Porcelain stoneware

Porcelain stoneware is a dense ceramic tile with very low water absorption, usually sold in EN 14411 group BIa (0.5 % or less).

What is porcelain stoneware?

Porcelain stoneware, in Slovak gresová dlažba, is a ceramic floor and wall tile with a dense body and very low water absorption. The name is a trade description, and the classification that matters is the EN 14411 group. The reader should check the declared values on the product data sheet rather than trust the label on the box.

EN 14411 itself does not use the name porcelain stoneware. It sorts tiles by forming process and by water absorption. Dry-pressed tiles with an absorption of 0.5 % or less are group BIa. Extruded tiles with the same absorption limit are group AIa, covered by Annex M. A tile sold as porcelain stoneware should state which group it meets, so the declared group matters more than the name.

How does EN 14411 classify porcelain stoneware?

EN 14411 sorts ceramic tiles by water absorption, written as Eb, and by the forming process. Dry-pressed tiles with low absorption sit in Annex G, Group BIa, which covers tiles with Eb of 0.5 % or less. Annex H covers Group BIb, above 0.5 % and up to 3 %. Higher absorption groups for dry-pressed tiles follow in Annexes J, K and L. The Slovak adoption, STN EN 14411: 2017, keeps the same annex structure. Table 1 lists the groups for dry-pressed tiles.

EN 14411 groupWater absorption (Eb)Annex
BIa, dry-pressed, low absorptionEb of 0.5 % or lessAnnex G
BIb0.5 % < Eb of 3 % or lessAnnex H
BIIa3 % < Eb of 6 % or lessAnnex J
BIIb6 % < Eb of 10 % or lessAnnex K
BIIIEb above 10 %Annex L

The data sheet read for this article, from Mandarin Stone's Cemento range, declares its porcelain range in group BIa. That is the group for dry-pressed tiles with Eb of 0.5 % or less. The group depends on the measured absorption value and the forming process, so a sheet that declares it should show the test result behind it. The same sheet lists a non-slip class of R10 for the matt finish under DIN 51130. See slip resistance rating for how to read such a class.

How are water absorption and frost resistance tested?

The test methods come from the ISO 10545 series. Water absorption is measured under ISO 10545-3. Frost resistance is measured under EN ISO 10545-12, which the standard lists among its normative references. EN 14411 sets the requirement levels, so a claim of group BIa should be backed by a test result, not only by the group name.

Table 2 shows the values declared on one porcelain range read for this article. These are one manufacturer's figures for one product, not a property of all porcelain stoneware.

PropertyTest methodValue declared on one product sheet
Water absorptionISO 10545-30.5 % or less, stated as conforming
Thermal shockISO 10545-9Resistant
Frost resistanceISO 10545-12Resistant, against a listed requirement

Where does the standard stop applying?

EN 14411 covers tiles made by extrusion or dry pressing, for internal and external floors including stairs, and for walls. It does not cover mesh-backed products, decorative trims such as edges and skirting, or tiles for ceiling finishes and external road finishes. It also excludes dry-pressed unglazed tiles with water absorption above 10 %.

A dry-pressed unglazed tile with absorption above 10 % is therefore outside the standard. The scope is the same on the DIN catalogue page for EN 14411 (edition 2016-12, current).

How is porcelain stoneware different from large-format tile?

The two terms describe different things. Porcelain stoneware describes the body and its absorption. Large-format tile describes the size, and the absorption groups of EN 14411 do not depend on size. A large tile can be porcelain stoneware, and a porcelain stoneware tile can be small. Trade names often pair the two terms. Check both the absorption group and the dimensions on the data sheet.

Tiles with rectified edges are another common pairing. See rectified tile for what the edge finish changes in the installation. Installation of porcelain stoneware is a separate question from the tile's classification, and it depends on the substrate and the adhesive. See tile adhesive for the adhesive side.

Where is porcelain stoneware used in a Slovak house?

As advice, a low-absorption tile is a reasonable choice for a wet room, because low absorption limits how much water the body takes up. This page found no source ranking tile types by use in houses. A common rule of thumb in practice is to check the drainage and falls before the tile is laid. See wet-room shower for how the floor falls and the waterproofing are arranged in a wet room.

What should an architect ask the supplier for?

Architects usually write the standard, the absorption group and the test results into the specification, not only the trade name. As advice, it is sensible to ask for the declared absorption value, the frost test result and the test report behind them. Where a sheet says a test is available on request, ask for the report before the order is placed.

Specifying by standard also protects the client when the same tile is quoted under different names. Two products sold as porcelain stoneware can have different declared values, so the comparison should be made on the data sheets, not on the names.

Frequently asked questions

Is porcelain stoneware the same as porcelain tile?
The two names are used loosely in the trade. EN 14411 classifies tiles by water absorption group and forming process. Check the declared absorption group on the product data sheet before you rely on the name.
What water absorption value puts a tile in group BIa?
Group BIa is dry-pressed tile with water absorption (Eb) of 0.5 % or less, set out in Annex G of EN 14411. Tiles above 0.5 % and up to 3 % fall in group BIb, which is covered by Annex H.
Which Slovak standard applies to ceramic tiles?
STN EN 14411: 2017 (72 5101) is the Slovak adoption of EN 14411:2016. It replaced the 2013 Slovak edition, which was cancelled from 30 April 2018. The standard covers tiles for internal and external floors and walls.
How is frost resistance tested for porcelain stoneware?
Frost resistance is tested under EN ISO 10545-12, which EN 14411 lists among its normative references. A product data sheet should state the result for that test. Ask the supplier for the test report if the sheet only says the test is available.
Can porcelain stoneware be used outdoors?
EN 14411 covers ceramic tiles for internal and external floorings, including stairs, and for walls. It does not cover tiles used in ceiling finishes or on external road finishes. The suitability of a specific product for outdoor use is still a question for its declared values.

Sources

  1. STN EN 14411: 2017, Keramické obkladové prvky. Definície, klasifikácia, vlastnosti, hodnotenie zhody a označovanie (72 5101); English title: Ceramic tiles - Definition, classification, characteristics, assessment and verification of constancy of performance and marking · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), via normy.normoff.gov.sk · Cover and cancellation notice; normative references; clause 1 Scope; contents (Annexes G, H, J, K, L, M)
  2. DIN EN 14411: Ceramic tiles - Definition, classification, characteristics, assessment and verification of constancy of performance and marking (EN 14411:2016, German version) · DIN Deutsches Institut für Normung e.V., standards catalogue page · Catalogue entry: status, scope summary
  3. Cemento Range Porcelain, Technical features, compliant with EN 14411 (ISO 13006) annex G group BIa UGL (manufacturer data sheet, undated; PDF metadata dated 2023-10-02) · Mandarin Stone (manufacturer) · Technical features table