Public-Benefit Structure

A public-benefit structure (verejnoprospešná stavba) is a structure in an approved plan that the law lets the state expropriate land for.

What is a public-benefit structure?

A public-benefit structure (verejnoprospešná stavba) is a structure that an approved spatial planning document marks as a ground for expropriation. The expropriation act, zákon č. 282/2015 Z. z., names two grounds. One is a purpose that a law sets. The other is a public-benefit structure under an approved planning document (§ 2 ods. 1 písm. b). The proceedings must still prove the public interest.

The current planning act, zákon č. 200/2022 Z. z., does not use this word. That act uses a related term, structure in the public interest (stavba vo verejnom záujme). The spatial planning act describes it in § 5 písm. v).

Which structures are in the public interest under the planning act?

The planning act names five groups of structures in the public interest, if a planning document defines them:

  • transport infrastructure and technical infrastructure
  • structures for amenities in education, social services, health care and public administration
  • structures for production
  • structures for the protection of cultural, historical and natural heritage, and for the protection and creation of landscape
  • structures for the development or protection of the territory of the state, a region, a municipality or a zone

Where do planning documents show these structures?

The municipal plan (územný plán obce) determines the areas and corridors for structures in the public interest (§ 22 ods. 3 písm. l). The zone plan (územný plán zóny) determines the areas and routes for them (§ 23 ods. 3 písm. g). The municipal land-use plan page explains the plan itself.

The planning authority can change a plan as needed (§ 33 ods. 1). A change of the plan changes what the plan marks.

Does the marking in the plan allow expropriation by itself?

No. Marking a structure in a plan is one of four conditions. Expropriation is allowed only if all four are met (§ 2 ods. 1):

  1. It is limited to the necessary extent.
  2. It serves the public interest for a lawful purpose or for a public-benefit structure under an approved plan, and the proceedings prove that interest.
  3. The owner receives adequate compensation.
  4. The aim cannot be reached by agreement or in another way.

The expropriation must also match the aims of spatial planning. The planning authority confirms this with a binding opinion (§ 2 ods. 2). A law can also set a public-interest purpose without a plan (§ 2 ods. 1 písm. b).

What must the future owner try before expropriation?

The party that wants the land (vyvlastniteľ) must first try to reach an agreement. It sends a written proposal that names the compensation and explains the public interest. The proposal tells the owner that silence for 90 days counts as refusal (§ 3 ods. 3), unless a special act sets another period (§ 3 ods. 1).

Proof of a failed attempt is a written refusal or proof of delivery with no answer within 90 days (§ 3 ods. 1). The attempt is not required in some cases. Examples are an unknown owner or an owner whom a law or a court forbids to transfer the property (§ 3 ods. 2).

StepRuleWhere
Offer to agreeWritten proposal with compensation and reasons§ 3 ods. 3
Silence of the ownerCounts as refusal after 90 days, unless another act sets another period§ 3 ods. 3
ProceedingsThe regional office of the Office for Spatial Planning and Construction decides§ 7 ods. 1
PaymentOne payment within 30 days after the decision becomes final, for loss of ownership§ 6 ods. 1

How much compensation does the owner receive?

The owner receives adequate compensation in money (§ 4 ods. 1). The basis is the general value (všeobecná hodnota) of the land or building from an expert opinion not older than two years. The compensation may not be lower than that value (§ 4 ods. 3). It also covers reasonable costs, such as moving movable property, a change of residence and notary and court fees (§ 4 ods. 6 and 7). The expropriation act sets no price per m². The value comes from the expert opinion in each case.

Does a builder need to own the land when the structure can be expropriated for?

A builder of a structure for which rights to land can be expropriated can prove its land rights later. The Building Act accepts proof when the builder applies for verification of the design (§ 29 ods. 3).

How is a public-benefit structure different from a reserved structure?

The two terms answer different questions. A reserved structure is defined by how hard it is to build. A public-benefit structure is defined by a planning document and by its role in expropriation.

PointPublic-benefit structureReserved structure
Act282/2015 Z. z. (expropriation) with 200/2022 Z. z. (planning)25/2025 Z. z. (Building Act)
TestMarked in an approved plan, and the public interest is provedListed in § 2 ods. 8 as hard to build
EffectCan support expropriationAdds duties for builder, supervision and contractor

One structure can be both. A motorway is reserved under the Building Act and is transport infrastructure under the planning act.

Frequently asked questions

What is a public-benefit structure in Slovak law?
A public-benefit structure (verejnoprospešná stavba) is a structure that an approved planning document marks as a ground for expropriation (§ 2 ods. 1 písm. b of 282/2015 Z. z.). The proceedings must prove the public interest.
What term does the current planning act use?
Zákon č. 200/2022 Z. z. uses the term structure in the public interest (stavba vo verejnom záujme). It lists five groups, such as transport and technical infrastructure, and amenities for education and health care (§ 5 písm. v).
Can a structure be reserved and in the public interest?
Yes. The two terms come from different acts and do not exclude each other. A motorway is a reserved structure and also transport infrastructure.
What is the difference between a reserved structure and a public-benefit structure?
A reserved structure is hard to build and adds duties for the builder and contractor. A public-benefit structure is marked in a plan and can support expropriation. See the table in the body for the comparison.
Does the plan marking alone allow expropriation?
No. Expropriation also needs the necessary extent and adequate compensation. The public interest must be proved, and agreement must be impossible (§ 2 ods. 1 of 282/2015 Z. z.).
How much compensation does an owner receive?
The owner receives money. The basis is the general value from an expert opinion not older than two years, and the sum may not be lower (§ 4 ods. 3 of 282/2015 Z. z.). Reasonable costs are added (§ 4 ods. 6).

Sources

  1. Zákon č. 282/2015 Z. z. o vyvlastňovaní pozemkov a stavieb a o nútenom obmedzení vlastníckeho práva k nim a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, Slov-Lex · § 1, § 2, § 3, § 4, § 6 ods. 1, § 7 ods. 1
  2. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 5 písm. v), § 22 ods. 3 písm. l), § 23 ods. 3 písm. g), § 33 ods. 1
  3. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 8, § 29 ods. 3