Window micro-ventilation
Window micro-ventilation is a position of a tilt-and-turn or casement sash that holds the window open by a few millimetres.
What is window micro-ventilation?
Window micro-ventilation, in Slovak mikroventilácia okna, is a sash position in which the window stays open by a few millimetres. A special lock holds the sash slightly away from the frame, so air passes through a narrow gap without a wide-open window. The position belongs to the window hardware. The maker STAC sells a kit with a slider and a lock for turn-tilt and casement windows. In that kit the sash stays open between 1 and 6 mm.
Makers use different names for the same kind of feature. MACO writes about a gap or night-vent position. Approved Document F, the English guidance on ventilation, speaks of a window with a night latch position. When you read an offer, ask the supplier which of these the window has.
Which handle positions does a tilt-and-turn window have?
A tilt-and-turn window has several lever positions. The operating instructions of the maker MACO list four. The table gives the use that the maker names for each position.
| Sash position | What MACO says it is for |
|---|---|
| Closed | The room is unattended or no ventilation is wanted |
| Turned (rotational) | Short-term, rapid ventilation of the room, or cleaning the outside of the window |
| Gap or night-vent | Longer airing at low outdoor temperatures |
| Tilted | Continuous ventilation of the room |
This table shows one maker. Other makers may use other positions and other words. Read the operating instructions of the hardware in your window.
How wide is the gap, and how much air passes through it?
The only gap we found is the one for the STAC kit, 1 to 6 mm. The product sheet reports that the window passed an air permeability test in the micro-opening position and reached Class 1 under UNE 12207. The tested sample was a double sash window of 1246 by 1500 mm. The sheet gives no free area and no airflow, so it does not tell you how much fresh air the gap supplies.
The Passive House Institute writes that infiltration through cracks in the envelope depends on wind and temperature and fluctuates very significantly. It adds that a leaky building may admit enough air in calm weather and have unacceptable draughts in high wind. A fixed gap has no sensor and no regulator, so ask the supplier for tested airflow data for the exact hardware.
How is micro-ventilation different from a trickle vent?
Both let a small amount of outdoor air into the room, so people confuse them. A trickle vent is a separate ventilator in the window or the wall. The Department for Communities of Northern Ireland writes that trickle ventilation through window and wall vents allows a steady but controllable flow. Approved Document F says background ventilators should be controllable and are intended to be left open.
| Feature | Micro-ventilation | Trickle vent |
|---|---|---|
| What it is | A sash position set by the window hardware (STAC, MACO) | A vent in the window or the wall (Northern Ireland note) |
| When the opening exists | Only while the handle is in that position | Intended to be left open (Approved Document F) |
| Control | The occupant turns the handle | Controllable, by hand or automatically (Approved Document F, 1.29) |
| Standing in English guidance | A night latch position is not adequate for background ventilation | A background ventilator |
Micro-ventilation is not a separate ventilator. It is a position of the sash, and the gap exists only while the handle stays in that position. The window remains a window. A full airing with the sash wide open is another job, and the entry on purge ventilation covers it.
Can a micro-ventilation position serve as a background ventilator?
In England it cannot. Approved Document F, 2026 edition, says in paragraph 1.52 that all rooms with external walls should have background ventilators. A note to that paragraph says a window with a night latch position is not adequate for background ventilation. The note gives three reasons: the risk of draughts, security issues and the difficulty of measuring the equivalent area.
The same document says in paragraph 1.30 that background ventilators should be at least 1700 mm above floor level. This reduces cold draughts, but the occupant can still reach them. These are English guidance for dwellings in England. They are not Slovak requirements, but they show how a ventilation guide treats the sash gap.
Can I leave a window on micro-ventilation all winter?
The German Environment Agency (Umweltbundesamt) writes about tilted windows. It says that a window left tilted for a long time greatly raises energy use and heating costs. The wall along the window can cool quickly, and condensation can lead to mould. The agency recommends regular short airing with the window wide open instead.
That text does not cover the micro-ventilation position. MACO describes its gap position as one for longer airing at low outdoor temperatures. We found no measurement of the heat loss through such a gap. If you use the position in winter, watch the room temperature and the surfaces beside the window.
Can micro-ventilation replace a planned ventilation system?
The US Department of Energy describes natural ventilation as uncontrolled air movement through windows, doors or cracks. It links moisture problems to uncontrolled air flow. It advises you to seal the air-leakage paths first and then consider controlled ventilation, because fresh air may still be needed after air sealing. A sash gap is not a controlled supply.
