Underfloor heating or radiators with a heat pump

8 min read
Photorealistic illustration of a floor cutaway: underfloor heating pipes clipped onto insulation before screeding, with a slim white panel radiator on the wall behind

Why does the emitter decide how a heat pump performs?

A heat pump works best when it heats water to a low temperature. The emitter, the surface that gives heat to the room, sets that temperature. A large surface gets by with lukewarm water. A small surface needs hot water. Brand, output and noise often get the attention at selection. The emitter gets less, and it decides the running cost for the life of the house.

The EU ecodesign rules show the link. Regulation (EU) 813/2013 defines a low-temperature application as one where the heat pump delivers its declared capacity at a water outlet temperature of 35 °C. A medium-temperature application means 55 °C. Heat pumps declare their efficiency for the medium-temperature application, except low-temperature heat pumps, which declare it for 35 °C. So one air-to-water heat pump has a different seasonal coefficient of performance (SCOP) at each water temperature. Compare SCOP at the temperature your house will use, not the best figure in the catalogue.

A heat source is replaced in a few days. An emitter built into screed or plaster is not. This is why you choose the heat emission system before the heat pump. The same logic is behind the comparison in heat pump or gas in a new build. The wider context of a low-energy house is in Passive House from A to Z.

What does SCOP mean and how do I compare heat pumps?

The seasonal coefficient of performance (SCOP) is the overall coefficient of performance of a heat pump over the heating season. It equals the reference annual heating demand divided by the annual energy consumption (Regulation 811/2013, Annex I point 29). The rated coefficient of performance (COP) is the declared capacity divided by the energy input at standard rating conditions (Regulation 813/2013, Annex I point 20). COP therefore describes one operating state, and SCOP describes the whole season.

When you compare, check two things. The first is the water temperature: the energy label gives the class separately for 55 °C and for 35 °C (Annex III point 1.1.3). The exception is low-temperature heat pumps, whose label shows only the 35 °C class (point 1.1.4). The second is the climate. The class rests on average conditions, which Strasbourg defines. The output is also given for the colder climate of Helsinki. It is given for the warmer climate of Athens as well (Annex I point 77 and Annex III point 1.1.3(a)(V)). The label does not predict SCOP in your house. Compare models at the same water temperature.

Floor, wall, radiator or fan coil: how do they differ?

Four types of emitter are realistic in a house with a heat pump. The comparison below is qualitative. For output and water temperature of a specific product, use the manufacturer's data and a heat loss calculation.

Underfloor heating

Underfloor heating has the largest surface, so it works with the lowest water temperature. It heats evenly, takes no wall space, and the screed stores heat. The price is a slow response, because the whole screed has to warm up or cool down. The floor finish matters: thick timber on an underlay or a large carpet adds thermal resistance and forces a higher water temperature. Materials are compared in the article on timber, vinyl and microcement floors. Pipes do not go under built-in wardrobes or kitchen units, so the furniture layout has to be known before the pipes are laid.

Wall heating

Wall heating runs pipes in the plaster, most often on the inner face of an external wall. The layer over the pipes is thin, so it reacts faster than a floor. It suits a renovation where the floor cannot be raised, and it suits bathrooms. The limit is the wall itself. No wardrobe or sofa can stand in front of the heated part. Locate every hole you drill first from the drawing.

Low-temperature radiators

A panel radiator for low water temperature is larger or deeper than a standard one of the same rated output. It reacts within minutes, a thermostatic head controls it, and it puts no demand on the floor. It gives more of its heat by moving air, and at a low water temperature it feels only lukewarm to the touch. Anyone who expects a hot radiator may be surprised.

Fan coils

A fan coil unit blows air with a fan across a water-fed heat exchanger. It is compact and reacts fastest. It can also cool and dry the air in summer. It needs a condensate drain, a power supply for each unit and regular filter changes. In a bedroom the fan noise can be a nuisance.

Cooling through a floor or a wall is limited by the dew point of the room air. If the surface gets colder than the dew point, water condenses on it. Treat floor cooling as an extra, not as the reason to choose a floor. Summer comfort is covered in the article on overheating, shading and cooling.

