Building condition survey
A building condition survey is a systematic inspection that records the structure, moisture and materials of an existing building.
What does a building condition survey cover?
A building condition survey, in Slovak stavebnotechnický prieskum, is a structured inspection of an existing building before anyone designs work on it. It records the load-bearing structure, the condition of the materials, signs of moisture and defects, and what has been repaired or changed in the past. The survey records what is there. The judgement on stability is a separate step, the static assessment by a structural engineer. That assessment depends on the facts the survey collects.
The Monuments Board of the Slovak Republic (Pamiatkový úrad SR) describes the documents and steps of a survey of historic timber structures. They run from a field sketch and a first look to targeted testing. Its text is written for timber. The same order of steps can serve as a model for an older masonry house, but that is our reading, not the Board's statement.
| Phase | What the Monuments Board describes |
|---|---|
| Measuring the structure (zameranie konštrukcie) | At least a field sketch of the structure with the typical dimensions of its parts and how they interact with neighbouring structures |
| Starting points of the survey (východiská prieskumu) | An inspection from outside and inside, a check whether neighbouring buildings share the same problems, a search for visual signs of overload such as sagging, deformation and cracks, and an assessment whether special safety measures such as scaffolding are needed during the survey |
| Basic survey (základný prieskum) | Mainly visual methods with simple tools. Its aim is an overall picture and identifying the places where more advanced methods are needed |
| Detailed building-technical survey (podrobný stavebnotechnický prieskum) | The step that uses more advanced equipment or special methods when the basic survey finds defects or a suspected serious defect. It measures moisture content in the timber, identifies the extent of biological damage, determines strength characteristics for structural calculations and monitors the environment |
How deep does the survey need to go?
The depth depends on the purpose. The Monuments Board text separates three situations.
| Purpose | Depth described in the methodology |
|---|---|
| Routine maintenance | A simplified survey, mostly without special equipment or diagnostic methods, is enough |
| Designing changes to the building | Exact knowledge of the state of the materials, the structures and the conditions that decide stability and service life |
| Sophisticated survey for a static assessment | Measurements with all details and structural connections, including all plans and sections, so that every part of the structure can be identified |
The table follows the methodology's own wording on timber structures. It shows the logic of the survey rather than a fixed scope for a house. Ask the surveyor to write down which phases are included and what each one will produce.
What does a basic survey look for in an older house?
The methodology calls visual inspection simple and quick. It notes that the result is partly subjective, and that this lessens as the surveyor gains experience. The starting-point steps and the basic survey together look for:
- biological and non-biological damage, and cracks,
- risky places such as damp spots, where problems are likely to start,
- the overall geometry of the building and how loads pass through its parts,
- the joints between parts and whether they work as intended,
- the condition of the most exposed roof parts, such as valleys, corners, chimneys and other roof penetrations,
- concealed spaces in the structure, such as covered ceiling structures, and whether they can be reached,
- past repairs and changes recorded in the structure.
For this the surveyor uses simple tools: a hammer, an awl or chisel, measuring tapes, a camera and a hand moisture meter.
Which documents should you gather before the survey?
The methodology says the available documentation should be collected before the survey starts. That means drawings, photographs and written records, as well as everything about changes and repairs, past use, and unusual events or loads. Older plans are often schematic and incomplete. The methodology lists oral accounts among the documentation to collect.
Who may carry out the detailed survey?
The Monuments Board calls the detailed survey demanding work that only people who are qualified and authorised for it may carry out. Slovak law names this work. Act No. 138/1992 Zb. on authorised architects and authorised building engineers lists stavebno-technické prieskumy (building-technical surveys) among their work. It also lists diagnostic measurements of structures and equipment. This applies to engineers for building structures, civil engineering structures, structural statics and technical equipment. Each engineer acts within the scope of the authorisation (§ 5 ods. 6 písm. d, for the engineers in § 5 ods. 3 to 5).
Two more provisions apply. An engineer authorised for complex architectural and engineering services may prepare building surveys, diagnostic building measurements and expert opinions (§ 5 ods. 2 písm. g). The engineer for structural statics may also carry out building measurements and building diagnostics of load-bearing structures (§ 5 ods. 4 písm. c).
The methodology also places the survey documents in the pre-design phase and says that authorised engineers under § 5 of that act prepare them. That statement is written for timber structures. The act names the activity but does not define it. The Building Act 25/2025 Z. z. does not use the term.
