Architectural competition
An architectural competition is a procedure in which a jury selects the best design from proposals that several architects submit.
What is an architectural competition?
An architectural competition is a procedure in which an organiser gets design proposals from several architects and an independent jury picks the best one.
The Public Procurement Act calls it súťaž návrhov (design contest). Section 119 ods. 1 of Act 343/2015 Z. z. says it lets the organiser get a proposal, mainly in architecture, spatial planning and building engineering. A jury selects the proposal, with or without prizes.
The Slovak Chamber of Architects (SKA) describes the same process as an investor's procedure. An independent expert jury judges the proposals while the authors stay anonymous. The brief, the conditions, the jury's ranking and the results are public.
A proposal is a written or graphic result of the participant's own intellectual work. It serves as a basis for ordering a planning document, a project or another service, such as an architectural study (§ 119 ods. 2).
Does a private client have to run an architectural competition?
No. A private client may use a design contest only by choice. Section 119 ods. 3 names as organiser anyone who uses the contest voluntarily or where the act requires it.
The act requires it only from public contracting authorities. Under § 120 ods. 2, a contracting authority must use a design contest if the expected value reaches the financial limit set by decree. The decree in force from 1 January 2026 sets three limits:
| Contracting body | Limit for a design contest |
|---|---|
| Slovak Republic through its bodies (§ 7 ods. 1 písm. a)) | 140 000 eur |
| Municipality, higher territorial unit, public-law body or their association (§ 7 ods. 1 písm. b) až e)) | 216 000 eur |
| Contracting entity (obstarávateľ) | 432 000 eur |
Source: Decree 421/2025 Z. z., § 3, from 01.01.2026. The limits change by decree, so check the current decree.
The expected value includes the prizes and, where a service contract follows the contest, the expected value of that contract (§ 120 ods. 3).
What types of design contest exist?
The act knows two types. A public contest (verejná súťaž návrhov) is open to an unlimited number of participants who may submit a proposal. A restricted contest (užšia súťaž návrhov) is open to an unlimited number of participants who may submit a request to take part. The organiser may then limit the number it invites to submit a proposal, using selection criteria stated in the announcement (§ 122 ods. 2 a 3).
The organiser may also split the contest into stages. The aim is to reduce the number of proposals, to at least three if enough suitable proposals exist (§ 122a ods. 1).
| Type | Minimum time | Source |
|---|---|---|
| Public contest | 35 days to submit proposals, counted from sending the announcement to the Publications Office | § 122 ods. 6 |
| Restricted contest, requests to take part | 20 days from sending the announcement | § 122 ods. 7 písm. a) |
| Restricted contest, proposals | 30 days from sending the invitation | § 122 ods. 7 písm. b) |
These times bind a public contracting authority. The same text adds that the time must fit the nature of the contest. It must also allow time to prepare the proposals (§ 122 ods. 8).
How does a design contest run?
A contest under Act 343/2015 runs in the order below. A private organiser may copy it.
- The organiser publishes an announcement and the competition conditions (súťažné podmienky).
- Participants submit proposals anonymously.
- The jury checks that the proposals are complete and excludes late proposals and proposals that break anonymity.
- The jury ranks the proposals by the published criteria and awards the prizes.
- The jury writes the minutes. The organiser publishes the result and tells every participant whose proposal the jury judged.
Steps and tasks come from § 121 to § 125.
The competition conditions must state the organiser, the subject, the type of contest and the circle of participants. They must also name the jury members and give the evaluation criteria with their weights. They must give the number and value of prizes and the total value of rewards for other proposals (§ 123 ods. 2). After the announcement the conditions cannot change. They bind the organiser, the jury and the participants until the signing of the minutes of the results (§ 123 ods. 3).
Who sits on the jury?
The jury has at least five members who are natural persons (§ 124 ods. 1). If the contest requires a professional qualification, at least one third of the members must hold the same or an equal qualification.
A participant, a person close to a participant, and an employee or partner of a participant cannot sit on the jury (§ 124 ods. 2).
The jury is independent. It judges the proposals anonymously and only by the criteria in the conditions. Anonymity lasts until the jury decides the ranking (§ 124 ods. 5).
A person who prepared the selection criteria, the evaluation criteria or the verification of the conditions cannot take part in that contest (§ 122 ods. 9).
What does the Slovak Chamber of Architects do?
