Equipotential bonding

Equipotential bonding is the set of protective bonding conductors that join the conductive parts of an electrical installation.

What is equipotential bonding?

Equipotential bonding is the set of protective bonding conductors that join the conductive parts of an electrical installation. The Slovak term is ochranné pospájanie. The 2007 edition of the Slovak standard STN 33 2000-5-54 named vodiče na ochranné pospájanie, protective bonding conductors, in its title.

The IEC publication behind the standard, IEC 60364-5-54, addresses earthing arrangements and protective conductors, including protective bonding conductors. This page did not read the clauses of either standard. It does not say which parts of a family house the standard requires to be bonded. The designer of the installation takes that from the standard text.

Which Slovak standard covers equipotential bonding?

The standard is STN 33 2000-5-54, Elektrické inštalácie nízkeho napätia, Časť 5-54, Výber a stavba elektrických zariadení, Uzemňovacie sústavy a ochranné vodiče. The ÚNMS catalogue lists several editions. Only the 2012 edition and its changes are valid today.

EditionReleasedStatus in the catalogue
STN 33 2000-5-54:2000-091 September 2000Withdrawn on 1 June 2009
STN 33 2000-5-54:2007-101 October 2007Withdrawn on 1 March 2008, replaced by the 2008-03 edition
STN 33 2000-5-54:2008-031 March 2008Withdrawn on 27 April 2014, replaced by the 2012-08 edition
STN 33 2000-5-54:2012-081 August 2012Valid. Official Journal 07/12, adopts IEC 60364-5-54:2011
STN 33 2000-5-54/Oprava 11 August 2014Valid. Official Journal 07/14
STN 33 2000-5-54/Zmena A11 December 2023Valid. Official Journal 11/23, adopts IEC 60364-5-54:2011/AMD1:2021

The A1 entry notes that the August 2012 text may be used without A1 until 25 November 2025. That date has passed. A design today therefore reads the 2012 text together with A1.

An earlier A1 entry, released on 1 February 2023, shows as withdrawn on 1 December 2023 with no replacement. The December 2023 entry follows it.

Which IEC publication matches the Slovak standard?

The IEC page lists IEC 60364-5-54:2011+AMD1:2021 CSV, edition 3.1, published on 13 April 2021. Its stability date is 2030. The title is Low-voltage electrical installations, Part 5-54: Selection and erection of electrical equipment, Earthing arrangements and protective conductors.

The catalogue entries say that the 2012 Slovak edition adopts IEC 60364-5-54:2011 and that A1 adopts the 2021 amendment. The IEC page therefore describes the same technical text in its consolidated form.

What do the distributor rules say about protective connections?

The metering rules of the distributors touch the protective connections at the meter cabinet. They do not set bonding rules for the rest of the house. The ZSD and VSD texts read for this page do not mention main bonding at the service entrance. The points that the texts make are below.

SourceWhat the text says
ZSD and VSD, section 3.4.2.1The protective link of the meter to the PEN terminal uses a CY conductor of 6 mm2
ZSD, section 3.4.2.1A new direct-metering cabinet holds an earth-neutral (PEN) terminal beside the meter and the breakers
SSD, section 14(1)Metering points use the TN-C system. A change to TN-S is allowed only after the metering part, in the unsealed part of the cabinet

These texts apply to the electricity meter cabinet. The circuits after the meter belong to the distribution board.

Which standard covers protection against electric shock?

STN 33 2000-4-41 covers protection against electric shock in low-voltage installations. The ÚNMS catalogue lists the March 2019 edition as valid. It was released on 1 March 2019 in Official Journal 02/19. It modifies IEC 60364-4-41:2005 with its 2017 amendment and replaces the 2018-02 and 2007-10 editions.

Edition or changeReleasedStatus in the catalogue
STN 33 2000-4-41:2007-10October 2007Replaced by the 2019-03 edition
STN 33 2000-4-41:2018-02 (English text)1 February 2018Withdrawn on 1 March 2019
STN 33 2000-4-41:2019-031 March 2019Valid. Official Journal 02/19
Zmena A111 April 2019Valid. Official Journal 03/19
Oprava O1 (2020)1 May 2020Valid. Official Journal 04/20

The catalogue also lists a Zmena A12 (Official Journal 01/20). Its status was not read. The catalogue scope speaks of basic protection and fault protection of persons and livestock. It adds requirements for supplementary protection in certain cases.

The IEC publication is IEC 60364-4-41:2005+AMD1:2017, edition 5.1, published on 17 March 2017, with a stability date of 2027. Neither the catalogue scope nor the IEC abstract names bonding. This page therefore does not say which clause sets main bonding. The designer takes that from the standard text.

Does a bathroom need supplementary bonding?

The sources opened for this page do not say. They show which standard covers a room with a bath or shower. That is STN 33 2000-7-701, Part 7-701, Priestory s vaňou alebo sprchou. The catalogue lists the December 2025 edition as valid (Official Journal 11/25), with Zmena A11 and an Oprava O1 of April 2026.

The catalogue note says the October 2007 edition may be used in parallel until 6 December 2027. The note on A11 says the December 2025 text may be used without A11 until 6 December 2027. An April 2025 entry exists too. It shows as withdrawn on 1 December 2025.

The scope covers indoor or outdoor locations where a bath or shower is permanently placed. The extent of the location is limited by:

  • the lowest finished floor level
  • a horizontal plane 3 m above that level
  • a vertical virtual surface 4 m from the fixed water outlet of the bath or shower
  • the volume within the walls, floor and ceiling around the location

The IEC publication is IEC 60364-7-701:2019, edition 3.0, published on 14 October 2019. Its abstract does not mention bonding. Ask the designer which clauses of the standard apply to the bathroom.

