Extract fan
An extract fan is a fan that removes stale, moist air from wet rooms such as bathrooms, WCs and kitchens, and sends it outside.
What is an extract fan?
An extract fan (odsávací ventilátor) is a fan that removes stale, moist and polluted air from a room and sends it outside. It is usually fitted in a bathroom, a WC or a kitchen, where showers and cooking add water vapour and odours. The fan only removes air. Fresh air has to enter somewhere else, through a gap, a wall opening or a supply system, and that is the part many installations forget.
An open window or a vent in a wall also removes air, by natural draught. An extract fan adds a motor, so removal does not depend on the wind or on someone remembering to open a window. This page covers the fan itself. The wider question of how a whole dwelling is ventilated is covered on the exhaust-only ventilation page and on the balanced ventilation system page.
Which rooms need an extract fan?
The rooms that need extraction are the wet rooms: kitchens, bathrooms, shower rooms and WCs. Approved Document F is the guidance for dwellings under the Building Regulations of England. It says intermittent extract fans should be fitted in all wet rooms (paragraph 1.47). If a wet room has no external wall, the fan should extract at four air changes per hour (paragraph 1.48). For a WC, the extract rate can also be met with windows, by following the purge ventilation guidance (paragraph 1.49).
This page uses the 2021 edition of Approved Document F, Volume 1. The government page also lists a 2026 edition. It says earlier editions still apply to buildings under the earlier standards, so check the edition for each project. The section on intermittent fans with background ventilators is guidance suitable only for less airtight dwellings. All of this is English guidance, not Slovak law.
Slovak rules set the aim, not the fan. Decree 532/2002 Z. z. says a space for personal hygiene, a WC, a cooking space and a larder must be adequately ventilated (§ 17 ods. 5). Decree 259/2008 Z. z. says ventilation of wet rooms must work under negative pressure, possibly combined with local extraction (§ 3 ods. 16). Decree 532/2002 stays in force until the implementing decrees of the new building act 25/2025 Z. z. take effect, and at the latest until 31 March 2027 (§ 84 ods. 23 písm. b). This page gives no Slovak flow rates, because the sources read here do not state any.
How do run-on timers and humidity sensors work?
An extract fan can be started by hand, by a timer, or by a humidity sensor. Each control answers a different problem, and the choice decides how long the fan runs and whether it runs when nobody is in the room.
| Control | What it does | What Approved Document F (England) says |
|---|---|---|
| Manual switch | The fan runs only while the user operates it | Ventilation should be controllable, and controls may be manual or automatic (paragraph 1.33) |
| Run-on timer | The fan keeps running for a set time after it is switched off | In a room with no openable window, the fan should keep running for at least 15 minutes after the room is vacated (paragraph 1.51). At commissioning, the installer checks that any run-on timers are set to at least 15 minutes (paragraph 4.6) |
| Humidity sensor | The fan starts when the air becomes damp and stops when it dries | May be used in a kitchen or bathroom, but should not be used for sanitary accommodation (paragraph 1.36) |
The guidance also asks that any automatic control, including a humidity control, has a manual override. The occupant can then switch the extract on or off (paragraph 1.50). A sensor set too high switches the fan on late, after the mirror has already misted, so we suggest testing the setting after installation. That is design advice, not a rule.
Why does an extract fan need a make-up air path?
An extract fan removes a volume of air every second. A closed room cannot lose air without gaining it from somewhere, so the same volume has to come in. If it cannot enter through a deliberate route, it comes through whatever gap is easiest, such as a door undercut or a loose window frame. The Passive House Institute notes that the simple exhaust system supplies cold air to the rooms, so the heat loss is high. Approved Document F warns that ventilation fans might cause combustion gases to spill from an open-flued appliance (paragraph 0.17). This can happen even when the fan and the appliance are in separate rooms.
English guidance treats the inflow as a design step. Rooms with external walls should have background ventilators, which are small, controllable openings for whole-dwelling ventilation (paragraph 1.52). A window with a night latch position is not adequate for background ventilation. The reasons are the risk of draughts, security issues and the difficulty of measuring the equivalent area (note to paragraph 1.52). For the Slovak equivalent of such an opening, see the wall air inlet page. For the window route, see window micro-ventilation. If a fan and a background ventilator are in the same room, they should be at least 500 mm apart (paragraph 1.55). The document gives no reason for that distance.
How does an extract fan compare with a balanced system?