The Chamber verifies the competition conditions and gives the organisers expert help with organising and judging the contest (Act 138/1992 Zb., § 24 ods. 2 písm. j)).
The competition conditions state whether the Chamber verified them before publication, for contests in architecture, spatial planning and building engineering (Act 343/2015, § 123 ods. 2 písm. k)).
An architect may not enter a public architectural competition if the Chamber found that the rules of fair competition or the legal rules were broken. Entering anyway is a disciplinary offence (Act 138/1992, § 8 ods. 4).
SKA also publishes its own competition rules (Súťažný poriadok) and applies them next to the acts. The text of these rules is not summarised here.
What rules apply when a private client runs a competition?
A private organiser may use the Civil Code rules on a public competition for a work (§ 847 to 849). SKA lists this route for private organisers.
The announcement must state the exact subject and time limit of the competition, the amount of the prizes and the other conditions. It must also state who judges the conditions, by which date and by which criteria (§ 847).
The organiser must pay the announced prizes to those who met the conditions (§ 848 ods. 1). The organiser may withdraw the competition only for serious reasons (§ 849 ods. 1). On withdrawal the organiser must give fair compensation to those who already met the conditions in whole or in part (§ 849 ods. 2).
Who owns the winning design?
In a contest under Act 343/2015, a proposal that received a paid prize or reward becomes the property of the organiser. The organiser returns the other proposals to the participants (§ 125 ods. 4).
A proposal protected by copyright may be used by the organiser only with the author's consent (§ 125 ods. 5).
A design contest often leads to a service contract with the winner. The organiser must state this in the announcement (§ 121 ods. 3). See design phases and architect fee.
What does a competition cost and how long does it take?
No Slovak act sets a price or a duration for a contest. The minimum times in the table above are the only legal figures.
The organiser sets prizes and rewards in the competition conditions (§ 123 ods. 2 písm. h) a i)). SKA offers a calculator for prizes and rewards on its website. It is the place to check amounts.
The organiser may order a feasibility study or write a design brief before the contest, so that participants receive the same data. The acts do not require this.
Frequently asked questions
- What is the difference between a public and a restricted design contest?
- A public contest (verejná súťaž návrhov) is open to an unlimited number of participants who may submit a proposal. In a restricted contest (užšia súťaž návrhov), participants first send a request, and the organiser may limit how many it invites (Act 343/2015, § 122).
- Can a private client organise an architectural competition?
- Yes. A private client may use the Civil Code rules on a public competition for a work (§ 847 to 849). The Public Procurement Act binds only public contracting authorities, and a private client may copy its steps by choice.
- Who must organise a design contest?
- A public contracting authority must use one if the expected value reaches the limit set by decree (Act 343/2015, § 120 ods. 2). From 01.01.2026 the limit is 140 000 eur for the state and 216 000 eur for municipalities and public-law bodies. It is 432 000 eur for contracting entities.
- What does the Slovak Chamber of Architects do in a competition?
- The Chamber verifies the competition conditions and helps organisers (Act 138/1992, § 24 ods. 2 písm. j)). An architect may not enter a public competition that the Chamber found in breach of the rules (§ 8 ods. 4).
- How many days do participants get to submit a proposal?
- In a public design contest under Act 343/2015, at least 35 days from sending the announcement (§ 122 ods. 6). In a restricted contest, at least 20 days for requests and 30 days for proposals (§ 122 ods. 7).
- Who owns the winning proposal?
- The organiser owns a proposal that received a paid prize or reward (Act 343/2015, § 125 ods. 4). A copyright-protected proposal can be used only with the author's consent (§ 125 ods. 5).
Sources
- Zákon č. 343/2015 Z. z. o verejnom obstarávaní a o zmene a doplnení niektorých zákonov · Slov-Lex · § 119 až 125, § 122a
- Vyhláška Úradu pre verejné obstarávanie č. 421/2025 Z. z., ktorou sa ustanovuje finančný limit pre nadlimitnú zákazku, finančný limit pre nadlimitnú koncesiu a finančný limit pri súťaži návrhov · Slov-Lex · § 3
- Zákon č. 40/1964 Zb. Občiansky zákonník · Slov-Lex · § 847 až 849
- Zákon Slovenskej národnej rady č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex · § 8 ods. 4, § 24 ods. 2 písm. j)
- Čo je architektonická súťaž · Slovenská komora architektov
- Legislatívny rámec súťaže · Slovenská komora architektov