Purge ventilation
Purge ventilation is opening several windows wide for a few minutes to replace room air fast while the walls stay warm.
What is purge ventilation?
Purge ventilation is opening one or more windows wide for a short time, so the room air changes fast. The Umweltbundesamt (UBA), the German Environment Agency, states the aim. The aim is a high air change in a short time, without the walls and surfaces cooling too much. It advises opening several windows at the same time.
The Slovak name is nárazové vetranie. It is a habit of the occupants, not a built-in system. It sits next to the slower background airflow that a building needs all the time. See air change rate for how to count that airflow.
How long and how often should you air this way?
The UBA gives times by season and by room. They depend on temperature and wind. When it is warm, the air changes more slowly because indoor and outdoor temperatures are almost equal, so the airing must last longer.
| Situation | UBA advice |
|---|---|
| Cold season, whole home | 2 to 3 times a day, about 5 minutes per room, windows wide open |
| Bedroom in the morning | 5 to 10 minutes after getting up, window wide open |
| Kitchen and bathroom | 5 to 10 minutes during and just after cooking or showering |
| Warm season | Usually longer, 10 to 20 minutes per airing |
The Department for Communities in Northern Ireland gives a general idea in its technical note on ventilation. It says to open windows fully for about ten minutes a day where possible. The UBA also advises a bedroom to be aired intensively before going to sleep.
Why is a tilted window a poor substitute?
A tilted window opens only the top of the sash and stays open for long periods. The UBA states that energy use and heating costs rise sharply when windows stay tilted for a long time. It also states that the wall along the window can cool quickly, which can lead to mould from condensed water.
Condensation needs a cold surface. The CIBSE Journal explains the dew point. Air at 100 percent relative humidity cannot hold more water vapour. Below that temperature, the vapour condenses out as liquid water. The UBA therefore recommends regular airing with a short, wide opening as the better way. See relative humidity for the link between temperature and moisture in air.
| Way of getting air | What the sources say |
|---|---|
| Short, wide opening | UBA: high air change in a short time, surfaces cool little |
| Window tilted for a long time | UBA: heating costs rise sharply, the wall along the window can cool and grow mould |
| Trickle vent or outdoor air inlet | UBA: gives air exchange that does not depend on occupant behaviour. CIBSE: often shut, and a painted-over vent can cause mould (Northern Ireland note) |
How is purge ventilation different from cross ventilation?
Purge ventilation is about how long and how wide the openings are. Natural cross-ventilation is about the air path through the building. The UBA says the air change becomes much larger when windows on opposite facades are open at the same time. The two methods add together: a short burst with a through-draught changes the air faster than a burst at one window.
How do trickle vents and purge ventilation fit together?
Purge bursts clear short moisture peaks. A background supply works all day. The UBA says that in an airtight building, outdoor air inlets and ventilation systems can ensure an air exchange. That exchange does not depend on what the occupants do. That can improve the removal of moisture in many cases.
The CIBSE Journal calls trickle vents an essential component of continuous mechanical extract ventilation systems. It reports that people often shut them because of draughts and heat loss. A government study found only 29 percent open in 80 new dwellings. The Northern Ireland technical note warns that a vent painted over can lead to condensation, black mould and poor air quality inside.
For a system that reacts to moisture, see humidity-controlled ventilation. For the leakage that already moves air through the envelope, see air infiltration. A window with a built-in gap position is a different thing from a full opening. See window micro-ventilation.
Does purge ventilation replace a ventilation system?
It depends on what the house has. The UBA says that where a ventilation system serves the whole dwelling, window airing can often be almost dropped. Bursts are then needed only at moisture peaks, when odours appear or when pollutants rise. Some homes have a system in only some rooms, such as a bathroom extract fan or a decentralised unit. Then the occupants must air the other rooms through the windows.
The CIBSE Journal adds a case with natural ventilation. There an intermittent extract fan works as purge ventilation and removes high levels of moisture or pollutants. The trickle vents then supply the whole dwelling with background air.
What does Slovak law say about ventilation?
Decree 259/2008 Z. z. on the indoor environment of buildings sets the rules. Section 3 (1) says all indoor spaces where people stay must be ventilated, either naturally or mechanically. Section 3 (3) allows natural ventilation in spaces without sources of pollutants and heat. It applies where one to two air changes per hour are enough. A calculation sets the position and size of the openings, and doors do not count as openings.
For living rooms, section 3 (10) asks for fresh air per person under the valid technical standard. The decree does not give airing times for the occupants. The minutes in this article come from the UBA, a German agency, as practical advice and not as a Slovak legal rule.
How does purge ventilation relate to summer night airing?
People can use the same wide opening at night in the warm season. That practice has its own purpose. Read night purge ventilation for it. The UBA also advises airing cellars at night or in the cool morning hours in summer. Warm air that enters a cold cellar can condense on the wall.
What should you check after a renovation?
The UBA says an energy renovation makes the envelope tighter and reduces the passive air exchange. Active ventilation must make up for the loss. The UBA also says to keep relative humidity between 40 and 60 percent to lower the risk of mould. A simple hygrometer helps to watch it. It advises keeping the doors of cooler bedrooms closed. Warmer and more humid air from other rooms can condense on cold surfaces there. Landlords and designers should tell occupants how to adapt their airing after the work.
Frequently asked questions
- Is purge ventilation the same as leaving a window tilted?
- No. Purge ventilation opens windows wide for a few minutes. A tilted window stays open for a long time. The UBA warns that long-term tilting raises heating costs sharply and can cool the wall along the window, which can lead to condensation and mould.
- How long should I open the windows for purge ventilation?
- In the cold season the UBA says about 5 minutes per room, 2 to 3 times a day, is enough, depending on temperature and wind. In the warm season it advises 10 to 20 minutes per airing. A bedroom, kitchen or bathroom needs 5 to 10 minutes after the activity.
- Should trickle vents stay open in winter?
- Yes, if they are the building's background ventilation. The CIBSE Journal calls trickle vents an essential component of continuous extract ventilation and says people often shut them because of draughts. A government study cited there found only 29 percent open in 80 new dwellings.
- Can purge ventilation replace a ventilation system?
- Not in a house where a system is the planned air supply. The UBA says that with a whole-dwelling system, window airing can often be almost dropped. Occupants then open windows only for moisture peaks, odours or extra pollution. Rooms without a system still need window airing.
- Is cross ventilation better than purge ventilation?
- They combine. The UBA says the air change becomes much larger when windows on opposite facades are open at the same time. Cross ventilation describes the air path. Purge ventilation describes a short, wide opening.
- Do I need to air differently after new windows or insulation?
- Often yes. The UBA says an energy renovation makes the envelope tighter and reduces the passive air exchange. More active ventilation must make up for it. Check airing habits after the work, and use a hygrometer to follow humidity.
Sources
- Wie lüfte ich richtig? Tipps und Tricks zur Schimmelvermeidung · Umweltbundesamt (German Environment Agency) · Stoßlüften; Ständig angekippte Fenster vermeiden; Lüftungsverhalten nach der Sanierung; Lüftungsanlagen
- Technical note: ventilation · Department for Communities, Northern Ireland · Ventilation in modern buildings
- Ventilation vigilance: key strategies to combat mould in housing · CIBSE Journal · Relative humidity and the dew point; trickle vents
- Vyhláška MZ SR č. 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov a o minimálnych požiadavkách na byty nižšieho štandardu a na ubytovacie zariadenia · Ministerstvo zdravotníctva SR, via Slov-Lex · § 3 ods. 1, 3 and 10