EU Taxonomy for Sustainable Buildings

The EU Taxonomy is an EU list of criteria that decides when an economic activity, such as constructing or owning a building, counts as sustainable.

What is the EU Taxonomy for buildings?

The EU Taxonomy is an EU list of criteria. It decides when an economic activity, such as constructing or owning a building, counts as environmentally sustainable. Regulation (EU) 2020/852 sets four conditions in Article 3. The activity must contribute substantially to an environmental objective and do no significant harm to the other objectives. It must also meet minimum safeguards and comply with technical screening criteria. Delegated Regulation (EU) 2021/2139 holds the technical screening criteria for climate change mitigation and adaptation. Annex I, section 7 covers buildings.

The Taxonomy is a classification for reporting and finance. It is not a building standard or a certification. Article 1(2) lists three groups. They are measures that set requirements for financial products sold as environmentally sustainable, financial market participants, and undertakings that publish a non-financial statement. A private person who builds or buys a home is not on that list.

What are the criteria for new buildings?

Annex I, section 7.1 "Construction of new buildings" sets three tests for a substantial contribution to climate change mitigation. They follow in the list.

  • The primary energy demand of the building is at least 10 % below the nearly zero-energy building threshold. The threshold comes from the national measures that implement Directive 2010/31/EU. An as-built energy performance certificate proves it.
  • Testing for air-tightness and thermal integrity takes place at completion for buildings over 5 000 m². Deviations from the design go to investors and clients. Quality control processes during construction that the regulation calls “robust and traceable” may replace the thermal integrity test.
  • For buildings over 5 000 m², the criterion requires a life-cycle global warming potential for each life-cycle stage. Investors and clients receive it on demand.

The text defines primary energy demand as the calculated energy for the typical uses of a building. It is total primary energy use in kWh per m² and year, as shown on the certificate. For residential buildings the 5 000 m² tests use a representative set of dwelling types. The text states the global warming potential per life-cycle stage in kgCO2e per m² and year. It averages the value over a 50-year study period and uses EN 15978. See whole-life carbon.

The 10 % in section 7.1 refers to the nearly zero-energy threshold. Do not confuse it with Article 11(3) of Directive (EU) 2024/1275. That article sets the maximum energy demand of a zero-emission building at least 10 % below the nearly zero-energy threshold of 28 May 2024. These are two separate rules.

The activity must also do no significant harm to the other objectives. For example, new construction may not stand on arable land of moderate to high fertility. It may not stand on greenfield land of recognised high biodiversity value or on forest land. At least 70 % by weight of non-hazardous construction and demolition waste must be prepared for reuse, recycling or other recovery. Taps, showers and WCs outside residential units have flow and flush limits.

SectionActivityMain energy test
7.1Construction of new buildingsPrimary energy demand at least 10 % below the nearly zero-energy threshold
7.2Renovation of existing buildingsMajor renovation requirements, or primary energy demand cut by at least 30 %
7.7Acquisition and ownership of buildingsCertificate class A or top 15 % of the stock for buildings built before 31 December 2020

What are the criteria for renovation?

Section 7.2 "Renovation of existing buildings" accepts a renovation that complies with the applicable requirements for major renovations. As an alternative, the renovation must reduce primary energy demand by at least 30 %. The activity is a transitional activity under Article 10(2) of Regulation (EU) 2020/852. See also deep renovation.

What are the criteria for buying or owning a building?

Section 7.7 "Acquisition and ownership of buildings" has three tests. They apply to buying real estate and to owning it.

BuildingTest
Built before 31 December 2020Energy performance certificate class A. Alternatively the building is in the top 15 % of the national or regional stock by operational primary energy demand. Evidence compares it with the stock built before 31 December 2020 and separates residential from non-residential buildings
Built after 31 December 2020Meets the section 7.1 criteria that are relevant at the time of acquisition
Large non-residential building with heating or air-conditioning output over 290 kWOperated efficiently through energy performance monitoring and assessment

The only no-significant-harm test for section 7.7 is climate change adaptation, in Appendix A. The national building renovation plan template (Annex II of Directive (EU) 2024/1275) asks for two values. They are the primary energy use that matches the top 15 % and the top 30 % of the national stock, as per Regulation 2021/2139. The EU criteria are the same in every member state. Only the national input differs, such as the nearly zero-energy threshold and the certificate class.

