Ceiling boarding
Ceiling boarding is the layer of timber boards laid on or between the beams of an old timber ceiling, which carries the backfill.
Ceiling boarding is the layer of timber boards or planks that lies on or between the beams of an old timber beam ceiling and carries the backfill.
The Slovak term is záklop. The sources used here are the Monuments Board (Pamiatkový úrad SR) methodology annexes. They are written for monuments. For an ordinary house they are technical guidance, not a legal rule. The beams below the boarding are described under floor joists. The layer above is the ceiling backfill.
What does ceiling boarding carry, and what carries it?
The methodology on timber structures lists the parts of a historic timber ceiling in order. Each part carries the next one.
| Part | What it carries |
|---|---|
| Ceiling beams | The boarding |
| Boarding (záklop) | The fill. Visible boarding may be sawn or painted |
| Sleepers (polštáře) laid in the fill | The rough floor |
| Rough floor and finished floor | The walking surface |
| Reed battens (rákosníky) | The plastered soffit |
The boarding is not the main load-bearing member. The ceiling methodology names a boarding plank as an example of a non-load-bearing part and a beam end as a load-bearing part. The beams carry the load over the span.
How thick are the boards, and how are they laid?
The Monuments Board says that beams in ceilings of the 18th to the 20th century lie 0.9 to 1.2 m apart and carry boarding of planks 40 to 60 mm thick. In residential buildings these sizes suit load capacity and deflection for ceilings with visible boarding, with a plastered soffit on beams or on reed battens, with fill and the usual floor build-up. A second methodology gives 30 to 120 cm as the most frequent beam spacing in monuments in general.
The ceiling methodology says that the boards lie across the beams or along them. They are joined in several ways. Boards may have a tongue and groove, or lie edge to edge under a profiled timber strip. Cover strips may hide the joint lines. Beams and boards often have chamfered edges as decoration.
Where do the boards sit in relation to the beams?
The Monuments Board says that the fill was laid on boarding that lay on the top face of the beams. Boarding ceilings with visible boarding had it inserted, lapped or battened.
| Form | What the source says |
|---|---|
| Inserted (zapustený) | The boards sit between the beams. In the 19th century, in ceilings with a plastered soffit, they lay on laths nailed to the sides of the beams. The layer of fill above the top of the beam gave impact sound insulation |
| Lapped (prekladaný) | Named as a form of visible boarding. The source gives no further detail |
| Battened (lištovaný) | Named as a form of visible boarding. Cover strips hide the joint lines |
The same methodology says that in old buildings the tie beams of the roof frame were often at the same time the visible beams of a boarded ceiling, so sawn or painted beams may hide behind a later soffit. A survey should record the form and the condition of the boarding in each bay.
What damages boarding?
Moisture does. The timber protection annex gives the usual moisture of timber in roofed spaces as 10 to 16 %. It reaches a critical 18 to 20 % in unventilated spaces or where the use is damp. Below 20 % moisture, wood-destroying fungi do not grow. In general terms, fungi need organic material, suitably mild temperatures, moisture and air (USDA Forest Products Laboratory). Wood is elastic and changes volume as its moisture changes, according to the methodology on plasters. Boards can therefore shrink and open gaps.
The annex lists the sources of moisture: a damaged roof covering, faults in flashings, gutters that overflow, and fills and clay screeds that are soaked. The Monuments Board says that timber attacked by dry rot must be removed or replaced, and the outbreak found. Wood-boring insects need wood with enough moisture. The methodology on historic structures gives more than 18 %.
Can damaged boards be replaced on their own?
Often, in part. The ceiling methodology prefers local replacement of the damaged part of a member to replacement of the whole member. It gives a boarding plank as an example of a part that is not load-bearing. An expert locates the damaged part and decides if the damage is biotic or not. The best replacement is made of the same wood species as the original ceiling. Beam ends are different. Their replacement needs a design and supervision by a structural engineer (see beam end repair).
Solid timber boarding has one more advantage in monuments. The annex on timber structures says that fire resistance of ceilings is better met with solid timber boarding of planks than with the usual fibre-cement board. It adds that wood-based boards, plasterboard and fibre-cement board can form a vapour barrier, and that a timber ceiling build-up must not contain one.
What should be checked on an existing boarded ceiling?
The methodology requires a detailed survey before any intervention in a ceiling of a protected building. Probes during the design show the build-up and the condition of the ceiling. An area survey during construction fixes the scope of work. Check these points on the boarding:
- the ends of the boards at the walls and over the beams, where moisture can collect,
- signs of insects,
- signs of dry rot and whether the moisture source is fixed,
- gaps between boards, and whether the fill has moved into them,
- boards that were replaced with another material, which changes the weight and the moisture behaviour of the layer.
Judge the boarding together with the beams and the ceiling below it. A reed ceiling is a plastered soffit under the beams, so its state says little about the boarding above.
Frequently asked questions
- What is the difference between ceiling boarding and a floor joist?
- The beam carries the load over the span. The boarding lies on the beams and carries the backfill. The Monuments Board lists them as separate parts: the beams carry the boarding, the boarding carries the fill.
- How thick is the boarding in an old timber ceiling?
- The Monuments Board gives planks 40 to 60 mm thick, on beams 0.9 to 1.2 m apart, for ceilings of the 18th to the 20th century. These sizes suit load capacity and deflection in residential buildings for the usual build-ups.
- Can the boarding be replaced without replacing the beams?
- Often in part. The Monuments Board prefers to replace only the damaged part of a member, and names a boarding plank as a non-load-bearing part. Check the beam ends first, because the repair of load-bearing members needs a design.
- Why do old boards sometimes have gaps?
- Wood changes volume as its moisture changes, according to the Monuments Board methodology on plasters. Boards can therefore shrink and open gaps. Gaps let fill fall through, so record them in a survey.
- What damages ceiling boarding most?
- Moisture. Typical timber moisture in roofed spaces is 10 to 16 %, and it can reach 18 to 20 % in unventilated spaces. Roof leaks, overflowing gutters and soaked fills are the sources the Monuments Board lists.
Sources
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 6: Dřevěné konstrukce (Czech text) · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 3.1 Stropní trámy; 3.3 Průzkum stropů; 3.4 Posuzování a oprava stropů; 3.5 Tepelné, zvukové a protipožární izolace stropů
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 8, Stavebná časť, stavebné prvky: Podlahy, stropy, schodiská, časť Stropy · Pamiatkový úrad Slovenskej republiky (Plán obnovy a odolnosti SR, Komponent 2) · 3.1.2 Trámové stropy; 8.2.3 Výmena časti/doplnenie poškodeného prvku
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 3: Ochrana dřeva (Czech text) · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 1 Ochrana dřeva proti vlhkosti; 2.6 Likvidace napadení dřeva
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11, Statika, technické normy a sanácie, Príloha č. 8: Historická stavba a její nosné konstrukce (Czech text) · Pamiatkový úrad Slovenskej republiky (author Jan Vinař) · 9.1 Působení vnějších činitelů
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 8: Stavebná časť, stavebné prvky, Omietky a fasádne farby (author Pavel Fabian) · Pamiatkový úrad Slovenskej republiky (Plán obnovy a odolnosti SR, Komponent 2) · Plaster support (podklad omietky)
- Wood Handbook: Wood as an Engineering Material, Chapter 14: Biodeterioration of Wood (FPL-GTR-282) · USDA Forest Service, Forest Products Laboratory (Treesearch) · Abstract