Humidity-controlled ventilation

Humidity-controlled ventilation is a ventilation system whose airflow follows the relative humidity measured in the home.

What is humidity-controlled ventilation?

Humidity-controlled ventilation is a way of running a ventilation system so that the airflow follows the moisture in the home instead of a fixed schedule. The system measures relative humidity, which is the water vapour in the air compared with the amount the air could hold at that temperature. The airflow rises when humidity climbs, for example during intensive use of a room, and drops when the air dries again.

It is a control method, not a separate kind of system. It sits next to demand-controlled ventilation, which can respond to several signals. Humidity-controlled ventilation is the narrower case in which humidity is the signal. The hardware differs between manufacturers, so each product needs checking.

How does a humidity sensor change the airflow?

In one common design, the sensors sit in the extracted air. Dantherm describes built-in humidity sensors that constantly measure the moisture content of the extracted air. The unit adjusts the fan speed automatically to that reading. This reduces energy use during periods with less need for ventilation. The same manufacturer notes that an optional CO2 and/or VOC air quality sensor can also control the demand.

The Dantherm units described on that page are balanced systems. The manufacturer says they supply fresh air to living rooms and bedrooms. They extract air from the kitchen, bathroom, toilet and utility room. They also reuse up to 96 percent of the heat of the exhaust air. That figure is the manufacturer's own claim for its units. It shows that humidity control and heat recovery can be combined in one unit.

How do humidity-controlled inlets and extract units work?

A second design controls the openings instead of the fan speed. The trade information site baunetzwissen describes a humidity-controlled extract system without heat recovery. A plastic band needs no auxiliary energy and moves an opening element in the supply air element. When relative humidity is high, which indicates intensive use of the area, larger supply openings give a greater air change. Outside the period of use, the airflow of the area is reduced to a minimum. Because the measurement is made area by area, each area can open by a different amount.

The table below sets the two designs side by side.

FeatureFan-speed control (Dantherm)Opening-controlled supply (baunetzwissen)
Where humidity is measuredExtracted airRelative humidity in each area
What the control changesFan speedSize of the supply opening
ActuatorFan controlPlastic band, no auxiliary energy
Heat recoveryYes in the units described, by the manufacturer's claimNo in the system described
Optional add-onCO2 and/or VOC sensorNot stated in the source

What does English guidance say about humidity controls?

Approved Document F, Volume 1, is the guidance for dwellings under the Building Regulations of England. This page uses the 2021 edition. The government page also lists a 2026 edition. It says earlier editions still apply to buildings under the earlier standards, so check the edition for each project. None of this is Slovak law.

Paragraph 1.35 says automatic controls on continuously running fans might include sensors for humidity, occupancy or pollutant release. Paragraph 1.36 says humidity sensors may control a kitchen or bathroom. They should not control sanitary accommodation, where odour is the main pollutant. Paragraph 1.50 says any automatic control on an intermittent extract fan, such as a humidity control, should have a manual override. The occupant can then turn the extract on or off.

What do Slovak rules say about ventilating wet rooms?

Decree 259/2008 Z. z. on the indoor environment of buildings says that all indoor spaces where people stay must be ventilated, naturally or mechanically (§ 3 ods. 1). It says ventilation of wet rooms must work under negative pressure, possibly combined with local extraction (§ 3 ods. 16). Decree 532/2002 Z. z. says a space for personal hygiene, a WC, a cooking space and a larder must be adequately ventilated (§ 17 ods. 5). Decree 532/2002 stays in force until the implementing decrees of the new building act 25/2025 Z. z. take effect, and at the latest until 31 March 2027 (§ 84 ods. 23 písm. b).

These provisions say what the ventilation must achieve. The provisions read for this page do not say how it is controlled, so humidity control is a design choice, not a requirement.

What humidity levels do the sources use as a reference?

Dantherm gives one winter figure. Its page says that in northern Europe the relative humidity in a home varies with the weather outside. In winter it should be around 40 to 45 percent and never under 35 percent. The page gives no maximum setpoint and no figures for other seasons. These values are the advice of one manufacturer, not a design rule.

Approved Document F gives upper limits for new dwellings instead. Paragraph B11 sets a test. In the colder months, the moving average relative humidity of a room should stay below the Table B3 values. The criterion itself, in paragraph B2, is no visible mould on the inner surfaces of external walls. It applies to a properly heated dwelling with typical moisture generation.

Reference pointValue givenSource
Winter indoor relative humidity, targetAround 40 to 45 percentDantherm
Winter indoor relative humidity, lower limitNever under 35 percentDantherm
Colder months, upper limit as 1-month moving average, new dwellings in EnglandBelow 65 percentApproved Document F, Table B3
Colder months, upper limit as 1-week moving averageBelow 75 percentApproved Document F, Table B3
Colder months, upper limit as 1-day moving averageBelow 85 percentApproved Document F, Table B3

The Slovak decree 259/2008 Z. z. also says that no visible traces of mould, leaks or condensation may appear on the ceiling, walls or floor of spaces where people stay. If they appear, the defect is removed by changing the construction (§ 2 ods. 11).

