Distribution board
A distribution board is an enclosed assembly in a house that splits the supply into outgoing circuits, each with its own protective device.
What is a distribution board?
A distribution board is an enclosed assembly in a house that splits the supply into outgoing circuits, each with its own protective device. The Slovak term is domový rozvádzač. This description follows the catalogue scope of the Slovak standard for household boards, explained in the next section.
The board belongs to the electrical installation of the house. It is a different enclosure from the electricity meter cabinet, which holds the meter. The distributors' metering rules limit that cabinet to metering equipment.
What does STN EN IEC 61439-3 cover?
STN EN IEC 61439-3 is the Slovak edition of the standard for distribution boards that ordinary persons operate. The catalogue abbreviates them as DBO. The Slovak standards office (ÚNMS) lists the standard as valid. It was released on 1 March 2025 in Official Journal 02/25. It adopts EN IEC 61439-3:2024 and IEC 61439-3:2024 without change, and it replaces STN EN 61439-3:2012-11.
The catalogue scope names the boards that the standard covers:
- assemblies that ordinary persons operate, for example by switching or by replacing fuse-links, in domestic (household) applications
- assemblies with outgoing circuits whose protective devices ordinary persons operate
- assemblies for a nominal voltage to earth of 300 V AC at most
- assemblies with outgoing circuits rated up to 125 A and a rated current of 250 A at most
The catalogue entry gives the title, status, edition and scope. It does not reproduce the clauses. This page therefore states no requirement from the standard. Anyone who designs or inspects a board should read the standard text.
What does a real board contain?
Board makers publish product values. They describe one product and do not set a size for any Slovak house. The Hager Vega VB8101PSPD is a surface-mounted board with two rows and overvoltage protection. Its datasheet, dated 15 January 2026, lists the values below.
| Property | Value in the datasheet |
|---|---|
| Number of modules | 36 |
| Number of rows | 2 |
| Rated current | 63 A |
| Dimensions (width x height x depth) | 400 x 475 x 146 mm |
| Ingress protection and impact rating | IP40 and IK07 |
| Earth leakage circuit breakers type A in the delivery | 3 |
| RCCB in the enclosure | 1 |
| Accessible phases | 1 |
| Suitable for outdoor use | No |
The datasheet states that this model is not suitable for outdoor use. A buyer therefore reads the enclosure rating for each product. An indoor board is not a board for damp or weather.
How is a distribution board different from a meter cabinet?
The meter cabinet holds the metering equipment and the distributor sets its rules. The board feeds the circuits of the house. The table compares the two on the points that the distributors' texts cover.
| Aspect | Distribution board | Electricity meter cabinet |
|---|---|---|
| Rules read for this page | STN EN IEC 61439-3, catalogue scope only | Metering rules of ZSD, SSD and VSD |
| Position | No source read sets one | Plot boundary or outer face of the building, by distributor |
| Contents | Outgoing circuits with protective devices | Only metering accessories (ZSD and VSD, section 3.4) |
| Owner | Part of the house installation | The cabinet belongs to the customer. The meters belong to the distributor (ZSD and VSD) |
A smart meter is part of the distributor's metering equipment. It sits in the cabinet, not in the board.
What do the distributor rules say about devices near the meter?
The ZSD rules, version 4 from 1 January 2025, set rules for the main breaker in front of the meter (section 3.3.6). It must meet STN EN 60898-1 or STN EN 60947-2. Its cover must be sealable, and the cover stays sealed at the supply point. Up to 100 A it must have tripping characteristic B or L.
The ZSD rules also require a reverse-voltage disconnecting element after the meter (section 3.3.7). It is mandatory in each separate meter cabinet at a new or rebuilt supply point. It is also mandatory where a generating or storing device connects, for example a photovoltaic installation. It must not stand in the same row as the breakers of the installation.
The SSD rules cover the surge protection device of the customer. SSD prefers the measured part of the installation, which is the part after the meter. It requires the customer to agree any unmetered placement with the distributor before the electrical work starts (SSD section 13).
Where should the board sit in the house?
No source read for this page sets a position or a clearance for the board. The metering texts fix only the position of the meter cabinet. The position of the board is a design decision for the electrical designer.
A common practice is to place the board near the point where the supply enters, for example in the utility room. This is practice, not a rule read from a source. Check any clearance figure in the text of the standards, not in this summary.
Frequently asked questions
- What is the difference between a distribution board and a meter cabinet?
- The meter cabinet holds the meter and metering accessories, and the distributor sets its rules. The distribution board feeds the circuits of the house and belongs to the installation of the house.
- Which standard covers a distribution board in Slovakia?
- The Slovak edition is STN EN IEC 61439-3, released on 1 March 2025. It adopts IEC 61439-3:2024 for boards that ordinary persons operate and replaces the 2012 edition.
- Which breaker sits in front of the meter?
- The ZSD rules call it the main breaker. It sits in the meter cabinet, meets STN EN 60898-1 or STN EN 60947-2, and has a sealable cover.
- Where can the surge protection device go?
- The SSD rules prefer the measured part of the installation, after the meter. An unmetered placement needs the agreement of the distributor before the electrical work starts.
- Can a distribution board be installed outdoors?
- Some boards are rated for outdoor use and some are not. The Hager example on this page is listed as not suitable for outdoor use, so read the rating for each product.
Sources
- STN EN IEC 61439-3: Low-voltage switchgear and controlgear assemblies - Part 3: Distribution boards intended to be operated by ordinary persons (DBO) · ÚNMS SR (Slovak standards office), Normoff catalogue · Catalogue entry: designation, status, release date, level of incorporation, subject of the standard
- Product Datasheet VB8101PSPD: Vega 2Row 7W 1RCD - 2x6A Ltg. RCBOs SPD · Hager (product datasheet, hager.ie) · Technical features table
- Podmienky merania elektriny (Postup č. D6.ELM.01, verzia 4, účinnosť 1. 1. 2025), part of Pravidlá pre prevádzkovanie a montáž merania elektrickej energie · Západoslovenská distribučná, a.s. (ZSD) · 3.3.6, 3.3.7, 3.4, 3.8
- Podmienky merania elektriny, Východoslovenská distribučná, a.s., Košice, 1.10.2024 · Východoslovenská distribučná, a.s. (VSD) · 3.4, 3.8
- Zásady a podmienky montáže a prevádzkovania merania elektriny, Príloha č. 2 · Stredoslovenská distribučná, a.s. (SSD) · 13(1) to (4)