Wall air inlet
A wall air inlet is a vent set through an external wall that lets background outdoor air into a room without an open window.
What is a wall air inlet?
A wall air inlet is a vent set through an external wall. It lets outdoor air into a room without an open window. The maker Aereco sells a humidity-sensitive model that fits a wall opening of 100 mm or 125 mm. Core drilling makes the opening. Aereco names the bedroom and the living room as the rooms for that model. It calls the model an alternative to window air inlets.
The inlet usually works together with an extract fan in the kitchen or the bathroom. Air enters in one room and leaves through another room.
How does a wall air inlet work with extract ventilation?
In an exhaust-only ventilation system, the fan extracts stale and humid air from kitchens and bathrooms. The Passive House Institute explains that the fan causes a small under-pressure. Fresh air then flows through inlet air valves into the living spaces. The inlet is the place where the house takes its fresh air, so the choice of inlet matters.
Decree 259/2008 Z. z. sets a related rule for mechanical ventilation. Under § 3 ods. 4, air must flow from rooms with a cleaner environment to rooms with a less clean one. The table shows how the sources describe the common ways to supply air.
| Route | What the source says | Source |
|---|---|---|
| Trickle vent in a window or wall | Allows a steady but controllable ventilation flow | Department for Communities, Northern Ireland |
| Wall air inlet | An alternative to window air inlets, set in the wall | Aereco EHT² page |
| Window in a night latch position | Not adequate for background ventilation | Approved Document F, note to 1.52 |
| Supply air with heat recovery | The heat recovery warms the supply air, so it is no longer cold | Passive House Institute |
Which features does a product sheet state?
The Aereco EHT² page shows what a good data sheet gives. Read each figure under the test condition that the maker names. Do not read it as a general rule.
| Item | What the product page states | Why it matters |
|---|---|---|
| Airflow at 10 Pa | 11 to 40 m³/h for the EHT² 11-40 model | Compare it with the extract fan and the room, at the pressure the house will have |
| Opening area | Maximum 3,800 mm² | Shows the size of the opening that the inlet can give |
| Sound insulation | 40, 45 or 52 dB, depending on the duct, foam and canopy, for recommended slots | Matters most for a bedroom wall on a street |
| Modes | Closed, wide open and humidity-sensitive. The closed mode protects against cold and strong wind | You choose the mode to suit the weather and the room |
| Filter | Two types of removable insect filter | Keeps out insects. The page lists no dust or pollen filter |
| Canopy | Rain canopy and anti-insect canopy options | Protects the opening from rain and pests |
| Maintenance | No adjustment, simple yearly dusting | Plan a yearly check |
Look for a flow rating at a stated pressure and a mode that closes or follows humidity. Look for an acoustic option if the room faces a noisy street. A closed inlet admits no air, so close it on purpose and not by habit.
How is a wall air inlet different from a trickle vent?
A trickle vent sits in the window. A wall air inlet sits in the wall. The Northern Ireland technical note describes trickle ventilation through window and wall vents as a steady but controllable flow. Aereco presents its wall inlet as an answer where the windows lack space for a vent.
The wall route has a planning side. The same technical note says new vents may change the external appearance of a building. It adds that they may need listed building consent. Ask the heritage authority before you drill into a protected facade.
Where should you place a wall air inlet?
Approved Document F gives guidance for dwellings in England. It says a fan and a background ventilator in the same room should be at least 500 mm apart. It also says an exposed facade close to sustained loud noise, such as a main road, should get a noise-attenuating ventilator. It says the ventilator areas on each exposed facade should be similar, to allow cross-ventilation. These are English guidance, not Slovak rules.
The Passive House Institute adds a comfort point. Exhaust-fan systems supply cold air to the rooms, so it does not suit a passive house. For low-energy houses it shows a radiator under the inlet as an acceptable solution. Aereco says its inlet has three possible openings for incoming air. You can choose the assembly to suit the room, so the incoming air does not bother the occupants.
What goes wrong with wall air inlets?
The Northern Ireland note says that a vent painted over can lead to a build-up of condensation inside the room. The note describes traditional buildings, but a blocked inlet cannot admit air in any building. Do not paint over the grille.
