company | Certified legal person | Regulation (EU) 2024/573, Article 10(2) |
| Giving an activity to another company | The company that gives the work first checks the certificates of the other company | Regulation (EU) 2024/573, Article 10(12) |
The certification also covers relevant alternatives to fluorinated gases, including natural refrigerants, where relevant. Certificates that persons hold under the earlier Regulation (EU) No 517/2014 stay valid under the conditions of their issue (Article 10(9)). Regulation 2024/573 repeals Regulation 517/2014 (Article 37(1)).
What does Slovak law require?
The Slovak act is Zákon č. 286/2009 Z. z. on fluorinated greenhouse gases. The consolidated version in force today is the one effective from 1 January 2022. Slov-Lex lists eight versions of the act, and that one is the last. The text still refers to the repealed Regulation 517/2014, so read it together with Regulation 2024/573.
- Under § 6 ods. 1, the activities that the special regulation names need a certificate of professional competence (certifikát o odbornej spôsobilosti). Only a sole trader or a legal person can hold it.
- Under § 6 ods. 7, the certificate of a sole trader or legal person is valid for one year. The personal certificate of knowledge (osvedčenie o odborných znalostiach) of a natural person is valid for five years.
- Under § 6 ods. 12, the entry qualification for the personal certificate depends on the category. For categories I and II it is secondary vocational education plus an authorisation under special regulations. For categories III and IV it is basic education. This applies to work on stationary refrigeration, air-conditioning and heat pumps that contain fluorinated gases.
- Under § 3 ods. 2, the owner of equipment with 5 tonnes of CO2 equivalent or more of the gases must name an operator within 30 days of commissioning. Under § 5b ods. 4, the operator registers new equipment of that size in the register within 30 days.
What does a leak check cover?
Article 5(1) of Regulation 2024/573 requires leak checks of equipment with 5 tonnes of CO2 equivalent or more of the gases listed in Annex I. Labelled hermetically sealed equipment is exempt if it holds less than 10 tonnes of CO2 equivalent. In residential buildings it is exempt if it holds less than 3 kilograms of the gases. The regulation defines hermetically sealed equipment as equipment whose gas-containing parts the manufacturer made tight at its own premises, for example by welding or brazing. A split system with lines that the installer joins on site does not usually fit that definition. Check the product label and the regulation for the specific unit.
What should the architect ask the installer?
Before the work starts, ask for the certificate of the firm and the certificate of the technician, and check the dates. The specification can name the certificate as a condition of the contract. If the installer gives refrigerant work to a subcontractor, Article 10(12) makes the installer check the subcontractor's certificates. The architect can show the route of the lines, the unit position and the wall openings in the drawings. The certified installer connects the lines and charges the circuit.
Frequently asked questions
- Is a split heat pump the same as an air-to-air heat pump?
- Not always. Split describes the build, with separate outdoor and indoor units joined by refrigerant lines. Air-to-air describes the medium, where the indoor unit warms room air. A split heat pump can be air-to-air or air-to-water, so the two terms answer different questions.
- Does installing the refrigerant lines require a certificate?
- Yes. Regulation (EU) 2024/573 requires certified natural persons for installation, servicing and repair of heat pumps, and a certified company for the work. In Slovakia the sole trader or company also needs a certificate of professional competence under Zákon č. 286/2009 Z. z. Ask for both.
- When is a monobloc heat pump chosen instead of a split system?
- A monobloc keeps all components in one outdoor unit and has no refrigerant lines between units. A split system gives, in the words of the JRC, flexibility in installation and design. The right choice depends on the heating system, the outdoor space and the building.
- Can the architect design the refrigerant route alone?
- The architect can plan the route, the outdoor unit position and the wall openings, and record them in the drawings. A certified installer connects the lines and charges the circuit, and follows the manual of the unit.
- Who checks a split heat pump for leaks?
- A certified natural person, under Article 10(1), point (b), of Regulation (EU) 2024/573. Leak checks apply from 5 tonnes of CO2 equivalent, with exemptions for labelled hermetically sealed equipment. The product label and the regulation show the rule for a given unit.
- Which version of the Slovak F-gas act is current?
- The version effective from 1 January 2022. Slov-Lex lists eight versions of Zákon č. 286/2009 Z. z., and 1 January 2022 is the last. The act still cites Regulation 517/2014, which Regulation 2024/573 repealed.
Sources
- Heat Pumps in the European Union: Status Report on Technology Development, Trends, Value Chains and Markets, 2025 (EUR 40528) · Joint Research Centre, European Commission · Section on hydronic heat pump sales (Figure 7 text), Table 8 and the text on refrigerants
- Regulation (EU) 2024/573 on fluorinated greenhouse gases · Publications Office of the European Union (Official Journal L 2024/573) · Art. 5(1) and (2)(c), Art. 10(1), (2), (9) and (12), Art. 37(1), definition of hermetically sealed equipment
- Zákon č. 286/2009 Z. z. o fluórovaných skleníkových plynoch a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky (Slov-Lex) · § 3 ods. 2, § 5b ods. 4, § 6 ods. 1, 7 and 12