Bentonite waterproofing
Bentonite waterproofing is a clay-based sheet or mat that swells when wet and seals underground concrete under pressure.
Bentonite waterproofing is a clay-based sheet or mat that swells when wet and seals underground concrete when it is held under pressure. In Slovak it is called bentonitová hydroizolácia. German trade texts call a building that combines waterproof concrete with bentonite sheets a brown tank (braune Wanne). It is one of several ways to deal with water, next to the black tank and the white tank.
What is bentonite waterproofing?
Bentonite is a group of clay minerals. BauNetz Wissen, a site sponsored by the German concrete industry, gives montmorillonite as its main component at 60 to 80 per cent. It describes bentonite-based sealing mats as the means of building a brown tank.
BauNetz Wissen defines the brown tank as a surface sealing system. A load-bearing structure of waterproof (WU) concrete and sealing sheets based on bentonite work together. The sealing is on the earth side. The system is used only for underground components, because contact pressure matters for the sealing effect and for the self-healing effect.
How does bentonite swell and seal?
The manufacturer CETCO says that wet, unconfined bentonite can swell up to 15 times its dry volume. This is its value for the VOLTEX DS product. Swelling alone does not make the seal. The same CETCO page says that when the bentonite is confined under pressure, the swell is controlled and forms a dense, impervious waterproofing membrane.
BauNetz Wissen describes the same mechanism. The mat swells into a gel on contact with moisture. The gel also closes pores, gravel pockets and small cracks in the concrete, but only with direct contact and enough contact pressure. The clay therefore needs something to press against it, which is the concrete placed against the mat.
| Statement | Who says it |
|---|---|
| Wet unconfined bentonite can swell up to 15 times its dry volume | CETCO, for VOLTEX DS |
| Confined under pressure, the swell is controlled and forms a dense, impervious membrane | CETCO, for VOLTEX DS |
| Sealing needs direct contact and enough contact pressure | BauNetz Wissen |
| Small concrete cracks can self-seal, no crack width given | CETCO and BauNetz Wissen |
CETCO also says the swelling can self-seal small concrete cracks caused by ground settlement, concrete shrinkage or seismic action. This is the supplier's claim for its own product. The CETCO page gives no crack width, so it is not a guarantee for every crack on a project.
Where is bentonite waterproofing used?
BauNetz Wissen says the brown tank is used only for underground components. The mat sits on the earth side of the structure. For installation it names the order insulation, then the fabric layer, then the concrete. CETCO lists below-grade waterproofing, green roofs, plaza deck waterproofing and tunnelling among the uses of VOLTEX DS. Only the below-grade use matters for a house basement.
How does bentonite compare with other systems?
The table compares the tank types by how they seal. It uses the descriptions of BauNetz Wissen and does not rank them by performance.
| System | How it seals | What the source says it depends on |
|---|---|---|
| Brown tank (bentonite) | A mat swells into a gel on contact with moisture | Direct contact and enough contact pressure, waterproof concrete as the structure |
| Black tank | A continuous sealing skin of bitumen or plastic sheets or bituminous coatings | Weather during installation |
| White tank | Waterproof concrete with both structural and sealing function | Joints, reinforcing bars and injection channels |
| Yellow tank | Fresh-concrete bonding sheets close possible weak spots before concreting | Placed before the concrete is poured |
BauNetz Wissen says a brown tank needs less structural effort for the waterproof concrete than a white tank. Its examples are reinforcement and crack-width limits. It also says the brown tank gives higher safety against water entry than a white tank. Both statements come from a site sponsored by the concrete industry, so check them against the product data. See pre-applied membrane for the sheet systems laid before the concrete, and crystalline waterproofing for the cement-based alternative.
Does DIN 18533 cover bentonite?
DIN 18533 is the German standard series for waterproofing of building parts in contact with soil. Part 1 covers planning, selection and execution of sealing with sheet and liquid-applied materials. Part 2 covers sheet-form materials and their auxiliary materials. DIN Media lists the 2026-06 editions of both as current. The catalogue pages do not name bentonite.
Part 1 also excludes watertight (WU) structures from its scope. A brown tank uses WU concrete, so do not assume that Part 1 is the rule set for it. BauNetz Wissen names the German WU guideline for the design of waterproof concrete structures. No Slovak standard for bentonite sealing was found.
What should an architect check before specifying it?
- That concrete or fill presses on the mat on every face. The sources tie the seal to confinement or contact pressure.
- The lap, termination and joint method in the manufacturer's current data sheet. The CETCO page read for this entry gives no thickness, lap or standard.
- The groundwater conditions. See design groundwater level.
- The installation order the maker prescribes, including how the mat is protected before the concrete is placed.
What do the sources leave open?
The swelling and confinement figures rest on one manufacturer product page. The mechanism rests on BauNetz Wissen, which is sponsored by the concrete industry. No independent test values for swell pressure or water permeability were read. Any number a project needs should come from the chosen product's current data sheet and be checked by the responsible engineer.
Two points are often mixed up. The figure of 15 times describes unconfined clay, not the installed wall, and CETCO ties the dense membrane to confinement. The values of one product are not values of every bentonite product.
Frequently asked questions
- Is bentonite waterproofing the same as a brown tank?
- Not quite. BauNetz Wissen defines the brown tank as a system in which waterproof concrete and bentonite-based sealing sheets work together. The bentonite sheet is the sealing part of that system.
- Why does bentonite need confinement?
- CETCO states that wet unconfined bentonite can swell up to 15 times its dry volume. When the clay is confined under pressure, the swell is controlled and forms a dense, impervious waterproofing membrane. BauNetz Wissen also ties the effect to direct contact and enough contact pressure.
- Can bentonite seal cracks in concrete?
- The manufacturer says its swelling can self-seal small concrete cracks caused by ground settlement, concrete shrinkage or seismic action. This is a product claim without a crack width, so the cracks on a specific project still need to be assessed.
- Where is bentonite waterproofing used?
- BauNetz Wissen says the brown tank is used only for underground components, with the mat on the earth side of the structure.
- Which standard covers this kind of waterproofing?
- DIN 18533 covers sealing of building parts in contact with soil. The catalogue pages do not name bentonite, and Part 1 excludes watertight concrete structures. DIN Media lists the 2026-06 editions as current. No Slovak standard for bentonite sealing was found.
Sources
- VOLTEX DS (EMEA), bentonite waterproofing mat, product page · CETCO (Minerals Technologies) · Product description and product-interest list
- DIN 18533-1:2026-06 Abdichtung von erdberührten Bauteilen, Teil 1: Anforderungen, Planungs- und Ausführungsgrundsätze (Waterproofing of elements in contact with soil, Part 1) · DIN Media (Beuth) · Catalogue page: Ausgabedatum, Ersatzvermerk, Anwendungsbereich
- DIN 18533-2:2026-06 Abdichtung von erdberührten Bauteilen, Teil 2: Abdichtung mit bahnenförmigen Abdichtungsstoffen (Waterproofing with materials in sheet form) · DIN Media (Beuth) · Catalogue page: Ausgabedatum, Ersatzvermerk, Anwendungsbereich
- Was sind Schwarze, Weiße und Braune Wannen? · BauNetz Wissen, Beton section, sponsored by the Deutsche Zement- und Betonindustrie (InformationsZentrum Beton) · Whole article
- Braune Wanne (Glossar) and Bentonit (Glossar) · BauNetz Wissen, Beton section, sponsored by the Deutsche Zement- und Betonindustrie (InformationsZentrum Beton) · Glossary entries Braune Wanne and Bentonit (baunetzwissen.de/glossar/b/bentonit-46737)