Water softener
A water softener is a salt-regenerated ion-exchange unit that removes calcium and magnesium from water, so less scale forms in heaters.
A water softener (zmäkčovač vody) is a unit on the cold water supply of a building that removes calcium and magnesium, the two ions that make water hard. Architects consider one when the local water is hard and scale could damage the hot water equipment. The European standard EN 14743 describes the usual type: a fixed, automatic, salt-regenerated cation-exchange softener.
What is a water softener and which standards cover it?
The standard for these units is EN 14743. The edition in force is EN 14743:2005+A1:2007, listed by DIN as DIN EN 14743:2007-09. It covers permanently installed, automatic, salt-regenerated softeners that work on the cation-exchange principle. It sets requirements for materials, design, construction, operation and installation. Tests must verify every requirement. The 2006-01 German edition is withdrawn and was replaced by the 2007-09 edition.
The German supplement DIN 19636-100:2023-05 applies only together with EN 14743. It keeps national requirements for hygiene and materials that EN 14743 could not harmonise.
How does ion exchange work in a water softener?
The resin starts with sodium ions on its surface. As hard water flows through, the resin releases sodium and takes up calcium and magnesium in exchange. When the sodium is used up, the unit regenerates. A strong salt solution is flushed through the resin and carries the calcium and magnesium out of the unit. After that, the softener returns to service.
| Phase | What happens in the unit |
|---|---|
| Service | Water flows through the resin, and calcium and magnesium are exchanged for sodium |
| Regeneration | Salt solution flows through the resin and removes the captured calcium and magnesium |
Softening adds sodium to the water. Penn State Extension gives 7.5 mg per quart for each grain per gallon of hardness removed, which is a US unit, so use the water report and the manufacturer data for a Slovak supply.
What hardness values does Slovak law give?
Annex 1 of decree 91/2023 Z. z. of the Ministry of Health lists calcium and magnesium among the substances that are desirable in drinking water. The table shows the values read from the annex.
| Indicator | Value in annex 1 | Type of value |
|---|---|---|
| Calcium plus magnesium | 1.1 to 5.0 mmol/l | Recommended value |
| Calcium | More than 30 mg/l | Recommended value |
| Magnesium | 10.0 to 30.0 mg/l | Recommended value |
| Magnesium | 125 mg/l | Limit value (medzná hodnota) |
| Sodium | 200 mg/l | Limit value (medzná hodnota) |
A recommended value is desirable for health, and missing it does not rule out use of the water for drinking. When a limit value is exceeded, the water loses its fit quality for that indicator. The annex adds a rule for treatment. If the water has calcium or magnesium above the recommended values, the treated water may not fall below 30 mg/l calcium and 10 mg/l magnesium. The annex does not set a hardness level at which a house needs a softener.
Why does hard water matter for heaters and hot water cylinders?
Penn State Extension states that hardness minerals can build up as scale on water heaters and shorten their life. They can also plug pipes. Hard water also lowers the effect of soaps and detergents. A softener removes the calcium and magnesium before the water reaches the heater. Appliance maintenance still follows the manufacturer's instructions. Plant room items that scale can affect include an indirect hot water cylinder and an electric storage water heater.
What happens to the regeneration salt and the wastewater?
Each regeneration uses salt and water, and the spent brine leaves the unit through a drain. The plant room therefore needs a drainage point for this discharge. Ask the sewer operator about the discharge before installation. Keep the salt supply reachable for refilling. Plan the softener together with the domestic hot water preparation system, so both share one plan for drains and access.
Is softened water allowed for drinking in Slovakia?
Decree 91/2023 Z. z. sets the indicators and limit values for drinking water and for hot water. It has been in force since 1 April 2023 and repealed decree 247/2017 Z. z. from that date. Under § 2 ods. 3 the limit values must be met where drinking water comes out of the tap. A softened supply is therefore judged by a test at the tap, together with the sodium, calcium and magnesium values above. Penn State Extension adds that a softener does not remove the more serious drinking water contaminants. The decree also sets limits for Legionella in domestic distribution systems, see Legionella prevention. A softener does not replace that sampling.
How is a water softener different from a sediment filter?
A softener changes the ions in the water. A sediment filter only holds back particles. The two do different jobs. Penn State Extension notes that a softener will not necessarily remove other drinking water problems.
| Feature | Water softener | Sediment filter |
|---|---|---|
| Main job | Exchanges calcium and magnesium for sodium | Holds back solid particles |
| How it recovers | Regenerates with salt solution | Is cleaned or replaced |
| Effect on scale | Reduces scale caused by hardness | Does not reduce hardness |
What should architects plan around a water softener?
Plan the softener as a plant room item, at the same time as the cold water supply, the hot water cylinder and the drains. Leave space for the unit and the salt supply, access for refilling and a drain point. Penn State Extension says toilets and outside taps can be bypassed, while showers, sinks and laundry connections should probably be softened. Size the unit from the water test and the hot water demand.
Frequently asked questions
- What does a water softener do?
- It swaps calcium and magnesium ions in the water for sodium ions on a resin, so less scale forms in water heaters. It does not remove other dissolved substances, so it is not a general treatment unit.
- Does every building need a water softener?
- No. The need depends on the hardness of the local supply and on the appliances in the building. The usual first step is a water test from the water supplier or a laboratory.
- Can softened water be used for drinking?
- Only if it still meets decree 91/2023 Z. z. at the tap. In the decree, treated drinking water may not fall below 30 mg/l calcium or 10 mg/l magnesium, and sodium has a limit of 200 mg/l.
- What hardness does the Slovak decree recommend?
- Annex 1 of decree 91/2023 Z. z. gives a recommended range of 1.1 to 5.0 mmol/l for calcium plus magnesium. It is a recommended value, so a result outside it does not make the water unfit to drink.
- Where does the salt brine go?
- Regeneration brine leaves the unit through a drain. Ask the sewer operator about the discharge before installation, and keep the drain connection in the plant room plan.
- Does a softener replace a sediment filter?
- No. A softener exchanges ions, while a sediment filter holds back particles. The two do different jobs.
Sources
- Vyhláška Ministerstva zdravotníctva SR č. 91/2023 Z. z., ktorou sa ustanovujú ukazovatele a limitné hodnoty kvality pitnej vody a kvality teplej vody (consolidated text from 1 April 2023) · Slov-Lex (Ministerstvo spravodlivosti SR) · § 2 ods. 3; § 10; annex 1, rows 69 to 73
- Vyhláška MZ SR č. 247/2017 Z. z. (time version from 1 April 2018 to 31 March 2023) · Slov-Lex (Ministerstvo spravodlivosti SR)
- DIN 19636-100:2023-05 Softeners (cation exchangers) for drinking water installation - Part 100: Requirements for application of softeners, supplement to DIN EN 14743 · DIN Media (DIN Deutsches Institut für Normung), standards catalogue
- DIN EN 14743:2007-09 Water conditioning equipment inside buildings - Softeners - Requirements for performance, safety and testing (EN 14743:2005+A1:2007) · DIN Media (DIN Deutsches Institut für Normung), standards catalogue
- Water Softening · Penn State Extension, Pennsylvania State University