Low-Carbon Building

A low-carbon building is a building planned to cut greenhouse gas emissions over its whole life cycle, from products to demolition.

A low-carbon building is a building planned to cut greenhouse gas emissions over its whole life, from making its materials to demolishing it. No Slovak or EU act sets a threshold that makes a building "low-carbon". This page uses the definition of whole-life-cycle greenhouse gas emissions in Directive (EU) 2024/1275, the recast Energy Performance of Buildings Directive (EPBD).

What emissions does a building cause over its life?

Article 2(24) of the EPBD calls them whole-life-cycle greenhouse gas emissions. They cover the production and transport of construction products, construction-site activities, energy use in the building and the replacement of products. They also cover demolition, waste transport and waste management, including reuse, recycling and final disposal.

Operational emissions are one part of this total. Article 2(23) defines them as emissions linked to the energy use of the technical building systems during use and operation. The emissions from products and construction are the embodied carbon. Both together are the whole-life carbon.

The directive says the 2050 vision for a decarbonised building stock goes beyond operational emissions (recital 7). It says that design and the choice of materials strongly influence whole-life emissions, for new buildings and for renovations.

How is the carbon footprint of a building calculated?

The EPBD uses the life-cycle global warming potential (life-cycle GWP). Annex III gives the method for new buildings:

  • The result is a number for each life-cycle stage in kgCO2eq per m2 of useful floor area.
  • The reference study period is 50 years.
  • Data, scenarios and calculation follow EN 15978.
  • The building elements in scope follow indicator 1.2 of the Level(s) EU framework.
  • Data on specific construction products under Regulation (EU) No 305/2011 must be used when available.

A national calculation tool or method may replace this method for disclosure. Other tools may be used if they meet the minimum criteria of Level(s). The European Commission states that building professionals do the calculation with national methods that follow the Union framework.

The standard EN 15978 is paid. This page cites only what the directive quotes from it.

When must the footprint be disclosed?

Article 7(2) of the EPBD requires the life-cycle GWP in the energy performance certificate of new buildings. The Slovak amendment 246/2026 Z. z. adds the same duty to § 7 ods. 1 písm. l) of act 555/2005 Z. z. The amendment takes effect on 1 January 2027.

DateNew buildings that need a GWP figure in the certificateSource
Before 1 January 2028None under the directiveEPBD Article 7(2)
From 1 January 2028New buildings with a useful floor area above 1 000 m2EPBD Article 7(2)(a), 555/2005 § 7 ods. 1 písm. l) bod 1
From 1 January 2030All new buildingsEPBD Article 7(2)(b), 555/2005 § 7 ods. 1 písm. l) bod 2

Slovakia missed the EPBD transposition deadline of 29 May 2026. Until 31 December 2026 the current text of act 555/2005 Z. z. contains no life-cycle GWP duty.

Does a legal carbon limit exist for buildings in Slovakia?

No limit is in force. Article 7(5) of the EPBD requires each member state to publish a roadmap by 1 January 2027. The roadmap must introduce limit values on the total cumulative life-cycle GWP of new buildings and set targets from 2030. It must show maximum limit values for climatic zones and building types.

In the sources read for this page, no Slovak limit value or roadmap exists yet.

How does a low-carbon building differ from a zero-emission building?

A low-carbon building has no legal energy or carbon limit. A zero-emission building is a legal category in Article 2(2) and Article 11 of the EPBD. It needs zero on-site carbon emissions from fossil fuels and very low energy demand.

TermLegal statusWhat it measures
Low-carbon buildingNo legal definitionEmissions over the whole life, no fixed limit
Nearly zero-energy buildingRequired for new buildings until the zero-emission datesEnergy use
Zero-emission buildingRequired for new public-owned buildings from 2028 and all new buildings from 2030Energy demand and operational emissions, with the life-cycle GWP disclosed separately
Net-zero carbon buildingNo legal definitionVoluntary WorldGBC levels

What design choices lower whole-life emissions?

The EPBD names resource efficiency and circularity as the way to reduce whole-life emissions (recital 8). It also says parts of the building stock may become a temporary carbon sink.

The directive does not rank materials or give emission values per material. Compare real products with a life-cycle calculation of the project under Annex III, not with a general table.

For a renovation, the renovation passport must give general information on circularity options. It must also cover ways to reduce the whole-life emissions of construction products (Annex VIII). See deep renovation.

A building with a very low heating demand is not automatically low-carbon. The heating demand does not show the emissions from its products.

Frequently asked questions

What is the difference between a low-carbon building and an energy-efficient building?
An energy-efficient building has low energy use. A low-carbon building has low emissions over its whole life, including products, construction and demolition. The EPBD counts both, as operational emissions and as whole-life-cycle emissions.
How is the carbon footprint of a building calculated?
The EPBD requires the life-cycle global warming potential in kgCO2eq per m2 of useful floor area over 50 years. The calculation follows EN 15978 and the Level(s) framework, or a national method that meets its minimum criteria.
Which emissions does the footprint of a building include?
It includes production and transport of products, construction-site activities, energy use and replacements, demolition, and waste transport, reuse, recycling and disposal. This is the EPBD definition of whole-life-cycle greenhouse gas emissions.
Is there a legal definition of a low-carbon building in Slovakia?
No. Slovak law has no definition of a low-carbon building. Amendment 246/2026 Z. z. adds the life-cycle global warming potential to act 555/2005 Z. z. from 1 January 2027.
When must new buildings in Slovakia show their life-cycle carbon?
From 1 January 2028 for new buildings above 1 000 m2 of useful floor area, and from 1 January 2030 for all new buildings. The figure goes in the energy performance certificate.
Is there a legal carbon limit for new buildings?
Not yet. Member states must publish a roadmap on limit values for the life-cycle GWP of new buildings by 1 January 2027. The sources read show no Slovak limit value.

Sources

  1. Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast) · European Parliament and Council of the EU · Recitals 7 to 9, Art. 2(2), 2(23), 2(24), 2(25), 7(2), 7(5), 11, Annex III, Annex VIII
  2. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Národná rada Slovenskej republiky · Čl. I bod 39 (§ 7 ods. 1 písm. l)
  3. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky
  4. Global warming potential of buildings · European Commission, Directorate-General for Energy