Seismic zone

A seismic zone is an area where the design earthquake action is taken as constant, set by a national map under Eurocode 8.

What is a seismic zone?

A seismic zone is an area where Eurocode 8 takes the design earthquake action as constant. Each country draws its own zones on a national map.

EN 1998-1 describes the earthquake hazard by one value, the reference peak ground acceleration on ground type A, written agR. A country divides its territory into seismic zones. Inside one zone the hazard counts as constant, so agR is the same. The national authorities define the map (JRC, EUR 25204 EN, section 1.2.4).

This page gives no zone names and no agR values for Slovakia. The earlier text of this page listed zones and values that no free official source supports. The values sit in the Slovak national annex.

What do agR and ag mean?

The reference peak ground acceleration agR is the ground acceleration on rock, for the return period that the national authorities choose. EN 1998-1 recommends a return period of 475 years. This equals a 10 % chance of exceedance in 50 years (JRC, section 1.2.2.1).

The design ground acceleration ag is agR multiplied by an importance factor I. The recommended factors for the four importance classes of buildings are below. Each country may choose other values.

Importance classExample buildingRecommended I
IBuildings of minor importance for public safety, such as agricultural buildings0.8
IIOrdinary buildings1.0
IIISchools, assembly halls and cultural institutions1.2
IVHospitals, fire stations and power plants1.4

For an ordinary house, ag equals agR when the national annex keeps I = 1.0. This page did not check the Slovak values of I.

What is a seismic site class?

A seismic site class, called a ground type in EN 1998-1, describes the soil under the building. The soil changes the earthquake action. EN 1998-1 uses ground types A to E and two special types, S1 and S2. JRC lists the recommended values.

Ground typeDescription
ARock or other rock-like formation, with at most 5 m of weaker material at the surface
BVery dense sand, gravel or very stiff clay, at least several tens of metres thick
CDeep deposits of dense or medium-dense sand, gravel or stiff clay
DLoose to medium cohesionless soil, or mainly soft to firm cohesive soil
EA surface alluvium layer of type C or D, 5 m to 20 m thick, over a much stiffer layer
S1, S2Soft clays and silts of high plasticity (S1), or liquefiable soils (S2)

The ground type follows from the shear-wave velocity in the top 30 m, called vs,30. For type B it is 360 to 800 m/s and for type C it is 180 to 360 m/s. If no shear-wave data exist, other soil parameters help to choose the type. For S1 and S2 the engineer needs a special study of the earthquake action. Read geotechnical survey for the investigation that supplies these data.

A soil factor S multiplies the acceleration. The recommended value is S = 1 for ground type A. For the other types it ranges from 1.15 to 1.4 for the Type 1 spectrum and from 1.35 to 1.8 for the Type 2 spectrum. The national annex may set other values.

Which Slovak document sets the earthquake values?

The Slovak national annex to Eurocode 8 is STN EN 1998-1/NA + Z4, class number 73 0036, November 2023. The title is Eurokód 8, Navrhovanie konštrukcií na seizmickú odolnosť, Časť 1: Všeobecné pravidlá, seizmické zaťaženia a pravidlá pre budovy, Národná príloha.

ÚNMS describes it as the consolidated text of the national annex with amendments Z1 to Z4. It replaces the national annex of April 2009 and the amendments Z1, Z2 and Z3. The foreword says EN 1998-1 allows national choice in marked clauses and that the national annex holds these choices. The free preview shows only the cover and the foreword. It holds no zone or agR value.

The same national annex lists STN EN 1998-3 among its references. That part covers the assessment and retrofitting of buildings, which matters for renovation.

Does the Building Act require earthquake design?

Act 25/2025 asks that a building meets the basic requirements for buildings (§ 18 ods. 1). A footnote points to Annex I of Regulation (EU) 2024/3110. Its point 1 covers the robustness of the structure. The structure keeps its integrity when it faces adverse events, including earthquake, so that damage is not out of proportion to the cause.

The act does not name EN 1998. A search of the act text found no word about earthquakes. The Directive (EU) 2024/1275 asks Member States to address risks related to intense seismic activity in new buildings (Article 7(6)). This page found no Slovak rule that sets a zone threshold for houses.

What should I do about seismic hazard when I buy a plot?

Ask the structural engineer of the project two things. The first is the agR that the Slovak national annex gives for the plot. The second is the ground type of the plot. A geotechnical survey and a look at the bearing capacity of the soil give the soil data.

The seismic result then enters the structural design. For the walls that take the horizontal loads read shear wall. For the whole site read site analysis.

What is the damage limitation earthquake?

EN 1998-1 uses two levels of earthquake action for ordinary structures. The design action prevents local collapse. It has a 10 % chance of exceedance in 50 years, which is a mean return period of 475 years. The damage limitation action has a 10 % chance of exceedance in 10 years. This is a mean return period of 95 years (JRC, section 1.2.2.1). Both values are recommended values and each country may choose its own.

Frequently asked questions

What is a seismic zone?
A seismic zone is an area where Eurocode 8 takes the design earthquake action as constant. Each country draws its own zones on a national map. The map gives the reference ground acceleration agR for each zone.
What is a seismic site class?
A seismic site class is the ground type of the site in EN 1998-1. It runs from A for rock to E, plus the special types S1 and S2. The type follows from the shear-wave velocity in the top 30 m or from other soil parameters.
What do agR and ag mean?
agR is the reference peak ground acceleration on rock for a chosen return period. EN 1998-1 recommends 475 years. The design acceleration ag equals agR multiplied by an importance factor, which is 1.0 for ordinary buildings in the recommended values.
Which Slovak document gives the seismic values?
The Slovak national annex STN EN 1998-1/NA + Z4 (class number 73 0036, November 2023) holds the national choices for EN 1998-1. This page read only the free preview and does not print the values.
Does the Slovak Building Act require earthquake design?
Act 25/2025 asks that a building meets the basic requirements (§ 18 ods. 1). The act does not name EN 1998. Annex I of Regulation (EU) 2024/3110 includes earthquake in the structural integrity requirement.
How do I find the seismic data for my plot?
Ask the structural engineer for the agR from the Slovak national annex for your plot. Ask for the ground type as well. A geotechnical survey supplies the soil data for the ground type.

Sources

  1. Eurocode 8: Seismic Design of Buildings, Worked examples, EUR 25204 EN (2012), chapter 1 by E. C. Carvalho · Joint Research Centre of the European Commission · 1.2.2.1, 1.2.2.2, 1.2.3, 1.2.4
  2. STN EN 1998-1/NA + Z4 Eurokód 8: Navrhovanie konštrukcií na seizmickú odolnosť. Časť 1: Všeobecné pravidlá, seizmické zaťaženia a pravidlá pre budovy. Národná príloha (November 2023), free preview · Úrad pre normalizáciu, metrológiu a skúšobníctvo Slovenskej republiky · Obálka, predhovor, normatívne odkazy
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 18 ods. 1, poznámka pod čiarou 9
  4. Regulation (EU) 2024/3110 of the European Parliament and of the Council laying down harmonised rules for the marketing of construction products (Construction Products Regulation) · Official Journal of the European Union · Príloha I bod 1
  5. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · Official Journal of the European Union · čl. 7 ods. 6