R290 refrigerant (propane)
R290 is propane, a natural hydrocarbon refrigerant with a global warming potential of 0.02 that is flammable and is used in heat pumps.
What is R290 refrigerant and why is it used in heat pumps?
R290 is the refrigerant name for propane, a hydrocarbon that some heat pump makers use as the working fluid in the outdoor unit. It is a natural refrigerant and not a fluorinated gas. The EU F-gas Regulation lists hydrocarbons among the natural alternatives to fluorinated gases, next to air, CO2, ammonia and water. It notes a clear shift to such alternatives in equipment that once used fluorinated gases.
The basic cycle is the same as in any heat pump. The refrigerant evaporates, is compressed, condenses and expands. What changes with R290 is the chemistry of the fluid, and with it the safety rules that apply around the unit. The general behaviour of the working fluid is in the entry on refrigerant. This entry covers only what is specific to propane.
What is the global warming potential of R290?
Annex VI of Regulation (EU) 2024/573 lists propane (R-290) with a 100-year global warming potential of 0.02. The value is based on the Sixth Assessment Report of the IPCC. The Regulation uses this list to calculate the GWP of mixtures. Propane is not an HFC, so the Annex VII quota does not count it.
How does R290 differ from the HFC blends it replaces?
The older blends are synthetic fluorinated gases, mostly hydrofluorocarbons (HFCs). The F-gas Regulation phases these down. Its Annex VII sets the maximum quantity of HFCs that may be placed on the EU market in a given year. The other big difference is flammability. Daikin's installer guide for the Altherma 4 H, which uses R290, says the refrigerant belongs to "Safety class A3". The class is defined in ISO 817 and used in EN 378. The guide adds that this class brings extra requirements for the installation site.
| Aspect | R290 (propane) | HFC blends |
|---|---|---|
| Chemical family | Hydrocarbon, a natural refrigerant | Fluorinated gas, mostly HFCs |
| 100-year GWP | 0.02 (Annex VI) | Listed per substance in Annex I |
| Safety class | A3 in the Daikin manual | Depends on the blend, read the unit's manual |
| Site rules | Protective zone around the outdoor unit in the Daikin manual | Depends on the blend, read the unit's manual |
| EU quota | Not an HFC, so the Annex VII quota does not count it | Counted against the Annex VII quota |
What is the protective zone around an R290 outdoor unit?
The protective zone is the space around the outdoor unit that the manufacturer requires to stay free of openings and ignition sources. It makes the installation safe in the unlikely event of a refrigerant leak. The Daikin manual also says the zone must not extend to adjacent buildings or public traffic areas. Its drawings show the zone in front of a building, at a right or left corner and on a roof. The first three cases have a drawing for the floor and one for an elevated unit. The distances are in those drawings and not in the text, so this entry does not quote them. Take the zone from the installation manual of the exact model.
| Check | What the Daikin manual asks for |
|---|---|
| Openings | No openable windows, doors, ventilation openings or basement entrances into habitable areas inside the zone |
| Ignition sources | No open flames, electrical installations, sockets, lamps, light switches, electrical house connections or sparking tools, neither permanently nor for a short time |
| Hot surfaces | No objects above 360 °C for R290 |
| Neighbours and public areas | The zone must not extend to adjacent buildings or public traffic areas |
| Other units | Only units of the same type may stand in the zone, and the zones add up |
| Roof installation | No ventilation or skylight openings inside the zone |
EN 378 is the European standard for refrigerating systems and heat pumps. Its first part covers requirements for the safety of persons and property and for the environment, definitions, classification and selection criteria. The standard is paid, so this entry describes its scope only. The BSI catalogue page lists the edition BS EN 378-1:2008+A2:2012, so check the current edition before a specification quotes any clause.
How does the F-gas Regulation shape the move to R290?
Regulation (EU) 2024/573 on fluorinated greenhouse gases was signed on 7 February 2024 and published in the Official Journal on 20 February 2024. It repealed Regulation (EU) No 517/2014. Its recitals restate the aim of the Kigali Amendment to reduce HFC production and consumption by more than 80 % over the next 30 years. Annex VII sets the maximum HFC quantity for the EU market at 42 874 410 tonnes of CO2 equivalent for 2025 and 2026. It falls to 21 665 691 tonnes for 2027 to 2029 and to 9 132 097 tonnes for 2030 to 2032.