What changes in a passive or very low-energy house?

Act 555/2005 § 4b ods. 1 says the national plan must ensure that all new buildings are nearly zero-energy buildings from 31 December 2020. A nearly zero-energy building has a very high energy performance, so its heat loss is low. Little heat has to reach each room, and a calculation for each room shows how much.

With low output, the floor surface is only slightly warmer than the room air. The warm floor people expect is therefore hard to feel. Underfloor heating in every room then gives evenness, not a new sensation, and a good envelope gives evenness too. In some houses a heated floor in the bathrooms and the entrance is enough, because the tiles there are cold. A few small radiators in the living rooms complete it. Only the room-by-room heat loss calculation can show this.

Solar gains are the second point. A heavy screed floor keeps releasing heat for hours after the sun has warmed a room. A fast emitter follows such gains better. A room thermostat is a slow tool on a floor, so plan the controls for that response time.

How do you heat a bathroom, and what about the towel rail?

The bathroom is the room where a low-temperature system most often falls short. People often want warmer air there than in the living rooms. The floor area is small, part of it is taken by the bath or shower, and people stand in it wet. The floor alone may not cover the heat loss of the room.

A heated towel rail on low-temperature water gives only part of its catalogue output, so towels dry slowly. A common solution is a floor or a wall as the base heating and a towel rail with an additional electric element. That lets you dry towels in summer, when the heating is off, without raising the water temperature for the whole house because of one room.

Can existing radiators stay with a heat pump?

Often yes, in a renovation that also improved the insulation and windows. Old systems were designed for hot water and for the heat loss of an uninsulated house. After the renovation the heat loss drops, but the radiators keep their size. What decides is the ratio between the output of each radiator at the new, lower water temperature and the new heat loss of its room. A radiator gives less heat at low water temperature than its catalogue figure, which is stated at a higher test temperature. The manufacturer's data shows the output at your planned temperature.

Check it room by room. First calculate the new heat loss. Then compare it with the radiator output at the planned water temperature. A simple field test also helps. In cold weather, lower the water temperature on the existing boiler step by step. Watch which room falls behind first. That room needs a larger emitter. The whole house does not need hotter water because of one room.

Act 555/2005 § 8 ods. 2 písm. b) says the owner of an existing building must balance the heating system hydraulically. This applies after every intervention in the thermal protection or technical system of the building. Replacing the heat source is such an intervention. Balancing makes every room receive its design flow. Radiators need replacing only where they stay too small, for example in the rooms that fell behind in the test. The aim is a low-temperature heating system, not a particular type of emitter.

A subsidy may apply to the heat pump. Zelená domácnostiam II, version 1, effective from 21 October 2026, pays 400 €/kW for a heat pump, with a cap of 4 000 €. The bonus in čl. I ods. 4 raises this to 460 €/kW with a cap of 4 600 € (air-quality management area or ending the use of solid fuels). An air-to-water heat pump needs an entry in the EPREL database. The entry must show a declared output at the 35 °C low-temperature application and a seasonal efficiency class of A++ or higher. Check the current call before you buy. The process is described in the article on replacing a heat source with a subsidy.

How should you zone the house and set up the controls?

A heat pump normally uses weather compensation. The water temperature follows the outdoor temperature, and it should be the lowest at which the house still holds the required temperature. Zone control adds room thermostats with actuators on the manifold, or thermostatic heads on radiators.

In a low-energy house, fewer zones are often better. Heat moves between rooms through walls and ceilings, so a bedroom set lower than its neighbours still receives heat from them. It makes sense to separate the sleeping area from the living area and the bathrooms from the rest. A thermostat in every room is not needed.

The heat pump needs a minimum water flow. If most circuits close, it can start and stop often. Ask the designer how the system keeps enough flow when the actuators close. The usual answers are circuits without actuators in a room that is always heated, a correctly sized buffer tank, or both.

How do you prepare hot water without a legionella risk?

Hot water needs a higher temperature than space heating, so it is the hardest task for a heat pump. The World Health Organization states that Legionella bacteria live and grow in water systems at 20 to 50 °C, with an optimum of 35 °C. The most common route of infection is inhaling contaminated aerosols, for example from a shower. The WHO advises keeping the hot water above 50 °C, which requires the water leaving the heating unit to be at or above 60 °C.