How is alignment with the Taxonomy checked?

An activity aligns with the Taxonomy when it passes the four conditions in Article 3 of Regulation (EU) 2020/852. For a new building the proof under section 7.1 is the as-built certificate, plus the tests and the carbon calculation above 5 000 m². For an existing building under section 7.7 it is the certificate class or the stock-comparison evidence. The Regulation does not name a verifier. The reporting duties sit with undertakings and financial market participants (Articles 5 to 8).

What does the Taxonomy mean for green mortgages?

The text of Regulation (EU) 2020/852 does not contain the word mortgage. Its disclosure duties cover financial products (Articles 5 to 7) and undertakings that publish a non-financial statement (Article 8). The Regulation sets reporting duties and does not set mortgage terms.

The EPBD addresses green mortgages directly. Article 17(11) of Directive (EU) 2024/1275 tells member states to promote green mortgages and green loans for building renovations. Member states also ensure that financial institutions offer them widely and without discrimination and that consumers can see and reach them. Article 2 defines mortgage portfolio standards. Both rules sit in the EPBD, not in the Taxonomy.

What changed in the Taxonomy criteria in 2026?

Delegated Regulation (EU) 2026/73 of 4 July 2025 applies from 1 January 2026. For Annex I of Regulation 2021/2139 it replaces Appendix C, the generic no-significant-harm criteria on chemicals. Sections 7.1, 7.2 and 7.7 keep their substantial-contribution tests in the consolidated text of 1 January 2026.

Frequently asked questions

What is the EU Taxonomy for buildings?
It is the part of the EU Taxonomy that sets criteria for building activities. Annex I of Delegated Regulation (EU) 2021/2139 covers construction of new buildings (7.1), renovation (7.2) and acquisition and ownership (7.7). It is a classification for finance and reporting, not a building standard.
What must a new building meet to be Taxonomy-aligned?
Its primary energy demand must be at least 10 % below the national nearly zero-energy building threshold, shown by an as-built energy performance certificate. Buildings over 5 000 m² also need air-tightness and thermal integrity testing and a life-cycle global warming potential calculation. The building must also pass the no-significant-harm tests.
Does the Taxonomy set an embodied carbon limit for new buildings?
No. Section 7.1 asks buildings over 5 000 m² for a life-cycle global warming potential at each stage. The result goes to investors and clients on demand. It sets no maximum value.
What must an existing building meet when it is bought or owned?
A building built before 31 December 2020 needs energy performance certificate class A. Alternatively it must be in the top 15 % of the national or regional stock by operational primary energy demand. A building built after 31 December 2020 must meet the section 7.1 criteria that apply at acquisition.
Does the Taxonomy apply to a private person who builds a house?
Article 1(2) of Regulation (EU) 2020/852 lists the scope. It covers measures for financial products sold as sustainable, financial market participants and undertakings that publish a non-financial statement. A private person is not on the list.
Is the Taxonomy the same as a green mortgage?
No. Regulation (EU) 2020/852 does not mention mortgages. Directive (EU) 2024/1275 asks member states to promote green mortgages and green loans for renovation in Article 17(11).

Sources

  1. Regulation (EU) 2020/852 of the European Parliament and of the Council of 18 June 2020 on the establishment of a framework to facilitate sustainable investment (Taxonomy Regulation) · European Parliament and Council of the EU, Official Journal L 198, 22.6.2020 · Articles 1, 3, 5 to 8, 10
  2. Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 by establishing the technical screening criteria for climate change mitigation or adaptation (consolidated version of 1 January 2026) · European Commission, Official Journal L 442, 9.12.2021 · Annex I, sections 7.1, 7.2, 7.7
  3. Commission Delegated Regulation (EU) 2026/73 of 4 July 2025 amending Delegated Regulations (EU) 2021/2178, 2021/2139 and 2023/2486 as regards simplification · European Commission, Official Journal L 2026/73, 8.1.2026 · Annex XII, Article 4
  4. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council of the EU, Official Journal L 2024/1275, 8.5.2024 · Articles 2, 11, 17, Annex II