Annex IV adds placing-on-the-market prohibitions for heat pumps, with dates. The table lists the entries for units up to 12 kW.
| Equipment | Fluorinated gas | Prohibited from |
|---|---|---|
| Self-contained heat pumps up to 12 kW (Annex IV, point 8(b)) | GWP of 150 or more | 1 January 2027 |
| Split air-to-water systems up to 12 kW (point 9(b)) | GWP of 150 or more | 1 January 2027 |
| Self-contained heat pumps up to 12 kW (point 8(c)) | Any fluorinated greenhouse gas | 1 January 2032 |
| Split systems up to 12 kW (point 9(d)) | Any fluorinated greenhouse gas | 1 January 2035 |
Each entry has an exception where a fluorinated gas is required to meet safety requirements at the site of operation. For self-contained units, the GWP limit is then 750 in the 2027 and 2032 entries. R290 has a GWP of 0.02, so it is outside these prohibitions. The Regulation also recognises that heat pumps based on novel refrigerant technologies have different safety requirements. Its training provisions cover the safe handling of equipment that contains flammable or toxic gases (Article 10 and the recitals).
What should you check when an R290 heat pump is specified?
The manufacturer's protective zone decides where the outdoor unit can stand. Draw the zone on the site plan before the positions of windows and doors are fixed. This is practical advice based on the Daikin requirements above.
- Get the installation manual of the exact model. Find the zone drawing for your case: in front of a building, at a corner, elevated or on a roof.
- Check every opening into a habitable room against the zone, including basement entrances and roof vents.
- Check that the zone stays inside the plot and does not reach a neighbouring building or a public path.
- Place sockets, lamps and the electrical connection outside the zone and brief the electrical designer.
- Ask the installer to check the zone in writing before the unit is ordered.
The Daikin guide describes an outdoor unit that contains the R290 refrigerant, so the unit position decides where the zone falls. For the two common layouts, see monobloc heat pump and split heat pump.
Three misconceptions about R290
- "Natural means no safety rules." A natural refrigerant can still be flammable. The Daikin manual classes R290 as A3.
- "A low-impact refrigerant needs no zone." The Daikin manual links the zone to the safety class, not to the climate impact.
- "One zone fits every heat pump." The Daikin guide covers one product family. Other models set their own rules, so the model's manual governs.
Frequently asked questions
- Is R290 refrigerant the same as propane?
- Yes. R290 is the refrigerant name for propane, a hydrocarbon that some heat pump makers use as the working fluid in their outdoor units. It is a natural refrigerant and not a fluorinated gas.
- Is R290 flammable?
- Yes. Daikin's installer guide for its Altherma 4 H says R290 belongs to "Safety class A3" as defined in ISO 817 and used in EN 378. The guide says this class brings extra installation site requirements, which it calls the protective zone.
- Does an R290 heat pump need a protective zone?
- The manufacturer's manual decides. The Daikin manual requires no openings into habitable areas, no ignition sources and no adjacent buildings or public traffic areas inside the zone. Other models set their own rules, so check the manual of the exact model.
- What is the global warming potential of R290?
- Annex VI of Regulation (EU) 2024/573 lists propane (R-290) with a 100-year GWP of 0.02, based on the IPCC Sixth Assessment Report.
- Does the F-gas Regulation restrict R290?
- No. R290 is not a fluorinated gas, so the HFC quota in Annex VII and the prohibitions in Annex IV do not apply to it. The Regulation does name hydrocarbons among the natural alternatives, and its training rules cover the safe handling of flammable gases.
- From when are heat pumps with high-GWP refrigerants prohibited?
- From 1 January 2027, Annex IV of Regulation (EU) 2024/573 prohibits placing two kinds of unit on the market. They are self-contained heat pumps up to 12 kW and split air-to-water systems up to 12 kW. The ban applies if they use fluorinated gases of GWP 150 or more. An exception applies where a fluorinated gas is needed to meet safety requirements at the site.
Sources
- Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 · Publications Office of the European Union (Official Journal L, 20.2.2024) · Recitals 3, 5 and on heat pump training; Article 10; Article 11(1); Article 37(1); Annex IV points 8 and 9; Annex VI; Annex VII
- Daikin Altherma 4 H, EPSK(S)04~14A installer reference guide: Protective zone / Foundation / Drainage (ref. 4P864070-1, edition 2026.09) · Daikin Europe N.V. (manufacturer installer documentation) · Section 1 Protective zone: Outdoor unit (symbols table)
- Refrigerating systems and heat pumps. Safety and environmental requirements. Part 1: Basic requirements, definitions, classification and selection criteria (BS EN 378-1:2008+A2:2012) · BSI (British Standards Institution), knowledge catalogue · Standard title, designation and scope statement