Micro-Cogeneration

A micro-cogeneration unit is a cogeneration unit below 50 kWe that makes electricity and useful heat together in one process.

What is micro-cogeneration?

A micro-cogeneration unit is a cogeneration unit with a maximum capacity below 50 kWe. This is the definition in Directive 2012/27/EU (Article 2, point 39) and in the recast Directive (EU) 2023/1791 (Article 2, point 45). The recast repealed the older directive from 12 October 2025 and kept the limit.

Act 309/2009 has no word for micro-cogeneration. Its class "very small output" (kombinovaná výroba veľmi malých výkonov) uses the same limit, an installed electrical output below 50 kW (§ 2 ods. 2 písm. g). The class covers any unit below 50 kW, not only units for one house. See combined heat and power for the full definitions.

How does a micro-cogeneration unit work?

A micro-cogeneration unit makes electricity and heat in one process, and the heat goes to the heating system or to hot water. The act calls heat that meets an economically justified demand useful heat (využiteľné teplo). Heat that no one uses does not count.

Act 309/2009 names these technologies for combined production at any size:

  • combustion engine.
  • microturbine.
  • Stirling engine.
  • fuel cell.
  • organic Rankine cycle.

Which technology suits a building depends on the supplier data for that unit. This entry gives no general efficiency figure for any technology, because no source read supports one.

Is micro-cogeneration high-efficiency cogeneration?

It is, if it saves primary energy compared with separate production of heat and electricity. Act 309/2009 calls a unit below 50 kW high-efficiency when a primary energy saving arises (§ 2 ods. 2 písm. j). The EU text says the same for micro units: they may qualify when they provide primary energy savings. For a micro unit, the calculation may use certified data. See primary energy.

How does micro-cogeneration differ from larger cogeneration?

Act 309/2009 sorts cogeneration into three classes by installed electrical output. Micro-cogeneration belongs to the first.

Class in act 309/2009Installed electrical outputEU term
Very small outputbelow 50 kWmicro-cogeneration unit
Small output50 kW up to 1 MWsmall-scale unit (below 1 MW, including micro units)
Large output1 MW and moreno separate term

What does Slovak law allow a micro-cogeneration owner to do with the electricity?

A producer may connect the unit with priority to the distribution system, whatever its output (act 309/2009, § 3 ods. 1 písm. a) and ods. 2). Buy-out of electricity from high-efficiency CHP applies to plants up to 250 kW. It lasts 15 years from commissioning, but not beyond 31 December 2033 (§ 3 ods. 3 and 6). The producer needs a certificate of origin from the regulatory office (§ 8).

Generation in a plant up to 11 kW is not business in energy, unless the producer claims a top-up payment (act 251/2012, § 4 ods. 4, version from 1 July 2026). For self-use of the electricity, see self-consumption.

Does a micro-cogeneration unit need a building permit?

The building act does not name cogeneration units. Act 25/2025 lists, among works that need no decision and no notification, the repair and replacement of technical building systems (§ 18 ods. 5 písm. a) bod 6). The act does not say whether swapping a boiler for a cogeneration unit counts. Ask the building office before you order the unit.

The rules on renewable devices up to 50 kW apply only if the unit burns a renewable fuel such as biomass or biogas. They do not apply to a natural gas unit. Act 243/2026 changes § 18 from 1 January 2027. Check the wording then.

Does the Zelená domácnostiam programme support micro-cogeneration?

No. The SIEA conditions page lists five supported small devices: photovoltaic panels, wind turbines, solar collectors, pellet biomass boilers and heat pumps. Micro-cogeneration units are not on the list. This is the state as of November 2026. See Zelená domácnostiam.

When does micro-cogeneration fit a building?

It fits where the building uses the heat for many hours of the year. Heat that no one uses is not useful heat, so the unit gains nothing from it. A passive house has a low heat demand, which limits the running hours. The sources read give no figure for payback, cost or savings, so this entry states none.

Ask for a calculation for your own building. It needs measured heat demand, the price of fuel and electricity, and the share of electricity used on site.

Frequently asked questions

What is micro-cogeneration?
Micro-cogeneration is cogeneration in a unit with a maximum capacity below 50 kWe. It makes electricity and useful heat in one process (Directive 2012/27/EU Art. 2, recast by Directive (EU) 2023/1791 Art. 2).
What is micro-cogeneration called in Slovak law?
Act 309/2009 calls it cogeneration of very small output (kombinovaná výroba veľmi malých výkonov). The limit is an installed electrical output below 50 kW (§ 2 ods. 2 písm. g).
Is micro-cogeneration high-efficiency cogeneration?
Yes, if it saves primary energy compared with separate production of heat and electricity (act 309/2009, § 2 ods. 2 písm. j). The calculation may use certified data.
Does Zelená domácnostiam support micro-cogeneration?
No. As of November 2026 the SIEA page lists only photovoltaic panels, wind turbines, solar collectors, pellet boilers and heat pumps.
What is the payback of a micro-cogeneration unit?
No verified figure exists in the sources read. Payback depends on the hours of heat use and the share of electricity used on site. It also depends on fuel and electricity prices and the cost of service.
Does micro-cogeneration work in a passive house?
It can run, but heat demand limits the running hours. Heat that no one uses is not useful heat under the act. Calculate the demand of your own house first.

Sources

  1. Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 2 písm. a), g), j), § 3 ods. 1 to 6, § 8
  2. Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency · Official Journal of the European Union · Art. 2 point 39, Annex II
  3. Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency (recast) · Official Journal of the European Union · Art. 2 point 45, Art. 38, Annex III
  4. Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov · Slov-Lex · § 4 ods. 4
  5. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 18 ods. 5 písm. a) bod 6 and písm. i)
  6. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Slov-Lex · Čl. I, § 18
  7. Zelená domácnostiam: Podmienky podpory (SIEA) · Slovenská inovačná a energetická agentúra (SIEA) · Podporované zariadenia