A tile levelling system uses clips and wedges, or posts and caps, to hold neighbouring tile edges level while the adhesive cures and cut lippage.

What is a tile levelling system?

A tile levelling system, called nivelačný systém na dlažbu in Slovak, is a set of plastic clips and wedges, or posts and caps, that hold the faces of neighbouring tiles in one plane while the adhesive cures. It is a tool used on site. It does not stay in the finished floor or wall. Its purpose is to reduce lippage, the small step where one tile edge stands above the next.

The system controls two things at once: the width of the grout joint and the height of each tile. Manufacturers sell the clip version and the post version as separate product lines, so the buyer should confirm which one a supplier means before ordering.

How does a clip and wedge system work?

The installer sets the tiles in adhesive first. The clips go into the gaps between adjacent tiles, and the wedges are pushed into the clips and tightened with pliers. Rubi, a tile tool maker, says the wedges “do not lift tiles from the adhesive bed, or create voids”. Its guide also suggests placing clips approximately 6 to 8 in. apart along the edges of the tiles. That is about 150 to 200 mm. The guide gives inches only, so the metric values are converted here. Rubi frames these as its own instructions, so follow the sheet that comes with the product you buy.

StepWhat the Rubi guide says
Position the clipsInsert them into the gaps between adjacent tiles once the tiles are placed
Adjust the heightUse pliers to apply pressure to the wedges and adjust tile height as needed
Let the adhesive cureKeep the parts in place until the adhesive cures, typically 24–48 hours
Remove the partsPull them out in the direction of the grout joint to reduce the chance of chipping tile edges

Which product sizes does the system suit?

Product ranges differ, so check the data sheet. QEP, a flooring tools maker, lists its clip-and-wedge LASH for tile between 1/4 in. and 7/16 in. thick (6.4 to 11.1 mm), with grout widths of 1/16 in. or 1/8 in. (1.6 or 3.2 mm). Its post-and-cap LASH 360 is listed for large-format porcelain, ceramic and natural stone up to 3/4 in. thick (19 mm), with posts that give 1/32, 1/16, 1/8 and 3/16 in. grout widths (0.8, 1.6, 3.2 and 4.8 mm). The metric values are converted here. These are manufacturer values from QEP's Canadian pages. They are not a standard.

FeatureClip and wedge (QEP LASH)Post and cap (QEP LASH 360)
Tile thickness listed1/4 in. to 7/16 in. (6.4 to 11.1 mm)Up to 3/4 in. (19 mm)
Grout width1/16 in. or 1/8 in. (1.6 or 3.2 mm)1/32, 1/16, 1/8 and 3/16 in. (0.8 to 4.8 mm)

QEP describes the post-and-cap version as suited to large-format tile. Design advice, not a sourced rule: a small height difference shows more in a narrow joint, so thin joints between large-format tiles are where a levelling system is worth considering. The rectified-tile entry explains the edge work that makes this possible.

How is a levelling system different from the adhesive?

The tile adhesive holds the tile to the base. The levelling system does not bond anything. It only holds the faces of neighbouring tiles at the same height while the adhesive sets. A common mistake is to treat the clips as a repair for a poor bed. If the adhesive is thin in places, or the tile does not sit fully on it, the clips will not put that right.

The two are also used for different reasons. The adhesive must be chosen for the tile, the base and the room. The levelling parts are chosen for the tile thickness and the joint width the designer wants. Name both in the same tiling section of the specification, so that the adhesive class and the levelling parts match the tile.

Does a levelling system correct an uneven base?

No. The system aligns the tile faces but does not flatten the base beneath them. A wavy screed or substrate will still show in the finished floor, and the clips may hide it only for a while. In practice the base is checked with a straightedge across its full span before tiling starts, and high or low spots are corrected first. This is advice based on how the system works, not a rule taken from a standard.

Which tile standard defines the tile itself?

The tile is defined by ISO 13006, titled Ceramic tiles, definitions, classification, characteristics and marking. The current edition is ISO 13006:2018, edition 3, published in September 2018. The ISO catalogue says it was last reviewed and confirmed in 2024 and lists a revision as under development. The standard covers first-quality tiles made by extrusion or dry pressing. It excludes trim, accessories and mosaic pieces that fit inside a square with sides under 7 cm.

Design advice: the clips work on the tile edge, so a tile with uneven edges is hard to level with a clip alone. For Slovakia, the European counterpart named in STN EN 12004-1 is EN 14411, adopted as STN EN 14411 (72 5101), titled Keramické obkladové prvky. Check the national reference on the ÚNMS catalogue before you write a standard into a specification.

Where do architects usually specify a levelling system?

Design advice: consider a levelling system for large tiles in living rooms, kitchens and hallways, where side light shows lippage across the floor. Consider it also in a wet room, where a surface that sits too high or too low affects the water path to the drain. Decide this with the installer before tiling starts, not after the tiles are on the floor.

For a bathroom floor, plan the fall and the drain first, then choose the tile and the levelling method. The levelling system does not replace the fall in the screed, and it should not be used to hide a fall that was never built.

Frequently asked questions

Do levelling clips stay in the finished floor?
No. They are tools, not part of the finished surface. QEP describes its clips as single use with an easy break-off design, and its wedges and caps as reusable. Remove them only after the adhesive has cured.
How long should the clips stay in before removal?
Rubi’s guide says the adhesive typically needs 24–48 hours to cure, depending on conditions and the adhesive type. Remove the parts only after the adhesive maker’s recommended curing time has passed.
Can a levelling system fix an uneven floor?
No. A levelling system aligns the tile faces. It does not flatten the base under them. Check the screed or substrate with a straightedge before you start, and correct any high or low spots first.
What grout width do the clips set?
QEP’s clip-and-wedge version sets a 1/16 in. or 1/8 in. grout width (1.6 or 3.2 mm). Its post-and-cap version offers 1/32, 1/16, 1/8 and 3/16 in. widths (0.8 to 4.8 mm). The two are sold as separate lines, so check which one you buy.
Which tile thickness can a levelling system handle?
QEP lists the clip-and-wedge version for tile between 1/4 in. and 7/16 in. thick (6.4 to 11.1 mm) and the post-and-cap LASH 360 for tile up to 3/4 in. thick (19 mm). Confirm the range on the product sheet for the system you plan to use.

Sources

  1. Mastering Levelling Clips: A Guide To Tile Installation · Rubi (tile tools manufacturer), rubi.com · Placement, spacing, wedges, curing and removal sections
  2. LASH Tile Leveling System, clip and wedge product page · QEP (flooring tools manufacturer), ca.qep.com · Product description and specification
  3. LASH 360 Tile Leveling System, product page · QEP (flooring tools manufacturer), ca.qep.com · Product description, feature list and grout widths
  4. ISO 13006:2018, Ceramic tiles, definitions, classification, characteristics and marking (edition 3) · ISO, committee.iso.org catalogue entry 63406 · Title, edition, publication date, status and abstract
  5. STN EN 12004-1: 2020 Lepidlá na obkladové prvky. Časť 1: Požiadavky, posudzovanie a overovanie nemennosti parametrov, klasifikácia a označovanie (Slovak version of EN 12004-1: 2017) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS) · Normative references (STN EN 14411, 72 5101)