Crack gauge

A crack gauge is a small instrument attached across a crack in a wall that shows whether the crack is opening or closing over time.

What is a crack gauge and what does it measure?

A merač trhlín, or crack gauge, is a small instrument attached across a crack. It shows whether the crack is opening or closing over time. It does not say why the crack formed. It shows whether the crack is still moving. Clive Richardson writes in The Building Conservation Directory: monitor movement when the probable cause is unclear or the movement may be progressive.

The guidance of the Slovak heritage office (Pamiatkový úrad SR) for historic buildings adds two points. The cause of every defect must be established, because different causes can produce defects that look alike. And a crack that signals a defect differs from one that does not threaten the function of the structure. The second kind includes the cracks that cement mortar develops as it shrinks while it hardens, described in shrinkage crack. The first kind includes a structural crack. A gauge alone cannot tell you which kind you have.

How do tell-tales differ from calibrated crack monitors?

Richardson hopes that the days of well-meaning builders sticking glass tell-tales across cracks with blobs of resin have long gone. He writes that the glass mostly came unstuck, or schoolboys broke it for fun. He adds that the equipment available today is vandal-resistant and gives meaningful results when used wisely. Table 1 compares the two approaches.

MethodWhat it isWhat the source says
Glass tell-taleA strip of glass stuck across the crack with resinMostly came unstuck, or was broken for fun (Richardson)
Calibrated crack monitor, for example Humboldt HC-2937A cursor that moves against a calibration scale as the crack opens or closes; with calipers, a reading to ±0.1 mmAttached with screws and adhesive (Humboldt manual); modern monitors are vandal-resistant (Richardson)

Richardson adds that monitors aid diagnosis and prognosis, but they do not replace an understanding of the structure.

Where should a crack gauge be placed?

Place the gauge across the crack at a point where the crack is clearly visible and where it can be read again without disturbance. The Humboldt manual says to attach the monitor with the vertical zero line on its scale parallel with the crack. The monitoring spigots point down, on the right side of the crack. Choose one spot for each crack and mark it. Read the same location every time. If the crack runs through a loose surface, attach the gauge to sound material. Note the condition of the surface in the record.

Record the direction of the crack too. The heritage guidance says that crack directions show the directions of the forces. A force perpendicular to the crack causes a tension crack. A shear force acts along the crack. Photographs taken from the same position, with a scale in the frame and a date, record the context that a number alone does not show.

How do you attach and read a crack monitor?

The Humboldt manual for the HC-2937 Crack Monitor Plus gives this sequence:

  1. Attach the monitor over the crack with the vertical zero line on the calibration scale parallel with the crack.
  2. Keep the monitoring spigots pointed down and on the right side of the crack.
  3. Attach it with screws and adhesive, then remove the four pre-set pegs.
  4. If the crack opens or closes, the cursor moves relative to the scale. Record the movement on the record sheet.
  5. For a finer reading, place digital or vernier calipers against the projecting spigots and measure the distance.

Date every reading and note the position of the cursor and the method used. Use the same method on each visit, or the readings cannot be compared. Ask the engineer how often to read the gauge and for how long. A building condition survey is the wider check that places the crack among other findings in the building.

Why monitor a crack before you repair it?

Richardson advises against filling a crack just to see whether it returns. A rigid filler can restrict the cyclical movement that causes the problem and let it escalate. He suggests examining the crack faces first. Are the edges fresh and clean? Is there old paint or filler in the crack? How old is the decoration? He says to monitor when the cause is still unclear or the movement may be progressive. Once the causes are clear, he says, it is straightforward to eliminate them and mend the damage. If you suspect differential settlement, ask the engineer whether a monitor is the right check before you plan any crack stitching.

Which cracks suggest subsidence?

The British Geological Survey (BGS) page on shrinking and swelling soils cites the Association of British Insurers (2018). It says the effects of subsidence in a property can usually be seen as cracks in walls that:

  • are more than 3 mm thick
  • run diagonally across the wall
  • are wider at the top than at the bottom
  • are visible from inside and outside
  • occur near doors and windows.

BGS also says that cracks can appear for other reasons than subsidence. Settlement, where a building settles under its own weight, can cause cracks, especially in newly built homes and extensions. A gauge shows movement and the list shows possible signs. Neither one names the cause.

How does crack width suggest severity?

BRE Digest 251 rests on a study of 130 properties that suffered subsidence. It sorts cracks into six categories. The categories link the width and number of cracks to the right type of repair. Table 2 summarises the three groups that BRE describes in general terms. BRE calls its comments a simplification, and it notes that whether the crack widths are increasing with time can also change the classification. These are UK sources, not Slovak rules.

BRE categoryBRE labelWhat it affects
0, 1 and 2, widths up to 5 mmAestheticAppearance; BRE says only redecoration is required
3 and 4ServiceabilityWeather-tightness and the operation of doors and windows
5StabilityLikely to need structural intervention

BRE says a building professional should be consulted where damage is significant. Use the table to prepare the conversation with the engineer, not as a diagnosis. A single width measurement is only a starting point. A later reading shows whether the crack is changing, and that change matters more than the first number.

Frequently asked questions

Is a crack gauge the same as a structural assessment?
No. A gauge records movement at one point over time. Richardson says monitors are aids to diagnosis and prognosis, not a substitute for understanding structures. An engineer decides what the readings mean and what to do about them.
Can I fill a crack and see whether it comes back?
Richardson advises against it. He writes that you should examine cracks to find their cause and not fill them rigidly to see if they reappear. A rigid fill may restrict cyclical movement and make the problem escalate. Look at the crack faces before you decide on any repair.
Why do glass tell-tales fail?
Richardson writes that the glass mostly came unstuck, or schoolboys broke it for fun. He says the monitors available today are vandal-resistant and give meaningful results when used wisely.
How precise are the calipers used with a crack monitor?
The Humboldt HC-2937 manual says digital or vernier calipers record measurements to ±0.1 mm when you place the jaws against the projecting monitoring spigots.
Does a crack wider than 3 mm mean the house is unsafe?
Not by itself. The British Geological Survey reports an Association of British Insurers list of subsidence signs. One sign is a crack more than 3 mm thick. The Survey says cracks can also come from other causes, such as settlement. BRE calls its own width scheme a simplification. A qualified professional who inspects the house decides whether it is safe.
Which cracks suggest subsidence?
The British Geological Survey cites the Association of British Insurers (2018). The list names cracks that are more than 3 mm thick or run diagonally. It also names cracks that are wider at the top than at the bottom, show inside and outside, or occur near doors and windows. Rippling wallpaper is another sign. These are UK signs, so an engineer should judge a Slovak house.

Sources

  1. HC-2937 Crack Monitor Plus, product manual (06.24) · Humboldt Mfg. Co. · Fixing Instructions, steps 1 to 6
  2. Structural Movement: Is it Really a Problem? · The Building Conservation Directory (Clive Richardson) · Dimensional instability; Assessment and conclusion
  3. Assessing cracks in houses · BRE (Building Research Establishment) · How cracks are assessed; When to consult a professional
  4. Swelling and shrinking soils · British Geological Survey · What are the effects of shrink-swell?
  5. Príloha č. 8. Historická stavba a její nosné konstrukce (Statika, technické normy a sanácie) · Pamiatkový úrad SR (methodology by Jan Vinař) · 4. Statika stavby (úvod); 9.3 Ochrana před vlhkostí