Wood-boring insects
Wood-boring insects are beetles whose larvae tunnel through timber and weaken it. Exit holes and fine frass show their work.
What are wood-boring insects?
Wood-boring insects are beetles whose larvae spend most of their lives tunnelling through timber. The adult lays eggs in cracks and in end grain. The larvae hatch, bore inward and pack their tunnels with frass, a powder of excrement and wood. In Slovak practice the group is drevokazný hmyz. The Slovak Monuments Board methodology notes that this insect works hidden in the wood, and often you cannot tell whether it is still active.
Two groups matter in houses. The Monuments Board says that longhorn beetles (tesaříci) need contact with the outside to breed, so they attack freely accessible structures such as roof spaces. Furniture beetles (červotoči) live their whole cycle in the building. They settle, for example, in timber floors on the ground floor. Insects look for places where moisture and temperature change little over the year. The methodology gives wood protected by clay screed as an example.
Which beetles attack timber in houses?
Two species have fact sheets from public bodies. One is the house longhorn beetle (Hylotrupes bajulus, called the old house borer by the University of Maryland). The other is the common furniture beetle (Anobium punctatum). The first prefers softwood. The Maryland sheet lists pine, spruce, hemlock and fir. The Monuments Board reports that old Slovak ceiling beams are spruce, fir or pine. The second attacks seasoned sapwood.
| Feature | House longhorn beetle | Common furniture beetle |
|---|---|---|
| Adult length | 15 to 25 mm | 3 to 4 mm |
| Exit hole | Oval, 6.5 to 10 mm, edges often ragged | Round, 1.5 to 2 mm |
| Timber | Pine, spruce, hemlock, fir | Seasoned sapwood of ash, beech, elm and oak. Sound oak heartwood is not at risk |
| Frass | Fine, like sawdust | Gritty pellets, wheat-grain shaped when magnified |
| Larva | Mature larva 20 to 40 mm long | Needs 2 to 5 years to complete growth |
The Maryland sheet says the house longhorn beetle normally infests US homes that are less than 10 years old. Do not apply that age to old European houses. Neither sheet is Slovak, so species names and wood lists are a guide for the survey, not a local ranking.
How moist must wood be for insects to attack?
The sources give different figures, and this entry does not pick one.
| Source | What it says |
|---|---|
| Monuments Board, Annex 2 (types of damage) | Wood-boring insects need wood moisture of at least 10 % |
| Monuments Board, Annex 3 (timber protection) | Insects attack wood at around 10 %. In buildings you usually cannot dry wood below 10 % |
| Monuments Board, Annex 8 (historic building) | For insect attack the wood needs enough moisture, more than 18 % |
| English Heritage, furniture beetle sheet | Eggs and young larvae of the furniture beetle do not survive below 12 % wood moisture or below 55 % relative humidity |
The Monuments Board annexes disagree with each other, 10 % against above 18 %. They also describe different things, some a lower limit for attack and some the level at which insects find enough moisture. The practical message is the same in Annex 3. Drying wood below 20 % stops wood-decay fungi but not insects, so building measures against insects have a limited effect. The wood moisture reading helps with the diagnosis. It does not clear a timber of insects. See moisture content of building materials.
How can you tell whether an infestation is active?
Holes alone do not prove activity. English Heritage says fresh holes look sharp and old holes look dark and dirty. The University of Maryland sheet adds a test. Pale, fresh-looking frass under an exit hole means a recent emergence. If you sweep the piles away and more appear within a week or two, the infestation is active. English Heritage says old frass that falls out of cracks when objects move is not a sign of activity. Large larvae can make rasping or clicking sounds, mostly in spring and summer when the wood is relatively moist.
| Sign | What it suggests |
|---|---|
| Fresh, sharp exit holes | Recent emergence |
| Dark, dirty exit holes | Old damage, probably inactive |
| Pale frass that comes back after clearing | Active infestation |
| Old frass that fell from cracks | Not a sign of activity |
| Rasping or clicking from the timber | Larvae feeding |
One or two beetles indoors do not prove an infestation. The Maryland sheet notes that they may arrive with firewood or through an open window.
What is the life cycle of a wood-boring beetle?
Eggs hatch into larvae that live their whole life inside the wood and enlarge their tunnels as they grow. English Heritage gives 2 to 5 years for the furniture beetle. The Maryland sheet says the larval stage depends on species, temperature and humidity. It lasts from several months to, more commonly, 2 to 5 years or more. The mature larva pupates near the surface. The adult bites its way out, for the furniture beetle in spring or early summer. Adults live only a few days or weeks, so the larvae do the damage.