How does bonding relate to surge and lightning protection?

Surge protection and lightning protection are separate topics with their own standards. The surge protection device page sets out the placement rules of the distributors and the standards for the devices.

STN EN IEC 62305-3 covers the requirements for protecting a structure against physical damage with a lightning protection system (LPS). It also covers protection of people against touch and step voltages near an LPS. The catalogue lists the February 2026 edition as valid (Official Journal 01/26). It adopts EN IEC 62305-3:2024 and replaces the February 2025 entry. The June 2012 edition may be used in parallel until 31 October 2027.

The IEC abstract of IEC 62305-3:2024 (edition 3.0, published on 12 September 2024) does not mention bonding. The STN EN IEC 62305-1 catalogue entry sets the general principles for protecting structures against lightning. This page did not read how these standards treat equipotential bonding.

SSD links the two in section 13(3). An SPD in the unmetered part is allowed only when the overall lightning protection concept needs it. This page did not read how the standards connect bonding to lightning protection.

What should a client ask the electrical designer?

The sources above support these questions:

  • Which edition of STN 33 2000-5-54 does the project use, and does it include the A1 change?
  • Does the project name the edition in force at the time of design, and not an older edition from a drawing set?
  • Which edition of STN 33 2000-4-41 and STN 33 2000-7-701 does the project use?
  • Which connections at the meter cabinet follow the distributor's text for the supply area?

Frequently asked questions

Which Slovak standard covers equipotential bonding?
The ÚNMS catalogue lists STN 33 2000-5-54, Part 5-54, on earthing arrangements and protective conductors. The valid edition is the 2012-08 text with the A1 change of December 2023.
Is the 2007 edition of STN 33 2000-5-54 still valid?
No. The catalogue shows the October 2007 edition as withdrawn on 1 March 2008. The 2008 edition that replaced it was withdrawn on 27 April 2014.
Can I use the 2012 edition without the A1 change?
The note on the A1 entry allowed it until 25 November 2025. That date has passed, so a design today reads the 2012 text with A1.
Which IEC publication matches the Slovak standard?
IEC 60364-5-54:2011+AMD1:2021, edition 3.1. It addresses earthing arrangements and protective conductors, including protective bonding conductors.
Does a bathroom need supplementary bonding?
The sources opened do not say. The standard for rooms with a bath or shower is STN 33 2000-7-701, December 2025 edition. Ask the designer for the clauses that apply.
What does ZSD say about the protective link at the meter?
ZSD says the protective link from the meter to the PEN terminal is a CY conductor of 6 mm2. See section 3.4.2.1, effective 1 January 2025.

Sources

  1. IEC 60364-5-54:2011+AMD1:2021 CSV, Low-voltage electrical installations, Part 5-54: Selection and erection of electrical equipment, Earthing arrangements and protective conductors · IEC Webstore · Abstract and edition data
  2. STN 33 2000-5-54, Elektrické inštalácie nízkeho napätia. Časť 5-54: Výber a stavba elektrických zariadení. Uzemňovacie sústavy a ochranné vodiče (edition 2012-08, catalogue entry) · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entry
  3. STN 33 2000-5-54/Zmena A1 (catalogue entry) · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entry
  4. STN 33 2000-5-54, editions 2000-09, 2007-10 and 2008-03 (catalogue entries) and Oprava 1 of 2014 · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entries norma/79992, 104533, 104757, 119203
  5. STN 33 2000-4-41, Elektrické inštalácie nízkeho napätia. Časť 4-41: Zaistenie bezpečnosti. Ochrana pred zásahom elektrickým prúdom (edition 2019-03, catalogue entry) · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entries norma/127671, 125860, 128244, 130667
  6. IEC 60364-4-41:2005+AMD1:2017 CSV, Low voltage electrical installations, Part 4-41: Protection for safety, Protection against electric shock · IEC Webstore · Abstract and edition data
  7. STN 33 2000-7-701, Elektrické inštalácie nízkeho napätia. Časť 7-701: Požiadavky na osobitné inštalácie alebo priestory. Priestory s vaňou alebo sprchou (edition 2025-12, catalogue entry) · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entries norma/141081, 141085, 142270, 140075
  8. IEC 60364-7-701:2019 Low-voltage electrical installations - Part 7-701: Requirements for special installations or locations - Locations containing a bath or shower · IEC Webstore · Abstract and edition data
  9. STN EN IEC 62305-3, Ochrana pred bleskom. Časť 3: Hmotné škody na stavbách a ohrozenie života (edition 2026-02, catalogue entry) · ÚNMS SR, normy.normoff.gov.sk (standards catalogue) · catalogue entries norma/141578, 139841
  10. IEC 62305-3:2024 Protection against lightning - Part 3: Physical damage to structures and life hazard · IEC Webstore · Abstract and list of changes
  11. Podmienky merania elektriny (Postup č. D6.ELM.01, verzia 4, účinnosť 1. 1. 2025), part of Pravidlá pre prevádzkovanie a montáž merania elektrickej energie · Západoslovenská distribučná, a.s. (ZSD) · 3.4.2.1
  12. Zásady a podmienky montáže a prevádzkovania merania elektriny, Príloha č. 2 · Stredoslovenská distribučná, a.s. (SSD) · 13(3), 14(1)
  13. STN EN IEC 62305-1, Ochrana pred bleskom, Časť 1: Všeobecné princípy (catalogue entry) · ÚNMS SR, normy.normoff.gov.sk · Catalogue entry