Air change rate

An air change rate is how many times the air in a room or building is replaced in one hour, written in h-1 (per hour).

What is the air change rate?

The air change rate is the number of times the air in a room or a building is replaced in one hour. It is written as h-1 and read as per hour. Decree 259/2008 Z. z. on the indoor environment of buildings uses the symbol n [h-1] in its tables of room parameters.

Divide the volume of air supplied or extracted per hour by the volume of the room. The result is the air change rate. It is a design and operating figure for ventilation, not a test result.

How does the air change rate differ from the n50 value?

Both figures use the unit h-1, so people confuse them. The n50 air change rate is a measured result. A blower-door test holds a 50 Pa pressure difference across the envelope and measures the airflow. It describes unintended leakage and so the airtightness of the building. Designing Buildings states the same: the n50 value is the number of air changes per hour at a pressure difference of 50 Pa.

The ventilation air change rate describes air that fans and openings move on purpose in normal use. A good n50 result does not show that this rate is enough.

The energy certificate report in Decree 364/2012 Z. z. keeps the two apart. It has one row for the measured airtightness n50 and another for the assumed average air change n. Both are in 1/h.

QuestionAir change rate (ventilation)n50 value (airtightness test)
What it describesAir that ventilation supplies or removesAir that leaks through the envelope
PressureNormal operating conditions50 Pa, set by a test fan
How you get itDesign calculation, commissioning measurementBlower-door test on the finished building

The Slovak edition of the fan pressurization method is STN EN ISO 9972, published in February 2016, with the title Stanovenie vzduchovej priepustnosti budov. Metóda pretlaku pomocou ventilátora. Only a preview of its text is free, so this article does not quote values from it.

Which values does Slovak law give?

Three provisions matter. They answer different questions.

ProvisionWhat it saysWhat it is for
Decree 364/2012 Z. z., annex 3, note qThe heating demand calculation includes a minimum average air change of 0.5 per hour. A higher value calculated to STN 73 0540-2 may replace it.A calculation input, not a hygiene limit for ventilation
Decree 259/2008 Z. z., section 3 (3)Natural ventilation suits spaces without sources of pollutants and heat. There, one to two air changes per hour are enough. A calculation sets the method and the size of the openings.Choosing natural or mechanical ventilation
Decree 259/2008 Z. z., section 3 (10)Living rooms of dwellings need fresh air per person under the valid technical standard. The decree does not print the value.Fresh air for the occupants

Annex 2 of Decree 259/2008 lists air changes for some other spaces. Table 4 gives 2 to 3 per hour for corridors and stairs. It gives 5 to 10 per hour for WCs. Both entries are for spaces with short stays, not for the rooms of a family house.

What does the European standard say about ventilation rates?

The Slovak edition of STN EN 16798-1, dated November 2019, has the title "Energy performance of buildings, Ventilation for buildings". Its module M1-6 covers the indoor environmental input parameters for design and assessment. The contents list an annex on design ventilation air flow rates for residential buildings. The copy available here shows only the contents, so this article does not quote its values.

How do you work out the air change rate for one room?

The steps are the same for any room:

  1. Measure the internal volume of the room in cubic metres.
  2. Find the airflow that the ventilation supplies or extracts in that room, in cubic metres per hour.
  3. Divide the airflow by the room volume. The result is in h-1.

Example: a fan that extracts 60 m³/h from a bathroom of 20 m³ gives 3 h-1. A room with a supply terminal and an extract fan can have two values, so state which airflow you use. A whole-house figure averages the rooms and does not show how well one room is served.

How does the type of ventilation change the air change rate?

Natural ventilation depends on wind, temperature and the openings. Decree 259/2008 section 3 (4) says that where natural ventilation is not enough, mechanical ventilation must provide the air exchange. Air must flow from rooms with a cleaner environment to rooms with a less clean one. Section 3 (16) requires negative pressure in rooms with wet operation.

A fan system gives a controlled rate. Balanced ventilation uses supply and extract fans together. Heat recovery ventilation adds a heat exchanger. Decree 364/2012, annex 3, note q, asks for heat recovery with at least 60 percent efficiency. This applies to buildings with required airtightness and a very low heat demand.

