Slip resistance rating
A slip resistance rating is a tested class on a tile data sheet, such as R10 for shod feet or B for wet bare feet.
What is a slip resistance rating?
A slip resistance rating is a class that describes how well a floor covering resists slipping. A standard test sets it, not the eye. In Slovak the term is protišmyková trieda dlažby. The classes on tile data sheets come from German practice. They are the R classes R9 to R13 for shod feet and the groups A, B and C for wet barefoot areas. The rating is a result for one tested product. It belongs on the manufacturer's technical data sheet.
The word rating is not a single number. The classes come in families, and each family is measured with its own test. Read the class together with the area it is meant for.
How are the R9 to R13 classes ordered?
The R classes run from R9 to R13 in order of demand. The IFA test laboratory of the German statutory accident insurance states that R9 gives the lowest slip resistance and R13 the highest. It ties the classes to the German workplace rule ASR A1.5/1,2 and to Annex B of DIN EN 16165 with national annex NB.2. A tile manufacturer's data sheet says the same: R9 is subject to the lowest requirements and R13 to the most stringent. The class is a property of the tested surface, so a rectified tile is rated like any other tile with the same surface. This page gives no angle values for the R classes. Take them from the standard or from the data sheet of the product.
For a designer, the practical question is which class a surface needs, not which class sounds best. Architects usually start from the use of the room. They ask whether the floor is likely to be wet and whether people walk on it in shoes or barefoot.
What do the A, B and C barefoot classes mean?
The groups A, B and C apply to wet floors that people walk on without shoes, such as changing rooms, shower rooms and pool surrounds. DGUV Information 207-006, the German accident insurance publication for wet barefoot areas, says group A is the lowest and C the highest. Its June 2015 edition tested on an inclined plane under DIN 51097. It set minimum inclination angles of 12° for A, 18° for B and 24° for C. It placed shower rooms and pool surrounds in B, and ladders and stairs leading into water in C. The edition dated December 2025 names DIN EN 16165 as the test standard. This page did not read its table, so check the angles in the current edition before you quote them.
DIN 51097 is listed in the DIN catalogue with edition date November 1992 and the status withdrawn. A barefoot class on a data sheet should name the test it used. If the sheet quotes only a letter and no standard, the letter cannot be compared with a value from another manufacturer.
Which standard defines the ratings today?
The IFA test laboratory says that DIN EN 16165 appeared in December 2021. It replaces DIN 51097, DIN 51130 and DIN 51131, and their methods now sit in annexes. The table shows the mapping the IFA page gives.
| Older German standard | Position in DIN EN 16165 | What it covers |
|---|---|---|
| DIN 51130 | Annex B with national annex NB.2 | Shod feet, classes R9 to R13 |
| DIN 51097 | Annex A with national annex NB.1 | Wet barefoot areas, groups A, B and C |
| DIN 51131 | Annex D | Sliding friction coefficient |
If an older data sheet quotes an old number, match it to the row above. Then ask the manufacturer whether the product was tested again under the current annex.
How is a V rating different from an R class?
Manufacturers also quote V ratings. One tile maker's data sheet says they run from V0, the lowest, to V10, the highest. The sheet says they matter where water is likely, such as swimming pools, shower areas, reception areas and outdoor areas. A tile can carry more than one kind of rating.
| Family | Scale named in the source | Area named in the source |
|---|---|---|
| R classes | R9 to R13, ordered by demand | Shod feet, workplaces and publicly accessible areas |
| Barefoot groups | A, B and C | Wet barefoot areas |
| V ratings | V0 to V10 (one manufacturer sheet) | Areas where water is likely |
The table is a reading aid. It recommends nothing for any room. A V rating does not replace an R class. An R class does not say how a barefoot user will feel on a wet shower floor.
Which rating does a home bathroom, stair or terrace need?
The IFA page covers workplaces and publicly accessible areas. DGUV Information 207-006 covers wet barefoot areas such as bathrooms, hospitals and sports and workplace facilities. Neither names a class for a private house. These are German documents, and a Slovak project may use them as a reference only. For a house, the class is therefore design advice. Architects usually weigh three things: whether the floor is wet, whether people walk on it barefoot, and how steep or exposed the surface is. As a rule of thumb, ask for a more demanding class where water lies on the floor than on a dry stair. An open shower is an example.
