Timber preservative

A timber preservative is a biocidal product applied to wood to stop fungi and insects. It backs up dry detailing and does not replace it.

A timber preservative is a biocidal product that protects wood against fungi and wood-destroying insects. The Slovak term is chemická ochrana dreva, chemical protection of wood. EU law treats it as a biocide, not as an ordinary paint or sealer. Regulation (EU) No 528/2012 lists "wood preservatives" as product-type 8 in Annex V. These are products that preserve wood or wood products, from and including the saw-mill stage. They control wood-destroying or wood-disfiguring organisms, including insects. The type covers both preventive and curative products.

Why does protection start with the construction?

The Slovak Monuments Board methodology on timber protection lists four measures against pests. They are good wood, constructional measures against moisture, surface treatment against weather, and biocidal chemicals. It sets a rule for the last one. Use chemicals only when the other protective measures are not enough. The same methodology says that unprotected wood that can dry quickly resists attack better. It also says that drying wood below 20 % stops fungi but not insects.

RouteWhat it doesSource
Constructional protectionKeeps wood dry: distance from ground, no direct contact with wet masonry, ventilation, no wet processes against timberMonuments Board, Annex 3, section 1
Chemical protectionApplies a biocide to the wood so that harmful organisms are controlledRegulation 528/2012, Art. 3(1)(a) and Annex V, product-type 8
Both togetherChemicals where the other measures are not sufficientMonuments Board, Annex 3, section 2.6

See moisture content of building materials for how wood moisture is measured.

What does EU law say about the product?

Regulation (EU) No 528/2012 of 22 May 2012 concerns the making available on the market and use of biocidal products. It applies from 1 September 2013. Three points matter for a specification.

  • Article 3(1)(a) defines a biocidal product as a substance or mixture, in the form supplied to the user. The intention is to destroy, deter, render harmless, prevent the action of, or otherwise control a harmful organism. It must work by means other than mere physical or mechanical action.
  • Article 17(1) says biocidal products shall not be made available on the market or used unless authorised in accordance with the Regulation.
  • Article 3(1)(l) defines a treated article as any substance, mixture or article treated with, or intentionally incorporating, one or more biocidal products. Under Article 58(2) such an article may be placed on the market only on two conditions. Its active substances must be on the Union list or in Annex I, and any conditions there must be met.

Timber treated at the sawmill is therefore a treated article, and the product used on site must be an authorised biocide. The Monuments Board methodology says the same in plain terms. A chemical product must be approved by the competent authorities and be marked as the rules require. Its type designation shows which fungi, moulds and insects it acts against, whether it is preventive or curative, and whether water can leach it out.

Which standards describe timber durability?

Two European standards come up most often. Both are adopted in Slovakia as STN standards, which the Slovak standards catalogue marks as identical to the EN text. The table gives titles and editions as the catalogue shows them.

StandardEnglish titleEditionWhat it covers
STN EN 335Durability of wood and wood-based products: use classes: definitions, application to solid wood and wood-based productsReleased 01.09.2013, identical to EN 335:2013Defines five use classes for service situations and the biological agents relevant to each
STN EN 460Durability of wood and wood-based products: guidance on performanceReleased 01.05.2023, identical to EN 460:2023Guides the choice of wood and wood-based products where fungi, wood-destroying insects or marine borers may cause decay. Excludes glue durability and aesthetic effects

A use class is not a performance class and does not say how long the wood lasts. EN 335 describes the classes that matter in a house. In use class 1 the wood is inside a construction, not exposed to weather or wetting, and fungal attack is insignificant. Insect attack is possible. In use class 2 the wood is under cover, with occasional but not persistent wetting. Condensation may occur, and fungal attack is possible. Use class 3 is wood above ground exposed to weather. Use class 4 is wood in direct contact with ground or fresh water. The designer assigns the class for each element.

How are preservatives applied?

The Monuments Board methodology names three basic methods and gives the depth each reaches. The depth shows why the method decides the result.

MethodUseDepth reached
Pressure impregnationAlmost only new wood, in specialised plants. The most effective method, and the quantity absorbed can be measuredMore than 10 mm. The whole sapwood of pine
SoakingMostly new wood, in tanks made for it. Soaking for more than 10 minutes works better than dipping for secondsA few tenths of a millimetre to 2 or 3 mm
Brush, spray or dipNew and built-in old wood on site. The least effective methodWater-based products 1 to 2 mm. Products in organic solvent 2 to 5 mm

Spruce, fir, larch and Douglas fir are hard to impregnate, and pressure impregnation reaches 10 to 15 mm in them. Heartwood takes up less product than sapwood. Load-bearing members outdoors must be impregnated by pressure, because surface treatment does not protect them. Today's pressure products use copper, chromium and boron ions as the fungicide. Carbolineum, made from coal tar, is limited to industrial use such as railway sleepers because of its carcinogenic effect. The methodology advises treating built-in old wood only after mechanical cleaning, because a product on a dirty surface is ineffective. It also advises treating after joints and cuts are finished, or painting the new cuts afterwards. Wet wood cracks after building in and exposes untreated inner layers. The methodology therefore recommends an extra spraying of deep cracks about two years after building in.

