Air infiltration
Air infiltration is the uncontrolled flow of outdoor air into a building through gaps in its envelope, and of indoor air out.
What is air infiltration?
Air infiltration is the uncontrolled flow of outdoor air into a building through gaps, cracks and joints in its envelope. Indoor air flows out through the same openings. The Building America Solution Center defines uncontrolled air flow as any non-designed movement of air into, out of or within a building. Air needs two things to move: a hole and a driving force.
The flow is not a designed ventilation system. In older US buildings the Solution Center says an amount equal to the whole house volume may enter and leave every hour. That is one air change per hour. It gives 0.25 air changes per hour or less for some newly built homes. See air change rate for the unit.
What forces drive air infiltration?
The Solution Center names three forces. Wind, heat and fans create pressure differences across the envelope.
| Force | What happens |
|---|---|
| Wind | Positive pressure on the windward side pushes air in. Negative pressure on the leeward side pulls air out. Speed and direction of the wind matter. |
| Heat (stack effect) | Warm air rises. The upper part of the building is at positive pressure and the lower part at negative pressure. The pressure grows with the temperature difference and the building height. |
| Fans | Exhaust fans and air handlers change pressures. Leaks in the envelope or ducts can make their effect drastic. |
The same source gives scale. Wind and stack effect produce between 1 and 10 Pa on residential buildings. Fans can produce as much as 60 Pa. ENERGY STAR explains the stack effect in plain words. Warm air rises like in a chimney. It sucks cold air in around windows, doors and holes into the basement.
Where does air infiltration usually enter a house?
Air leaks sit at holes in the envelope. The table lists places that the sources name.
| Place | Source |
|---|---|
| Joint between a window frame and the wall, and gap between the frame and the sash | SIEA brochure on insulating and replacing windows, page 14 |
| Windows and doors | ENERGY STAR list of common household air leaks |
| Attic hatch, wiring holes, plumbing vent, recessed light, kneewalls | ENERGY STAR list of common household air leaks |
| Furnace flue or duct chaseway | ENERGY STAR list of common household air leaks |
ENERGY STAR adds a warning for US homes. Most people blame the draughts at windows and doors, but in most homes the most significant leaks are hidden in the attic and basement. Do not assume the visible leaks are the main ones.
Why did old windows supply fresh air?
SIEA names two paths in an old window. One is the joint between the frame and the surrounding structure. The other is the gap between the frame and the sash. Outdoor air entered a house through them without a fan. People did not design this ventilation and could not control it. New windows close these paths.
What happens to indoor humidity after you fit new windows?
SIEA writes that new, tighter windows without insulation of the walls reduce the air exchange. Humidity in the interior rises, and mould appears at the thermal bridges. The brochure says that mould can appear after one or more winters, also in places where there was none before.
The moisture sources stay the same. EPA lists showers, cooking, plants and drying clothes indoors. With less air to carry the vapour out, relative humidity rises. Condensation on window glass is a visible sign. EPA explains that moisture condenses on cold surfaces such as a window, and this can encourage biological pollutants to grow.
The UBA advises 40 to 60 percent relative humidity to lower the mould growth risk. EPA advises below 60 percent, ideally 30 to 50 percent. A simple hygrometer shows the value.
How is air infiltration different from airtightness?
The two terms describe one subject from two sides. Airtightness is a property of the envelope: how few holes it has. Air infiltration is the uncontrolled flow through those holes. The Solution Center says that when you reduce the number of holes, you reduce the amount of uncontrolled air flow.
A designer sets a target for airtightness and checks it with a blower-door test. Designing Buildings describes the n50 value from that test as the number of air changes per hour at 50 Pa. The Decree 364/2012 Z. z. report form for the energy certificate has a row for the measured airtightness n50, separate from the assumed average air change. Read n50 air change rate for the value.
How do you control humidity once the air leaks are gone?
EPA gives these steps in its moisture guidance:
- Fix water leaks and seepage, because they give biological pollutants a place to grow.
- Make sure the house has a source of fresh air and can expel excess moisture.
- Use exhaust fans in bathrooms and kitchens that remove moisture to the outside, not into the attic.
- Use a dehumidifier where outdoor air is warm and humid.