Opening windows raises the rate for a short time. The UBA, the German Environment Agency, says the air change becomes much larger when windows on opposite facades are open at the same time. Read purge ventilation for the habit. Read air infiltration for the uncontrolled flow through leaks.

What are the common mistakes?

  • A good n50 result means the building has enough fresh air. It does not. The test measures leakage, not supply.
  • The 0.5 per hour in Decree 364/2012 is a ventilation limit. It is not. It is the minimum average air change that the heating demand calculation includes.
  • The rate stays constant all day. It changes with fan settings, open windows and the occupants, so a design figure is a planning value.

How do you check the air change rate in a project?

Ask for the design airflow of each room and the room volumes from the drawings. Compare the design rate with the technical standard that the decree names and with the use of the room. Ask how the designer checks the rate after the building is finished. Commissioning measurements of the ventilation system are the usual check. A blower-door test is a second check of the envelope, but it answers a different question.

Frequently asked questions

Is the air change rate the same as the n50 value?
No. Both use the unit h-1, but they describe different things. The air change rate describes air that ventilation moves in normal use. The n50 value is a blower-door result at 50 Pa and describes leakage through the envelope. Decree 364/2012 lists them as separate inputs.
Does Slovak law set a fixed air change rate for houses?
Decree 364/2012 Z. z. sets one calculation input: a minimum average air change of 0.5 per hour, or a higher value from STN 73 0540-2. It is an input to the heating demand calculation, not a hygiene limit. Decree 259/2008 Z. z. gives no per-room value for dwellings in the sections read.
What air change rate does natural ventilation need?
Decree 259/2008 Z. z., section 3 (3), allows natural ventilation in spaces without sources of pollutants and heat, where one to two air changes per hour are enough. A calculation must set the method and the size of the openings, and doors do not count as openings.
Can a blower-door test show whether a house has enough ventilation?
No. The test measures air that leaks through the envelope when a fan holds a 50 Pa difference. It does not show how much air a ventilation system supplies in normal use. Check ventilation separately, for example by commissioning measurements.
Does opening windows count toward the air change rate?
It raises the air change for a short time. The UBA says the air change becomes much larger when windows on opposite facades are open together. It is not a steady rate, so a design cannot count on it like a fan.
Why does the air change rate matter in an airtight house?
The UBA says a tighter envelope after an energy renovation reduces the passive air exchange. Active ventilation must make up for it. Without a planned air supply, moisture can build up in the rooms.

Sources

  1. Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov, úplné znenie od 10. 3. 2020 (PDF) · Ministerstvo dopravy, výstavby a regionálneho rozvoja SR, via Slov-Lex · príloha č. 3, poznámky q) a t) and footnotes 14, 16; príloha č. 4, správa k certifikátu (riadky 54 až 56)
  2. Vyhláška MZ SR č. 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov a o minimálnych požiadavkách na byty nižšieho štandardu a na ubytovacie zariadenia · Ministerstvo zdravotníctva SR, via Slov-Lex · § 3 ods. 3, 4, 10 and 16; príloha č. 2, tabuľka č. 4
  3. STN EN 16798-1: Energy performance of buildings, Ventilation for buildings, Part 1: Indoor environmental input parameters for design and assessment of energy performance of buildings addressing indoor air quality, thermal environment, lighting and acoustics, Module M1-6 · ÚNMS SR (Normoff catalogue) · Title page and contents
  4. STN EN ISO 9972: Tepelnotechnické vlastnosti budov. Stanovenie vzduchovej priepustnosti budov. Metóda pretlaku pomocou ventilátora (ISO 9972: 2015) · ÚNMS SR (Normoff catalogue) · Title page
  5. Air pressure n50 test · Designing Buildings Ltd (Designing Buildings Wiki) · Whole page
  6. Wie lüfte ich richtig? Tipps und Tricks zur Schimmelvermeidung · Umweltbundesamt (German Environment Agency) · Stoßlüften; Lüftungsverhalten nach der Sanierung