Does a preservative cure an existing attack?

No. A preservative protects sound wood, and the Monuments Board treats dry rot and insect attack as repair tasks. For dry rot it requires removal of all infected wood and finding and eliminating the outbreak and its cause. Replacement timber must be treated beforehand, and only pressure impregnation or long steeping reliably protects new wood against dry rot. For wood-boring insects it requires you to establish the activity and extent of the attack before you choose the repair. Active galleries are treated chemically, and inactive ones can stay in some cases. Treatment of an old beam end belongs in the beam-end repair design.

When should an architect specify a preservative?

The Monuments Board sets conditions that apply to any building. A specialist must design and apply the treatment, based on a qualified survey that finds the type, extent and degree of attack. The product goes on in the quantity the manufacturer specifies. Too little gives poor protection, and too much loads the environment for nothing. For old wood that you can check by eye at any time, the methodology says to use targeted curative treatment where needed. It calls other chemical protection there usually unnecessary, uneconomic and harmful to the environment. Keep records of the treatment and hand them to the client. Without checks the results are not guaranteed.

Use class from EN 335 and the guidance in EN 460 help to frame the question. The question is where the wood will sit and how wet it can become, not which product is on offer.

What do people often get wrong about preservatives?

The first mistake is to treat a preservative as a cure for wet timber. It does not replace moisture control. The second is to rely on a use class printed on a product. A use class describes a service situation, so the designer must match the situation to the class. The third is to expect a coating to protect something it cannot reach. A surface coating gives the shallowest protection, and permanently wet wood in use class 4 needs pressure impregnation. The fourth is to forget the scope of EN 460. It excludes glue durability and aesthetic effects such as discoloration, surface weathering and mould, so wood can resist decay and still look weathered.

Frequently asked questions

What is a timber preservative?
A biocidal product that protects wood against fungi and wood-destroying insects. In EU law it falls under product-type 8, wood preservatives, in Annex V of Regulation 528/2012. The Slovak term is chemická ochrana dreva.
Does a timber preservative replace moisture control?
No. The Monuments Board methodology says to use chemicals only when other protective measures are not sufficient. Keeping wood dry and ventilated comes first.
Which method protects timber best?
Pressure impregnation reaches more than 10 mm and the quantity absorbed can be measured. Soaking reaches up to 2 or 3 mm and brushing or spraying 1 to 5 mm, depending on the solvent. Outdoor load-bearing members need pressure impregnation.
Does a preservative stop dry rot in a rotten beam?
No. Dry rot needs removal of all infected wood and of its cause. A preservative only protects the replacement timber, and the Monuments Board says only pressure impregnation or long steeping reliably protects new wood against dry rot.
Which standards describe timber durability in Slovakia?
STN EN 335 defines the five use classes. STN EN 460 gives guidance on choosing wood products where fungi, insects or marine borers may cause decay. The Slovak catalogue lists both as identical to the European text.
Must a preservative be authorised?
Yes. Article 17(1) of Regulation 528/2012 says biocidal products shall not be made available on the market or used unless authorised under the Regulation. The Monuments Board methodology adds that the product must be approved and correctly marked.

Sources

  1. Regulation (EU) No 528/2012 of the European Parliament and of the Council of 22 May 2012 concerning the making available on the market and use of biocidal products · European Union, Official Journal L 167, 27.6.2012, via the EU Publications Office · Article 3(1)(a) and (l); Article 17(1); Article 58(2); Annex V, product-type 8
  2. STN EN 335, Durability of wood and wood-based products: Use classes, definitions, application to solid wood and wood-based products (catalogue entry) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), Normoff catalogue · Standard details
  3. STN EN 460, Durability of wood and wood-based products: Guidance on performance (catalogue entry) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), Normoff catalogue · Scope
  4. SIST EN 335:2013 Durability of wood and wood-based products: Use classes: definitions, application to solid wood and wood-based products (sample pages) · iTeh Standards (sample of CEN standard EN 335:2013) · 1 Scope; 4.2 to 4.6 Use classes 1 to 5
  5. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 3: Ochrana dřeva · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 1 Ochrana dreva proti vlhkosti; 2 Ochrana a úpravy povrchu dreva; 2.3 Konzervační prostředky; 2.4; 2.5; 2.6 Chemické prostriedky; 2.6 Likvidácia napadenia dreva