Can you leave old galleries in a beam?
Sometimes. The Monuments Board allows wood with inactive galleries to stay. The surface quality must be adequate, and the member must have enough capacity without counting any degraded wood. It requires chemical treatment of active galleries. First establish the activity and extent of the attack, and only then plan the repair. If the attack is extensive and active, the whole building enters the remediation. The same annex adds that cutting or planing longhorn-attacked wood does not protect it, and it spoils the look of the structure. Wood that kept its load capacity but has a badly eaten surface can be strengthened with synthetic resin or have an insert fitted. Where a beam end lost material, a structural repair applies. See beam-end repair.
How do you remove an active infestation?
The Monuments Board calls removal demanding and long, and says it needs knowledge of the insect, patience and repeat treatment. The methods it names:
- Chemical treatment. It is the most used method. The insect dies on contact and the process takes several weeks. The product does not reach every part of the member, so you must check the result and repeat if needed.
- Hot air. Heating the wood to 60 to 80 °C for at least one hour kills insects reliably. Use it only in exceptional cases, because drying can crack the wood.
- Gas or gamma radiation. Exceptional, and they kill but do not protect.
- Microwaves. Problematic in monuments, because metal parts in the timber can heat above ignition temperature.
The methodology requires a trained specialist to design and apply chemical products after a survey. Use them only when other measures are not enough, and keep records for the client. See timber preservative.
How do you prevent a new attack?
For new timber the Monuments Board sets three rules. Bark must not enter the building. The wood must not come from windfall or long storage in the forest. Old roof timber receives only wood treated against fungi and insects. Near forests or large parks, closing all roof openings and fitting dense mesh in dormers and vents is an effective measure against longhorn beetles. Wood that is wet when built in dries and cracks, and the cracks open unprotected wood where longhorn beetles lay eggs. The methodology therefore recommends an extra spraying of deep cracks about two years after construction. Fungi need a different treatment. See dry rot.
Frequently asked questions
- Do exit holes mean the beetles are still active?
- Not necessarily. English Heritage says holes do not mean the infestation is active. Fresh, sharp holes with pale frass beneath point to recent emergence, while dark, dirty holes suggest old damage.
- At what wood moisture do insects attack?
- Sources differ. Two Monuments Board annexes give about 10 %, and a third gives above 18 %. English Heritage says furniture beetle eggs and young larvae do not survive below 12 %. Drying wood below 20 % stops fungi but not insects.
- Which beetles attack roof and ceiling timber?
- The Monuments Board says longhorn beetles attack freely accessible structures such as roof spaces, while furniture beetles settle in timber floors on the ground floor. Fact sheets name the house longhorn beetle and the common furniture beetle.
- Can wood with old insect galleries stay in the building?
- Yes, in some cases. The Monuments Board allows inactive galleries when the surface quality is adequate and the member has enough capacity without degraded wood. Active galleries need chemical treatment.
- Does drying the timber remove the insects?
- Not reliably. The Monuments Board says drying below 20 % stops fungi but not insects, and in buildings you usually cannot reduce wood moisture below 10 %. Heating wood to 60 to 80 °C for at least one hour kills insects but can crack the wood.
- Who should treat an active infestation?
- A trained specialist. The Monuments Board requires a specialist to design and apply chemical treatment after a survey. The survey sets the type, extent and degree of attack. The client receives records of the work.
Sources
- Pest Fact sheet No 2: Furniture beetle or Woodworm (Anobium punctatum) · English Heritage · Life cycle; Signs of damage; Materials damaged; Is the infestation active?
- Wood-Boring Beetles: Old House Borer and Powderpost Beetles (Fact Sheet 689) · University of Maryland, Maryland Cooperative Extension (archived publication) · Old House Borer Beetle; Characteristics of an Active Infestation
- Furniture beetle (Anobium punctatum) identification guide · Natural History Museum, London · Identification guide
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 8: Historická stavba a její nosné konstrukce · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 9.1 Pôsobenie vonkajších činiteľov
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 3: Ochrana dřeva · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 2.4; 2.5; 2.6 Chemické prostriedky; 2.6 Likvidácia napadenia dreva
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 9, Drevo a drevené stavby, Príloha č. 2: Typy poškodení dreva · Pamiatkový úrad Slovenskej republiky (authors Jaroslav Hrivnák, Michal Kloiber) · 2 Biotické poškodenie dreva (table)
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 6: Dřevěné konstrukce · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 3.1 Stropní trámy