For a tight house, the air supply comes from a room-by-room plan. The plan may use natural cross-ventilation, a wall inlet, a trickle vent or heat recovery ventilation. An extract fan in the kitchen and the bathroom removes moisture where it is made.
What do Slovak rules say about it?
Decree 259/2008 Z. z., in the version effective from 4 September 2025, sets the ventilation duty. Under § 3 ods. 1, all interior spaces with long-term or short-term stay of people must be ventilated, naturally or mechanically. Under § 3 ods. 3, natural ventilation suits spaces without pollutant and heat sources where one to two air changes are enough. A calculation sets the method, the position and the size of the supply and exhaust openings. Doors do not count as such openings.
We found no provision in Decree 259/2008 or Decree 364/2012 that names micro-ventilation or gives an airflow value for it. Decree 364/2012 Z. z. on energy performance of buildings, in the consolidated version of 10 March 2020, has a separate rule in Annex 3, note q. The heat-demand calculation should include a minimum average air change of 0.5 per hour. It may use a higher value calculated under STN 73 0540-2. That figure is an input to an energy calculation. It is not a rule about a window position.
What should you do before ordering windows?
- Ask the supplier whether the offered hardware has a gap position, and what the maker calls it.
- Ask for tested airflow data for that hardware, and treat it as product data.
- Ask the designer how fresh air reaches each room, because Decree 259/2008 asks for a calculation of the openings.
- Decide where the handle rests at night, and think about security and draughts for ground-floor and street-side rooms.
Frequently asked questions
- Is window micro-ventilation the same as a trickle vent?
- No. Micro-ventilation is a sash position set by the window hardware, so the gap exists only while the handle is in that position. A trickle vent is a separate ventilator in the frame or the wall. Approved Document F says such ventilators are meant to stay open.
- How wide is the micro-ventilation gap?
- For one STAC kit the sash stays open between 1 and 6 mm. Other hardware can differ, and that product sheet gives no free area or airflow. Ask the supplier for the data for your window.
- Can I leave a window on micro-ventilation all winter?
- MACO describes its gap position as a position for longer airing at low outdoor temperatures. We found no measured heat loss for it. The German Environment Agency warns that a window left tilted for long periods greatly raises energy use. It recommends regular short airing instead.
- Does micro-ventilation stop condensation and mould?
- Not reliably. The US Department of Energy links moisture problems to uncontrolled air flow and advises sealing leaks first, then adding controlled ventilation if needed. Extract fans in kitchens and bathrooms remove moisture at the source.
- Which windows have a micro-ventilation position?
- STAC sells a kit for turn-tilt and casement windows with a Euro groove, and MACO lists a gap position for its turn-tilt hardware. Whether your window has one depends on its hardware, so check the offer before you order.
- Does a night latch position count as background ventilation?
- In English guidance it does not. Approved Document F, paragraph 1.52, says a window with a night latch position is not adequate for background ventilation. It names draughts, security issues and the difficulty of measuring the equivalent area.
Sources
- Adjustable microventilation Euro groove F114401 (product page) · STAC (manufacturer) · Technical characteristics and tests
- MACO Multi turn-only and turn&tilt hardware: operating and maintenance instructions for end users · MACO · Table 'Turn&tilt hardware with night-vent', lever and sash positions
- Approved Document F, Volume 1: Dwellings (2026 edition, for use in England) · UK Government (Building Regulations 2010) · Paragraphs 1.29, 1.30 and 1.52 with its note
- Guide to Home Ventilation · U.S. Department of Energy · Types of home ventilation; Stop air leaks
- Ventilation in Passive House · Passive House Institute (passivehouse.com) · Why ventilate; exhaust-only systems
- Technical note: ventilation · Department for Communities, Northern Ireland · Ventilation, paragraph on modern buildings
- Wie lüfte ich richtig? Tipps und Tricks zur Schimmelvermeidung · Umweltbundesamt (German Environment Agency) · Ständig angekippte Fenster vermeiden; Stoßlüften
- Vyhláška MZ SR 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov · Ministerstvo zdravotníctva SR, via Slov-Lex · § 3 ods. 1 a 3
- Vyhláška 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov, úplné znenie od 10. 3. 2020 · Ministerstvo dopravy a výstavby SR, via Slov-Lex · Príloha č. 3, poznámka q) a poznámka 14)