Where does humidity-controlled ventilation fit in an existing house?

Baunetzwissen presents humidity-controlled ventilation without heat recovery as a compromise where a heat-recovery unit is not always easy or cheap to fit. It calls the solution simple and cost-effective, especially in existing buildings. It says the energy saving is lower than with heat-recovery systems, but that demand-based operation ventilates only as much as needed. The same source states that mould risk can be significantly reduced. For a tight building envelope it strongly recommends at least one controlled ventilation system without heat recovery.

In practice, this makes the approach a candidate for renovations in which ducts are hard to route. It does not replace planning of the air flows. Practical fan and inlet choices are covered in extract fan and wall air inlet.

How does it compare with heat-recovery ventilation?

The main difference is what happens to the heat in the extracted air. A heat-recovery ventilation unit transfers heat from the outgoing air to the incoming air. The humidity-controlled system that baunetzwissen describes does not. The two approaches answer different questions. Humidity control reduces the airflow when it is not needed. Heat recovery reduces the energy lost in the exhaust air.

QuestionHumidity-controlled extract system without heat recoveryHeat-recovery ventilation
Recovers heat from extracted airNo, in the design described by baunetzwissenYes
Energy saving compared with the otherLower (baunetzwissen)Higher (baunetzwissen)
Humidity control possibleYes, it is the control signalYes, in the Dantherm units described above

What are the common misconceptions?

The first misconception is that humidity control alone guarantees fresh air. Humidity is a proxy, and it does not show every air quality problem. Dantherm offers optional CO2 and VOC sensing, and Approved Document F lists occupancy and pollutant sensors next to humidity sensors, for this reason.

The second misconception is that a sensor can be placed anywhere. Both designs depend on the sensor reading air that represents the area. We suggest asking the manufacturer where the sensor sits. A sensor in one wet room can give a misleading picture of the whole home.

The third misconception is that a humidity-controlled system saves as much energy as heat recovery. The trade source says it does not. It can still be the better choice where heat recovery is not practical, but the saving should be presented as smaller, not as equal.

Frequently asked questions

Is humidity-controlled ventilation the same as demand-controlled ventilation?
Not exactly. Humidity-controlled ventilation uses relative humidity as its control signal. Approved Document F, the English guidance for dwellings, says automatic controls might also use occupancy or pollutant sensors. Dantherm offers optional CO2 and VOC sensors.
Does humidity-controlled ventilation replace a heat-recovery unit?
No, it answers a different question. The trade source baunetzwissen describes a humidity-controlled extract system without heat recovery and says its energy saving is lower than with heat-recovery systems. Humidity control can also be added to a unit that does recover heat, as in the Dantherm units.
What humidity range should I aim for?
The manufacturer Dantherm gives a winter indoor target of around 40 to 45 percent and never under 35 percent, for northern Europe. That is one brand's advice, so take the setpoints from the documentation of the product you specify.
Does humidity-controlled ventilation reduce mould risk?
The baunetzwissen page says mould risk can be significantly reduced, but it gives no figures. Mould control also depends on the building envelope, heating and occupant behaviour, so the ventilation system is one part of the answer.
Can a humidity sensor control the fan in a WC?
English guidance says no. Approved Document F, paragraph 1.36, allows humidity controls in a kitchen or bathroom. It says they should not control sanitary accommodation, where odour is the main pollutant. This is English guidance, not a Slovak rule.
Does Slovak law require humidity-controlled ventilation?
No provision read for this page requires it. Decree 259/2008 Z. z. requires wet rooms to be ventilated under negative pressure (§ 3 ods. 16), and it leaves the control method open.

Sources

  1. Feuchtegesteuerte Lüftung · baunetzwissen.de · Whole article
  2. How does humidity-controlled ventilation work? · Dantherm · Mechanism, sensor description and winter setpoint
  3. The Building Regulations 2010, Approved Document F, Volume 1: Dwellings (2021 edition), for use in England · UK Department for Levelling Up, Housing and Communities, via gov.uk · paragraphs 1.35, 1.36, 1.50, B2, B10, B11 and Table B3
  4. Ventilation: Approved Document F · UK Department for Levelling Up, Housing and Communities, via gov.uk · publication page
  5. Vyhláška 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov · Slov-Lex · § 2 ods. 11; § 3 ods. 1 a 16
  6. Vyhláška 532/2002 Z. z. o všeobecných technických požiadavkách na výstavbu · Slov-Lex · § 17 ods. 5
  7. Zákon 25/2025 Z. z. Stavebný zákon · Slov-Lex · § 84 ods. 23 písm. b