An extract fan is the simplest form of mechanical ventilation. It removes air and relies on openings elsewhere for supply. A balanced system moves both streams, and it can include heat recovery between them. The table sets out the differences that the Passive House Institute article describes.
| Feature | Extract fan (exhaust-only system) | Controlled supply and exhaust system |
|---|---|---|
| Air it moves | Extracts stale and humid air from kitchens and bathrooms | Supplies fresh air to living, working and sleeping rooms and extracts used air from rooms with high pollutant loads |
| Source of fresh air | Fresh air flows in through inlet air valves, pulled by the small negative pressure of the fan | Supply air valves in the living, working and sleeping rooms |
| Heat recovery | None in the simple system | Open to heat recovery from the exhaust air |
| Fit for a Passive House | Not suitable, because cold air enters the rooms and the heat loss is too high | Recommended as most suitable |
The same article says fresh air in the second system flows through overflow zones such as the hall into the wet rooms. Wet rooms get a high ventilation rate, and towels dry quickly there.
How do I choose a fan and plan the duct?
Approved Document F lists BS EN 13141-4 as the test standard for intermittent extract fans (Table 1.5). Check the flow and pressure data of the chosen fan. The figures come from a test rig, not from your wall. For a ducted fan, the installer checks that the duct and the terminals reach the design criteria and do not reduce performance (paragraph 4.7a).
We suggest keeping the duct short and straight, because each bend and each metre add resistance. Where the duct crosses an unheated space, ask the designer whether the moist air can condense inside it. Ask also whether the outlet needs a shutter against backdraught when the fan is off. These points are design advice, and we found no source that sets them as rules.
What are the common misconceptions about extract fans?
- An extract fan ventilates the whole flat. It ventilates only the room it serves, and the rest of the dwelling still needs its own supply path.
- A bigger fan is always better. An oversized fan can pull more cold air through every gap, and Approved Document F warns about fans and open-flued appliances (paragraph 0.17).
- A humidity sensor replaces background ventilation. A sensor only starts the fan. The air still needs a route in, which English guidance covers with background ventilators (paragraph 1.52).
- The 15-minute run-on is a Slovak rule. It comes from English guidance for a room with no openable window.
Frequently asked questions
- Does an extract fan need a window in the same room?
- Not under English guidance. Approved Document F covers a room with no openable window. The fan should run on for at least 15 minutes after the room is vacated (paragraph 1.51). For a WC, it also allows windows to meet the extract rate (paragraph 1.49).
- Should a bathroom extract fan run all the time?
- Not necessarily. English guidance separates intermittent fans, which run when needed, from continuous fans. Continuous fans run without occupant action and may have a high-rate control (paragraph 1.35). Continuous running is a separate design choice and needs its own air supply plan.
- Can a humidity sensor control a WC fan?
- English guidance says no. Approved Document F allows humidity controls in a kitchen or bathroom. They should not control sanitary accommodation, where odour is the main pollutant (paragraph 1.36). A switch or a timer is the alternative.
- Can an extract fan replace a balanced ventilation system?
- Only for the wet rooms. An extract fan does not supply fresh air to the living rooms and does not recover heat from the exhaust air. A balanced system supplies and extracts air, and it can include heat recovery.
- What do Slovak rules say about extract fans in a bathroom?
- Decree 532/2002 Z. z. says a space for personal hygiene, a WC and a cooking space must be adequately ventilated (§ 17 ods. 5). Decree 259/2008 Z. z. says ventilation of wet rooms must work under negative pressure (§ 3 ods. 16).
- Does the 15-minute run-on apply in Slovakia?
- No Slovak source read for this page states it. The 15-minute run-on comes from Approved Document F, which is English guidance. For a Slovak project, ask the designer which run-on time applies.
Sources
- The Building Regulations 2010, Approved Document F, Volume 1: Dwellings (2021 edition), for use in England · UK Department for Levelling Up, Housing and Communities, via gov.uk · paragraphs 0.17, 1.33, 1.35, 1.36, 1.47 to 1.52, 1.55, 4.6, 4.7 and Table 1.5
- Ventilation: Approved Document F · UK Department for Levelling Up, Housing and Communities, via gov.uk · publication page
- Ventilation in Passive House · Passive House Institute, passivehouse.com · article text
- Vyhláška 532/2002 Z. z. o všeobecných technických požiadavkách na výstavbu · Slov-Lex · § 17 ods. 5
- Vyhláška 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov · Slov-Lex · § 3 ods. 16
- Zákon 25/2025 Z. z. Stavebný zákon · Slov-Lex · § 84 ods. 23 písm. b