Staged loan drawdown
A staged loan drawdown is a construction loan paid out in tranches as the building reaches agreed stages, under the loan contract.
What is a staged loan drawdown?
A staged loan drawdown is a construction loan paid out in parts, called tranches, as the building reaches agreed stages. The bank does not transfer the full amount when the contract is signed. It releases each tranche after the stage is checked against evidence that the bank accepts. Examples of such evidence are a stage report, a supplier invoice or an inspection, but each bank sets its own rules. In Slovak banking the concept is called čerpanie úveru po etapách. It matters most when the house is built rather than bought ready-made.
Where is the drawdown rule set?
The stages are set by the loan contract, not by a fixed statutory schedule. Act 90/2016 Z. z. on housing loans requires the contract to state the total amount and its currency. It must also state the podmienky upravujúce jeho čerpanie, which are the conditions that govern how the loan is drawn. The stages, the evidence the bank accepts and the timing of each payment belong in that part of the contract. The contract must also identify the residential property. The act accepts an amendment that identifies it. The amendment must be signed before any part of the money is paid out (§ 13 ods. 4 písm. i)).
The act defines a housing loan to cover the construction of a residential property as well as its purchase. The National Bank of Slovakia describes the home loan as a long-term loan. It can run up to 30 years, and the property is pledged as security. That source does not describe how the money is paid out.
How does the bank decide when to release each tranche?
Each release depends on a check that the bank runs against the completed stage. The bank's own rules decide what it accepts, so read the evidence and the timing in the contract and do not assume them. In general practice the check combines documents from the builder with an inspection, by the bank's appraiser or by a valuer the bank engages. The bank's appraiser is a different role from the independent construction supervisor, who works for the owner. The property valuation that supports the loan is a separate document from the stage checks.
The table is an example of how a schedule could look. It does not come from any bank's terms, so read your own contract.
| Stage | Evidence a schedule could require | What the builder should expect |
|---|---|---|
| Groundwork and foundations | Signed stage report, invoice for the groundwork | Payment follows acceptance of the stage, not the invoice date |
| Shell (walls, floor slabs, roof structure) | Inspection, photographs, invoice | Delay if the inspection is not booked in time |
| Roof covering, windows and doors | Invoice, delivery note, stage report | Partial stages may need separate sign-off |
| Interior finishes and building services | Final stage report and invoices | The bank may tie the last tranche to completion of the works |
How does drawdown change the contractor payment schedule?
A builder paid by tranche is paid after the bank releases money for a stage, which is later than the date the work is done. That gap between work and payment is the main financing issue. The payment terms in the contract for work should match the stages in the loan contract, or the builder carries the cost of the gap. The construction budget should show the cost of each stage so the tranches can be compared against it.
| Payment route | When the builder is paid | Main risk for the owner | Main risk for the builder |
|---|---|---|---|
| Owner pays from own savings, per invoice | Shortly after each invoice, as agreed | Cash must be available at each stage | Payment depends on the owner's cash flow |
| Bank tranche released to the owner, who pays the builder | After the owner receives the tranche | Must pass the money on promptly and keep records | Late payment if the owner's transfer is delayed |
| Bank tranche paid directly to the builder, where the bank's terms allow it | After the bank accepts the stage | Stage approval can delay the building timeline | Gap between work and payment if the inspection is slow |
How is drawdown different from a loan paid out in one sum?
A loan paid out in one sum, as when buying a finished property, gives the borrower the whole amount at once. A staged drawdown releases money in tranches. Ask the bank how it charges interest on the part already drawn, and when repayment starts. The mortgage loan is the product. Staged drawdown is one way of paying it out. The loan-to-value ratio sets how much the bank will lend against the property, while the drawdown sets when that money arrives.
What should an owner check in the loan contract?
- The definition of each stage and the evidence the bank accepts for it.
- How long the bank has to release a tranche after a stage is reported.
- The interest rate and the conditions that apply to it (§ 13 ods. 4 písm. j)), and how the bank charges interest on the part already drawn.
- Whether repayment can be deferred during building. The act exempts a deferral for building a residential property from the rule on gradual repayment. The deferral may not run longer than 18 months from the first drawdown (§ 8 ods. 33 a 34 písm. e)).
- Whether the contract, or an amendment signed before the first payment, identifies the property.
These sections were read in the consolidated text of Act 90/2016 Z. z. in force from 1 December 2025 to 19 November 2026. A new version takes effect on 20 November 2026. It keeps these provisions under the same section numbers, but read it before you rely on a reference.
Does the building act decide how the money is paid?
No. Act 25/2025 Z. z. (Stavebný zákon), in force since 1 April 2025, governs permits, notifications and the final inspection of the works. It replaced the 2022 act, Zákon o výstavbe 201/2022, which people may still search for. Its procedures decide what work may legally start and when, but not when the bank pays. In practice the two can interact. If a stage cannot start without a permit or notification, the bank's release for that stage can wait.
What are the common misconceptions?
- The bank pays the full loan at signing. For a staged drawdown it does not.
- The stages follow the statute. They follow the loan contract.
- The builder is paid when the invoice is issued. Payment usually follows the bank's acceptance of the stage.
Frequently asked questions
- Is a construction loan paid out in one sum?
- No. When the loan funds building, it is usually paid in tranches tied to stages, and the loan contract sets the conditions for each release.
- Who sets the stages for a staged drawdown?
- The loan contract does. Act 90/2016 Z. z. requires the contract to state the conditions that govern how the loan is drawn, and the stages belong in those conditions.
- When does interest start on a staged loan?
- The loan contract states the interest rate and the conditions that apply to it (§ 13 ods. 4 písm. j)). The act does not set a drawdown schedule, so ask the bank how it charges interest on the part already drawn.
- How long can repayment be deferred while building?
- The act exempts a deferral of repayment for building a residential property from its gradual-repayment rule. The deferral may not run longer than 18 months from the first drawdown (§ 8 ods. 33 a 34 písm. e)).
- Does the Building Act decide when the bank pays?
- No. Act 25/2025 Z. z. governs permits and the works. The timing of each payment comes from the loan contract.
- What does the bank check before releasing a tranche?
- The bank sets the evidence and the contract should state it. In general practice that includes a stage report, invoices and an inspection.
Sources
- Zákon č. 90/2016 Z. z. o úveroch na bývanie · Národná rada Slovenskej republiky, Slov-Lex · § 1 ods. 2 písm. b), § 8 ods. 33 a 34 písm. e), § 13 ods. 4 písm. f), i) a j)
- Úver na bývanie (home loan product information) · Národná banka Slovenska
- Zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · § 66, § 84 ods. 11, repeal of Act 201/2022