The fall of the floor matters as much as the tile. Shower surfaces are usually sloped to a drain, as described in shower floor fall. Outdoor surfaces, such as a terrace, also depend on how water leaves the surface, so read the rating together with the drainage design.
How should you check a declared rating?
Ask for the manufacturer's technical data sheet and check three things: the standard named, the annex used, and the date of the test. A rating quoted without a standard cannot be compared with another product. A rating quoted with an old DIN number should be matched to the current annex before it goes into a specification. One tile data sheet read for this page, Mandarin Stone's Cemento range, lists R10 for the matt finish under DIN 51130. It declares no value for the polished finish, so one sheet can leave a class open.
The rating describes the tested tile, not the finished floor. The surface after laying, grouting, cleaning and drainage can behave differently from the sample. For the bed of the tile, see tile adhesive, and for the outlet, see floor drain.
How should the rating appear in a design specification?
Write the class, the standard and the annex in the finishes schedule, next to the room it applies to. Keep the reason in the specification as well, because a later change of tile can alter the class without anyone noticing. If the client asks for a glossy tile in a wet room, the specification should show the rating that was checked, not only the finish.
Frequently asked questions
- What is a slip resistance rating?
- It is a class assigned to a floor covering by a standard test, so that the surface can be compared with others. The class is a result for one tested product, and it should appear on the manufacturer's technical data sheet. It says nothing about how the finished floor will behave once it is laid, cleaned and drained.
- What does R10 mean on a tile?
- R10 is one of the R9 to R13 classes for people wearing shoes. R9 has the lowest requirements and R13 the most stringent, so R10 sits one step above R9. The sources read do not map R10 to a particular room, so the choice depends on the use.
- What do the A, B and C classes mean for barefoot floors?
- A, B and C are groups for wet floors that people walk on without shoes. DGUV Information 207-006 says A is the lowest group and C the highest. A data sheet that quotes one of these groups should also name the test and the annex used.
- Is DIN 51130 still the standard for tile slip ratings?
- The IFA test laboratory states that DIN 51130 is replaced by Annex B of DIN EN 16165, with the national annex NB.2. Manufacturers still quote DIN 51130 in older literature, so you may see both names. The annex is the part to check on a data sheet.
- Is a slip resistance rating required by law for a house?
- The German sources read for this page cover workplaces, publicly accessible areas and wet barefoot areas such as sports and workplace facilities. They name no class for a private house, so for a house the class is design advice. Check any project-specific duty with the designer.
- Does a V rating replace an R class?
- No. V ratings are a separate family. One manufacturer's data sheet quotes them from V0 to V10 for areas where water is likely, such as swimming pools, shower areas and outdoor areas. A data sheet may list an R class, a V rating, both, or neither, so read each entry against the area it is meant for.
Sources
- IFA test laboratory: Slip resistance of floor coverings (Prüfung von Bodenbelägen) · IFA, test laboratory of the German statutory accident insurance (DGUV) · Replacement of DIN 51097, DIN 51130 and DIN 51131 by DIN EN 16165 and its annexes; publication December 2021; groups R9 to R13 and A, B, C
- DIN 51097: Testing of floor coverings; determination of the anti-slip properties; wet-loaded barefoot areas; walking method; ramp test · DIN Media (DIN Standards catalogue) · Standard record, edition 1992-11, status withdrawn
- DGUV Information 207-006: Bodenbeläge für nassbelastete Barfußbereiche (June 2015 edition, BG BAU copy; edition December 2025 listed on publikationen.dguv.de) · Deutsche Gesetzliche Unfallversicherung (DGUV) · Section 2 and Section 3.1 table (groups A, B, C, minimum inclination angles)
- Slip resistance shod (DIN 51130) · Grestec Tiles (manufacturer technical information) · Shod-foot classes R9 to R13 and V-rating overview
- Cemento Range Porcelain, Technical features, compliant with EN 14411 (ISO 13006) annex G group BIa UGL (manufacturer data sheet, undated; PDF metadata dated 2023-10-02) · Mandarin Stone (manufacturer) · Technical features table