Legionella prevention with a heat pump therefore depends on the designer's settings. Sometimes the cylinder stays below 60 °C so that the heat pump runs more efficiently. Then a scheduled heating cycle, by the compressor or an electric element, has to raise the temperature. The designer should set this cycle according to household size and pipe length, not leave a factory default. Short hot water pipes without dead ends where water stands also reduce the risk.

How do you choose the emitter?

Choose it by three things. The first is the water temperature it allows. The second is the speed of response a room needs. The third is what will stand on the floor and against the wall. In a new house with a low heat loss a floor or a mixed solution usually works. In a renovation the room-by-room check of the existing radiators decides. The bathroom needs a solution of its own.

Frequently asked questions

Can underfloor heating and radiators run on one heat pump?
Yes. It works best when the radiators are sized for water almost as cool as the floor needs. Then the whole house can use one weather compensation curve. If some radiators need hotter water, the heat pump has to make it. Its efficiency then falls, because efficiency depends on the water temperature. Enlarging the weak radiators is usually a better answer than running two temperatures.
Do old radiators work with a heat pump?
Often yes, after insulation and new windows, because the heat loss drops while the radiators keep their size. Compare each radiator's output at the planned water temperature with the new heat loss of its room. Where one room falls short, enlarge that emitter. Act 555/2005 § 8 ods. 2 písm. b) also requires hydraulic balancing after the intervention.
Can I put a carpet on underfloor heating?
A thin rug is fine. A large thick carpet over the whole room adds thermal resistance, and the floor under it gives less heat. Tell the designer in advance, so the design can allow for it with closer pipes or an extra emitter.
Should I switch underfloor heating off while on holiday?
For a short absence it is not worth it. A screed floor reacts slowly, so the return to comfort takes hours. Lower the set temperature a few degrees or use the away mode of the controller.
Does the heat pump subsidy require low-temperature heating?
For an air-to-water heat pump, Zelená domácnostiam II, version 1, requires an EPREL entry. The entry must show a declared output at the 35 °C low-temperature application and class A++ or higher. The subsidy is 400 €/kW with a cap of 4 000 €. The bonus in čl. I ods. 4 raises this to 460 €/kW with a cap of 4 600 €. Check the current call before you buy.
Do I need to heat the hot water cylinder to 60 °C?
Legionella grows at 20 to 50 °C. The World Health Organization advises keeping hot water above 50 °C. This needs 60 °C or more leaving the heating unit. If the cylinder normally stays cooler, the heat pump needs a scheduled higher-temperature cycle. Ask the designer to set it.
What is the difference between COP and SCOP?
COP is the declared capacity divided by the energy input at standard rating conditions, so one operating state (Regulation 813/2013, Annex I point 20). SCOP is the reference annual heating demand divided by the annual energy consumption, so the whole heating season (Regulation 811/2013, Annex I point 29).

Sources

  1. Commission Regulation (EU) No 813/2013 of 2 August 2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · European Commission (Official Journal of the European Union, L 239/136) · Annex I pts 20, 28, 52 to 54; Annex II pt 5 (product information)
  2. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 4b ods. 1, § 8 ods. 2 písm. b)
  3. Všeobecné podmienky národného projektu Zelená domácnostiam II., verzia 1, účinné od 21. októbra 2026 · SIEA (Slovenská inovačná a energetická agentúra) · čl. I ods. 3 písm. e), čl. I ods. 4, Príloha 1 Technické podmienky bod 5
  4. Legionellosis (fact sheet) · World Health Organization · Prevention and control of Legionella in water systems
  5. Commission Delegated Regulation (EU) No 811/2013 of 18 February 2013 supplementing Directive 2010/30/EU with regard to energy labelling of space heaters, combination heaters, packages of space heater, temperature control and solar device and packages of combination heater, temperature control and solar device · European Commission (Official Journal of the European Union, L 239/1) · Annex I pts 29 and 77, Annex III pts 1.1.3 and 1.1.4

Topic

  • Passive house and energy