How does the survey relate to a static assessment?
The survey gathers the facts and the static assessment judges them. The Monuments Board says that sophisticated surveys, for example those made for a static assessment, need measurements with all details and structural connections. The engineer who issues the assessment is described in the entry on the structural engineer.
The survey may also point to the need for other investigations. Cracks that move are a separate question, covered by structural crack. For soil under the foundations, see geotechnical survey, and for damp, see moisture content of building materials.
Is a condition survey maintenance or a change to the building?
The survey itself is an inspection and does not change the building. The works that follow may be a different matter. The Building Act 25/2025 Z. z. defines maintenance as construction work. It keeps the building in functional technical condition and operation, without intervention in the load-bearing structure and without changing its use or external appearance (§ 2 ods. 10, in the text valid until 31 December 2026). Work that touches the load-bearing structure therefore falls outside that definition.
The owner must keep the building in good technical condition. The owner must also arrange planned inspections of the load-bearing structures in time (§ 45 ods. 2 písm. a and e). Maintenance that could affect the stability of the building needs a notification to the building authority (§ 18 ods. 4 písm. c). Check which category applies before starting.
Act 243/2026 Z. z. amends the Building Act from 1 January 2027. The definition of maintenance then becomes § 2 ods. 13, and its wording changes. The condition on external appearance is removed. The notification rule for maintenance that may affect stability moves to § 18 ods. 4 písm. f. The act's wider context is in the entry on the Building Act.
What should an owner ask for in a survey?
Ask for the scope in writing: which phases are included, which methods are used, what will be measured and documented, and who signs the report. Ask whether the results will be usable for a design or a static assessment, since the methodology ties the depth of the survey to that purpose. If the survey is ordered before buying an old house, ask the surveyor which points remain open and which tests would answer them. These are practical suggestions, not a legal checklist.
Frequently asked questions
- Is a building condition survey the same as a static assessment?
- No. The survey records facts about the building, such as its materials, moisture, past repairs and visible defects. The static assessment is the structural engineer's judgement on stability and mechanical resistance, and it relies on evidence of that kind.
- Can a simple visual check replace a detailed survey?
- Not for design work. The Monuments Board says a simplified survey without special equipment is enough for routine maintenance. For design work it says the exact state of materials and structures must be known. It calls the detailed survey demanding work for qualified and authorised persons. It also notes that visual checks depend on the experience of the person doing them. Its text is written for timber structures.
- What documents should I gather before a survey starts?
- Collect drawings, photographs, written records, and everything about changes, repairs, past use and unusual events or loads. Older plans are often schematic, so notes from people who know the building are also worth keeping.
- Does a survey lead directly to a building permit?
- No. A survey is an inspection and gives no permission. The planned work decides the procedure. Under act 25/2025 Z. z., maintenance that could affect the stability of the building needs a notification to the building authority (§ 18 ods. 4 písm. c). Ask the authority what your work needs before you start.
- Who may carry out a stavebnotechnický prieskum in Slovakia?
- Act 138/1992 Zb. names the activity among the work of authorised engineers (§ 5 ods. 6 písm. d). It applies to engineers for building structures, civil engineering structures, structural statics and building equipment, each within the scope of the authorisation. The act does not define the term.
- What does the Building Act say about the owner's duties?
- Under the Building Act, No. 25/2025 Z. z., the owner keeps the building in good technical condition, removes operating defects in time, and arranges planned inspections of the load-bearing structures in time (§ 45 ods. 2 písm. a and e).
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 10; § 18 ods. 4 písm. c; § 45 ods. 2 písm. a and e
- Zákon SNR č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slovenská národná rada, via Slov-Lex · § 5 ods. 2 písm. g; § 5 ods. 4 písm. b and c; § 5 ods. 6 písm. d
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 9 Stavebná časť: Drevo a drevené stavby, Prieskumy drevených konštrukcií · Pamiatkový úrad Slovenskej republiky (Jaroslav Hrivnák, Michal Kloiber) · 1 Úvod; 2 Súčasná situácia; 3 Dokumentácia and 3.1 Zameranie konštrukcie; 4.1 Východiská prieskumu; 4.2 Základný prieskum; 4.3 Podrobný stavebnotechnický prieskum
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I body 4, 5, 25 a 62; Čl. XV