Expansion vessel
An expansion vessel is a sealed tank with a gas-charged membrane that absorbs the extra volume of heated water in heating and drinking-water systems.
What is an expansion vessel?
An expansion vessel is a sealed steel tank. A flexible membrane divides it into two parts. Water sits on one side and a gas charge, usually nitrogen or air, sits on the other. When water heats up it expands. The extra volume pushes the membrane into the gas space and compresses the gas, so it does not push against pipes, valves and the boiler. ESTAV.cz describes this construction. Viessmann calls the vessel a shock absorber for the expansion and contraction of water in a central heating system. The air inside acts like a spring.
The term appears in two kinds of water system: the closed heating circuit of a house, and the drinking-water supply to a water heater. The vessels look alike from the outside, but they serve different water, so the installer picks the right type for each circuit.
How does an expansion vessel work in a heating system?
A closed heating circuit is sealed, so the extra water has nowhere to go unless the system has a vessel. ESTAV.cz explains that closed systems work at a higher water pressure than systems with an open expansion tank. Open tanks need no safety valve, because the water level absorbs the volume change. A closed system must have one. Viessmann notes that a closed heating system, such as one with a combi boiler, has an expansion vessel.
When the water cools, it contracts and the gas pushes the membrane back. The vessel therefore works in both directions. If the gas charge is wrong, the vessel cannot take up the volume change as designed. That is why the pre-charge is a commissioning check, not a value to assume.
What is pre-charge pressure and who sets it?
Pre-charge pressure is the gas pressure on the gas side of the vessel. ESTAV.cz states that an installer sets and checks this pressure only when the water side has no water pressure. It says the work belongs to a qualified professional, not the owner. Viessmann says the boiler manual shows how to calculate the required pressure. In residential systems it is usually around one bar. Take the value from the boiler manual and the installer's calculation. Do not copy a number from another project.
Viessmann describes a simple check on the air side. The vessel has a Schrader valve there. The table below shows how to read the result.
| Observation | What it means |
|---|---|
| Air escapes when the Schrader valve is pressed | The gas side holds a charge |
| No air escapes | There is no pressure in the vessel, so the charge needs attention |
What is the safety valve for, and how does it relate to the vessel?
The safety valve is the backup for the vessel. Grundfos explains that a relief valve is built into the system to protect against failure of the expansion function. In a heating system, relief valve discharge should only occur when the expansion tank system fails. Viessmann describes the same role: if pressure in the system rises too high, the pressure relief valve opens.
Drinking-water systems behave differently. Grundfos notes that relief valve blowdown occurs regularly in hot-water production. A non-return valve stops the water flowing back into the supply, so the pressure rises as the tank reheats after a draw-off. Discharge from the relief valve of a heating circuit is a different matter, because there it points to a failed expansion function.
How does a drinking-water expansion vessel differ from a heating vessel?
The two types serve different water. A heating vessel sits in a closed circuit that holds heating water. A drinking-water vessel sits on the cold feed to a water heater, so the water in it is drinking water. The slides of the Faculty of Civil Engineering at STU (Peráčková, 2023) show both. Vessel 6a stands on the cold supply to the water heater. Vessel 6b stands on the return pipe of the heat source for the heating circuit.
Reflex Winkelmann separates the two in its range. Its Refix line covers drinking and service water. The company describes Refix DD as the potable water specialist for the residential sector, used with water heaters. It states that Refix DD meets the high hygiene requirements of DIN 1988. Refix DT is its drinking water model for large systems. The plain Refix DE is listed for fire extinguishing, raw water and process water systems.
| Feature | Heating vessel (closed circuit) | Drinking-water vessel (cold feed to a water heater) |
|---|---|---|
| Water it holds | Heating water in a sealed circuit | Drinking water on the way to the water heater |
| Position in the STU diagram | On the return pipe of the heat source (6b) | On the cold feed into the water heater (6a) |
| Product range example | Reflex range for heating, solar and cooling systems | Refix DD for residential use, which Reflex says meets DIN 1988 hygiene requirements |
| Relief valve behaviour (Grundfos) | Discharges only if the expansion function fails | Discharge occurs regularly in hot-water production |
How is an expansion vessel different from a hot water buffer tank?
