Rectified tile
A rectified tile has its edges mechanically cut to one size, so it can be laid with a narrow joint. The manufacturer's minimum joint still applies.
What is a rectified tile?
A rectified tile, in Slovak rektifikovaná dlažba, is a tile whose edges are mechanically finished. Tubadzin, a tile manufacturer, describes rectification as a special mechanical treatment that cuts the edges. The tiles then come close to one fixed size, and the corners sit at right angles. The Ceramic Tile Foundation, a US industry body, describes rectified tiles in the same way: taken from the production line and mechanically finished. The term describes the edge finish. It says nothing about the body of the tile, so a rectified tile can be porcelain stoneware or another type. See porcelain stoneware for the body classification.
How does rectification change the grout joint?
The tiles are close to one size and straight. The installer can therefore set them with a narrow joint, not a wide one that hides size differences. Architects often choose rectified tile where a clean, thin grout line is wanted. That is design advice, not a rule. The narrow joint is still a joint, and its width comes from the manufacturer or the installation standard, not from the look the installer wants.
Can rectified tiles be laid without a joint?
No. Tubadzin states that laying tiles without joints goes against the art of tiling. Without joints the tiles form a uniform surface that is susceptible to cracking from tile deformation and from temperature differences. The joint is therefore more than a visual line. It gives each tile room to move.
What minimum grout joint do the sources give?
The two sources read for this term answer different questions. Tubadzin gives a manufacturer's recommendation. The Ceramic Tile Foundation quotes ANSI A108.02, which is a United States installation standard. It is not a Slovak or a European rule. This page uses it only to show how one national standard ties the joint to the tile. Neither source sets a Slovak legal joint width. No European standard on rectified tile joints was read for this page.
| Source | Rule | Value |
|---|---|---|
| Tubadzin (manufacturer) | Minimum recommended grout for rectified tiles | 2 mm |
| ANSI A108.02 (US), rectified tile with any side over 15 in (about 38 cm) | Average minimum grout joint | 1/8 in (about 3.2 mm) |
| ANSI A108.02 (US), calibrated tile with any side over 15 in | Average minimum grout joint | 3/16 in (about 4.8 mm) |
| ANSI A108.02 (US), any tile | Joint is never less than | 1/16 in (about 1.6 mm) |
The values differ. Do not pick the smallest because it looks cleaner. The 2 mm figure is guidance from one manufacturer for its rectified range. The product data sheet of the tile actually bought is the first reference.
Why does tile variation change the joint width?
ANSI A108.02, as quoted by the Ceramic Tile Foundation, ties the joint to the tile rather than to a fixed number. The actual grout joint should be at least three times the actual variation in the facial dimensions of the tile supplied. Its example is a tile with a total variation of 1/16 in, which needs a joint of at least 3/16 in. As a practical consequence, the joint on a sample can look right while a delivered batch needs a wider joint. Measuring the delivered batch before the layout is fixed is installer practice, not a figure from a source.
How is a rectified tile different from a calibrated tile?
The Ceramic Tile Foundation describes calibrated tiles as sorted after production to meet a size range. It describes rectified tiles as taken from the line and mechanically finished. In the ANSI rule, calibrated tile is the non-rectified case, and it asks for a wider average joint when a side is over 15 in.
| Feature | Rectified tile | Calibrated (non-rectified) tile |
|---|---|---|
| How the size is reached | Edges mechanically finished | Sorted into a size range after production |
| Average minimum joint, side over 15 in (ANSI A108.02, US) | 1/8 in (about 3.2 mm) | 3/16 in (about 4.8 mm) |
A rectified tile is not a shortcut to a tight installation. The narrow look comes from the finished edges, and the joint still needs the manufacturer's minimum.
Does rectification change the tile class in EN 14411?
No class in EN 14411 depends on the edge finish. The Slovak edition, STN EN 14411: 2017, sorts tiles by forming process and water absorption. Its text, as read for this page, has no rectified group. A rectified tile therefore still needs its absorption group and other declared values on the data sheet.
What should an architect specify for rectified tile?
Architects often write the manufacturer's minimum joint into the finishes schedule next to the tile size. The installer then does not choose the joint on site. This is design advice, not a rule. The schedule should also name the substrate and the adhesive, because a narrow joint on an uneven base shows every flaw. For large sizes, read large-format tile first, and check the bed coverage in the tile adhesive data sheet. A tile levelling system can hold the edges of neighbouring tiles at one height. For floors in wet or outdoor areas, check the slip resistance rating of the tile as well.
Frequently asked questions
- What is a rectified tile?
- A rectified tile is a tile whose edges are mechanically finished. Tubadzin describes the treatment as cutting the edges so the tiles come close to one fixed size with right-angled corners. This lets the installer lay the tile with a narrow joint.
- Can a rectified tile be laid with no grout joint?
- No. Tubadzin says laying tiles without joints goes against the art of tiling. Without joints the tiles form one uniform surface that is susceptible to cracking from deformation and temperature differences. Keep a joint of the width the manufacturer gives.
- What is the smallest grout joint for a rectified tile?
- Tubadzin recommends at least 2 mm for its rectified tiles. The US standard ANSI A108.02 sets an average minimum of 1/8 in (about 3.2 mm) for rectified tiles with a side over 15 in. The Ceramic Tile Foundation quotes it. Check the product data sheet before you set the layout.
- Does tile size variation need a wider joint?
- The US standard ANSI A108.02 asks for a joint at least three times the actual variation in the facial dimensions of the tile supplied. The Ceramic Tile Foundation quotes it. Measure the delivered batch before you fix the joint width.
- Is a rectified tile the same as a calibrated tile?
- No. The Ceramic Tile Foundation describes calibrated tiles as sorted after production into a size range, and rectified tiles as mechanically finished. The US rule ANSI A108.02 covers a side over 15 in. It asks for an average joint of 3/16 in (about 4.8 mm) for calibrated tile and 1/8 in (about 3.2 mm) for rectified tile.
Sources
- Can rectified tiles be installed without joints? · Tubadzin (tile manufacturer), technical advice page · Main text
- What are rectified tiles? · Tubadzin (tile manufacturer), technical advice page · Main text
- Want credit card grout joints? Check tile industry standards · Ceramic Tile Foundation (US), quoting ANSI A108.02 sections 4.3.8 and 4.3.8.1 and ANSI A137.1 definitions · ANSI A108.02 4.3.8 and 4.3.8.1 as quoted; tile definitions
- STN EN 14411: 2017, Keramické obkladové prvky. Definície, klasifikácia, vlastnosti, hodnotenie zhody a označovanie (72 5101); English title: Ceramic tiles - Definition, classification, characteristics, assessment and verification of constancy of performance and marking · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), via normy.normoff.gov.sk · Contents and clause 1 Scope