A second problem is a dirty or blocked screen. Aereco says its inlet needs a simple yearly dusting, and its filters are easy to reach. A third problem is noise. The sound value that a maker quotes holds only for the recommended slot conditions and the listed accessories.
Does Slovak law set the size of a wall air inlet?
We found no provision on the size or number of inlets in Decree 364/2012 Z. z. or in Decree 259/2008 Z. z. Decree 259/2008, in the version effective from 4 September 2025, deals with ventilation in § 3. Under ods. 3, a calculation sets the method, the position and the size of the supply and exhaust openings in natural ventilation. Doors do not count as such openings. Under ods. 10, living rooms of flats and accommodation need fresh air per present person, according to the current technical standard.
Decree 364/2012 is about energy performance. In the consolidated version of 10 March 2020, Annex 1 lists an assessment of the minimum average air change in a room. The assessment includes heat recovery. Annex 3, note q, says the heat-demand calculation should include an average air change of at least 0.5 per hour. It may use a higher value under STN 73 0540-2. The same note requires heat recovery of at least 60 % efficiency in buildings with required airtightness and a very low heat demand.
A wall inlet therefore sits inside the ventilation calculation. The calculation sizes the airflow, and the inlet delivers it.
How do you choose and place a wall air inlet?
- Take the airflow of the extract fan from the design. Check that the inlet range covers that flow at the pressure the house will have.
- Pick a humidity-sensitive or a manual model to suit the room.
- Check the wall thickness against the sleeve length and the core-hole size before you order.
- Place the inlet away from the extract fan, and keep the cold air off the occupants.
- Choose an acoustic duct and a canopy if the room faces a street or a neighbouring unit.
- Plan a yearly check so that the screen is clean and the opening is open.
Frequently asked questions
- Does a wall air inlet need electricity?
- In an exhaust-only system the extract fan creates a small under-pressure, and fresh air flows in through the inlet valves. The Aereco EHT² page does not describe a power connection for the inlet, so read the datasheet of each model.
- Can a wall air inlet replace opening a window?
- An inlet gives background air, not a quick flush. The Aereco EHT² 11-40 model has an airflow of 11 to 40 m³/h at 10 Pa. A quick, full airing of a room is another job, and the entry on purge ventilation covers it.
- Where should a wall air inlet go?
- Approved Document F says a fan and a background ventilator in the same room should be at least 500 mm apart. The Passive House Institute says cold supply air through inlet valves is not suitable for a passive house. It shows a radiator under the inlet as a fix for low-energy houses.
- Does a wall air inlet filter dust and pollen?
- The Aereco EHT² page lists removable insect filters and an anti-insect grille. It does not list a dust or pollen filter. For any other model, read the filter data in the datasheet.
- Why is my wall air inlet noisy?
- The Aereco page gives its sound values only for recommended slot conditions. It lists 40, 45 or 52 dB, depending on the duct, the acoustic foam and the canopy. An inlet without those parts may not reach the quoted value.
- Does Slovak law set the size of a wall air inlet?
- We found no rule on inlet size or number in Decree 364/2012 or Decree 259/2008. Decree 259/2008 says a calculation sets the position and size of air openings in natural ventilation. The designer makes that calculation.
Sources
- Technical note: ventilation · Department for Communities, Northern Ireland · Ventilation, paragraphs on modern and traditional buildings
- EHT² air inlet, product page · Aereco (manufacturer product page) · Description, characteristics and acoustics tables
- Ventilation in Passive House · Passive House Institute (passivehouse.com) · Exhaust fan ventilation; heat recovery
- Approved Document F, Volume 1: Dwellings (2026 edition, for use in England) · UK Government (Building Regulations 2010) · Paragraphs 1.52 to 1.55 and note to 1.52
- Vyhláška MZ SR 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov · Ministerstvo zdravotníctva SR, via Slov-Lex · § 3 ods. 3, 4 a 10
- Vyhláška 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov, úplné znenie od 10. 3. 2020 · Ministerstvo dopravy a výstavby SR, via Slov-Lex · Príloha č. 1 časť 1 písm. e) bod 3; príloha č. 3 poznámka q) a poznámka 14)