The two can stand in the same plant room, but they do different jobs. A hot water buffer tank stores water for heating, according to Bosch. An expansion vessel stores no useful heat. It only takes up the change in water volume and keeps the pressure in a safe range. The vessel is a pressure component, while the buffer tank is a store.
Drinking water is stored in a different tank again. An indirect hot water cylinder holds drinking water for taps and showers. Heating water from a boiler or heat pump flows through its coil. A project may have all three components, and each needs its own sizing and its own check at commissioning.
What should an architect specify and check for an expansion vessel?
The architect should not size the vessel alone. The heating engineer or the water supply designer calculates the volume and the pre-charge from the system data. The architect makes sure the design leaves room for the vessel and for the check on it.
- Specify the vessel type and its location.
- Keep access to the Schrader valve, because the air-side check needs it.
- Ask for the pre-charge and the fill pressure to be recorded at commissioning.
- Add the vessel to the service schedule of the heating plant.
- For a drinking-water vessel, check on the product data sheet that it is made for drinking water. A vessel made for heating, or for fire and process water, is not a substitute.
Put the vessel where an installer can reach it without removing finishes. Pressure values depend on the building and the system, so take them from the boiler or heat pump manual and the installer's calculation. Do not rely on a generic number from a blog or a retailer listing.
Where does the expansion vessel appear in a house plan?
It appears in the diagram of the heating plant and in the diagram of the hot water preparation. The domestic hot water preparation page describes how a water heater, its cold feed and its safety valve fit together. A heat pump water heater and a thermostatic mixing valve belong to the same hot-water chain. Ask the heating designer to mark each vessel on the diagram. Then the contractor, the installer and the service engineer find the same components.
Frequently asked questions
- What does an expansion vessel do?
- It takes up the extra volume that water gains when it heats up. Viessmann calls it a shock absorber for the expansion and contraction of water in a central heating system. The gas inside compresses like a spring.
- Why does a closed heating system need an expansion vessel?
- A closed system has no open tank to take up the extra water, so it needs a sealed vessel. ESTAV.cz notes that closed systems run at a higher water pressure than systems with an open expansion tank.
- Who sets the pre-charge pressure?
- A qualified installer or service engineer sets and checks it. ESTAV.cz states that this happens only when the water side has no water pressure. Viessmann says the boiler manual shows how to calculate the right value.
- What is the safety valve for if there is an expansion vessel?
- It is a backup. Grundfos explains that a relief valve protects against failure of the expansion function. In a heating system it should only discharge when the expansion tank fails. Viessmann adds that the relief valve opens when system pressure rises too high.
- Is a drinking-water expansion vessel the same as a heating vessel?
- No. Reflex Winkelmann sells separate ranges: one for heating, solar and cooling systems, and the Refix line for drinking and service water. Refix DD and DT are its potable-water models. The plain Refix DE is listed for fire, raw and process water.
- How do I know if the vessel has failed?
- Viessmann describes a check on the air side: pressing the Schrader valve should release air. If no air escapes, there is no pressure in the vessel, so the charge needs attention before the vessel can do its job.
Sources
- What is an expansion vessel? · Viessmann UK · page
- Safety valve · Grundfos, Research and Insights · page
- Zabezpečení otopné soustavy: Co je expanzní nádoba a jak funguje · Topinfo s.r.o. (ESTAV.cz) · page
- Refix drinking and service water systems · Reflex Winkelmann · product range page
- Energetický audit a certifikácia budov: Systémy prípravy teplej vody (lecture, module 2) · Slovenská technická univerzita v Bratislave, Stavebná fakulta, Katedra TZB (doc. Ing. Jana Peráčková, PhD.) · Slides 34-35, diagram of storage water heater connection
- Zásobník teplé vody pro tepelné čerpadlo · Bosch Home Comfort (Czech) · page