EPA's mould course says ventilation helps when outside air is cold and dry. The UBA says outdoor air inlets and ventilation systems can ensure an air exchange that does not depend on the behaviour of the occupants. For gap positions in a window, read window micro-ventilation. For short airing by hand, read purge ventilation.
Is air infiltration always a problem?
It is an uncontrolled path, so it works on its own schedule. The Solution Center says a higher infiltration rate means a lower overall efficiency for the building. ENERGY STAR says the air that leaks out carries heat that you paid for.
A house still needs air exchange. The goal is a planned one. Decree 364/2012 Z. z., annex 3, note q, says the heating demand calculation includes a minimum average air change of 0.5 per hour. It asks for heat recovery with at least 60 percent efficiency in buildings with required airtightness and a very low heat demand. See heat recovery ventilation.
A common misconception is that sealing alone fixes damp. ENERGY STAR lists better humidity control among the benefits of sealing and insulating. The Solution Center and EPA also tie humidity to ventilation and to the moisture sources, so the balance still needs a plan.
What does this mean for a house renovation in Slovakia?
SIEA advises replacing windows just before the insulation of the envelope. It advises keeping the required ventilation rate. If you replace windows first, check the walls for moisture risk and plan the air supply with a designer. The UBA says to adapt airing habits after any renovation that makes the envelope tighter.
Frequently asked questions
- What is air infiltration in simple terms?
- Air infiltration is air that moves into, out of or within a building without a design for it. The Building America Solution Center calls this uncontrolled air flow. Wind, rising warm air and fans cause it, and it flows through holes in the envelope.
- Does air infiltration cause mould?
- Infiltration does not cause mould, but removing it without a replacement can. SIEA warns that new, tighter windows reduce the air exchange and raise indoor humidity. Mould can then appear at thermal bridges after one or more winters. The brochure adds that the required ventilation rate must still be kept.
- Can I seal the windows and skip ventilation?
- No. The UBA says an energy renovation makes the envelope tighter and reduces the passive air exchange. More active ventilation must replace it. EPA adds that a tight house holds more moisture, so a kitchen or bath fan or a brief window opening may be needed.
- What humidity level should a home keep?
- The UBA advises 40 to 60 percent relative humidity to lower the mould risk. The US EPA advises below 60 percent, ideally 30 to 50 percent. EPA says above 60 percent condensation is likely, and condensation can lead to mould growth.
- Is a draught the same as air infiltration?
- No. A draught is how a person feels moving cooler air. Infiltration is any non-designed air movement into, out of or within the building. Leaks can be hidden, so a house can have few noticeable draughts and still have infiltration.
- Is air infiltration the same as the n50 value?
- No. The n50 value comes from a blower-door test that holds 50 Pa across the envelope. The Building America Solution Center says wind and stack effect produce only 1 to 10 Pa on residential buildings. So the test pressure is far above the natural one.
Sources
- Building Science Introduction: Air Flow · Building America Solution Center (Pacific Northwest National Laboratory for US DOE; content from ENERGY STAR) · Controlled versus uncontrolled air flow; Pressure; Air-change rates
- Zatepľovanie a výmena okien v rodinných domoch (brochure, 31 May 2018) · Slovenská inovačná a energetická agentúra (SIEA) · Nestačí len vymeniť okná? (p. 4); Možná infiltrácia vzduchu a úniky tepla cez okno (p. 14)
- Wie lüfte ich richtig? Tipps und Tricks zur Schimmelvermeidung · Umweltbundesamt (German Environment Agency) · Lüftungsverhalten nach der Sanierung; Luftfeuchte; Außenluftdurchlässe
- Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov, úplné znenie od 10. 3. 2020 (PDF) · Ministerstvo dopravy, výstavby a regionálneho rozvoja SR, via Slov-Lex · príloha č. 3, poznámka q); príloha č. 4, správa k certifikátu (riadky 54 až 56)
- Air pressure n50 test · Designing Buildings Ltd (Designing Buildings Wiki) · Whole page
- Mold Course, Chapter 9: Moisture control and humidity · US Environmental Protection Agency (EPA) · Chapter 9
- What are the main ways to control moisture in your home? · US Environmental Protection Agency (EPA) · Main ways to control moisture
- Locating air leaks (DIY guide) · ENERGY STAR (US EPA and US DOE) · Common household air leaks
- Why seal and insulate · ENERGY STAR (US EPA and US DOE) · Increase comfort