Right-of-Way Easement

A right-of-way easement is an easement that lets the entitled person or owner pass over another person's land, usually to reach a building.

What is a right-of-way easement (vecné bremeno práva prechodu)?

A right-of-way easement is an easement whose content is a right to pass over the land of another owner. It is not a separate legal type in the Civil Code. Section 151n ods. 1 defines the general easement. The owner must tolerate, refrain from or do something, and the contract or decision says the burden is passage. Slovak practice also uses the wording "chôdza a jazda" (on foot and by vehicle). The act does not name it, so the contract text decides what is allowed.

The only provision that names a right of way in the Civil Code is § 151o ods. 3, which uses the words "právo cesty" (right of way) for a court-created easement.

How is a right-of-way easement created?

There are three routes:

  • A written contract. Under § 151o ods. 1 and 2, the owner of the real estate creates the easement by contract. The right begins with an entry in the cadastre (vklad).
  • A court decision under § 151o ods. 3 when the conditions below are met.
  • Exercise of the right over time (vydržanie), under § 151o ods. 1 with the rules of § 134 by analogy.

The cadastre office decides on a vklad proposal within 30 days of receiving it (zákon č. 162/1995 Z. z., § 32 ods. 1). If the passage covers only part of a parcel, attach a cadastral survey plan (geometrický plán). The plan is also the graphic depiction of an easement over part of a parcel (decree 461/2009 Z. z., § 3). See cadastral survey plan. A separate act sets the fee, and this page does not quote it.

When can a court establish a right of way?

A court can establish a right of way if the owner of a building asks for it and two conditions are met (§ 151o ods. 3):

  • the owner of the building does not also own the adjacent land
  • the owner's access to the building cannot be secured in another way

The court then creates an easement for the building owner. It consists of the right of way over the adjacent land. The wording names the owner of a building, so an owner of vacant land does not fit it. The paragraph says nothing about compensation, so any compensation question needs separate advice.

A second court route applies in a narrow case. Someone may build on another's land without the right. The court can then arrange the relations between the parties. It can create, for compensation, the easement needed to exercise ownership of the building (§ 135c ods. 3).

Can an owner refuse a right-of-way easement?

An owner can refuse to sign a contract, because a contract needs the owner's agreement (§ 151o ods. 2). An owner cannot stop a court from acting if the conditions of § 151o ods. 3 are met. A court judgment is a decision of the competent authority, and it is a valid basis for an easement (§ 151o ods. 1).

Does a right-of-way easement need to be in the registry?

Yes. The Civil Code requires an entry in the cadastre to acquire the right (§ 151o ods. 1). The land registry extract shows it in part C, "ťarcha", with the content and the entitled person (zákon č. 162/1995 Z. z., § 8). When a right of way passes over part of a parcel, the map shows the extent without creating a new parcel (decree 461/2009 Z. z., § 23 ods. 3).

Who maintains the path?

Unless the parties agree otherwise, the person who uses the path under the easement bears a reasonable share of the cost of keeping and repairing it. If the owner also uses the path, the owner pays in proportion to that use (§ 151n ods. 3). Write the split into the contract.

When does a right-of-way easement end?

A right-of-way easement ends in the ways § 151p lists:

  • by an authority decision or by an act (ods. 1)
  • by contract, with an entry in the cadastre (ods. 1)
  • when permanent changes mean the path can no longer serve the entitled person's needs (ods. 2)
  • by court restriction or cancellation for reasonable compensation, if a gross imbalance arises between the burden and the benefit (ods. 3)
  • at the latest when the entitled person dies or ceases to exist, if the right belongs to a person (ods. 4)

A temporary inability to use the path does not end the easement (ods. 2). A property-linked right of way passes with the ownership of the real estate (§ 151n ods. 2). It does not end when either real estate is sold.

How does a right of way help a building project?

A plot with no direct access from a public road can depend on a right of way. The Building Act 25/2025 Z. z. counts a right from an easement linked to a plot or building as one of the builder's rights to the land (§ 29 ods. 1 písm. b). Read the exact width and use in the contract and check it against the design of the building plot.

How is a right of way different from a utility easement?

A right of way allows passage. A utility easement allows pipes or lines, and some arise directly from an act: see the energy act 251/2012 Z. z. § 11 ods. 8 and the water act 442/2002 Z. z. § 20 ods. 4. A utility easement is not a utility protection zone, which is an area set by an act or a decision. It also differs from utility connections, which are the physical links of a building to networks.

Frequently asked questions

What is a right-of-way easement (věcné břemeno chůze a jízdy)?
A right-of-way easement is an easement whose content is passage over another owner's land. The Civil Code defines only the general easement (§ 151n ods. 1), so the contract or decision says whether passage is on foot, by vehicle or both.
How do I establish a right of way over a neighbour's land?
Agree it in a written contract and enter it in the cadastre (Civil Code § 151o ods. 1 and 2). If the neighbour does not agree, the owner of a building can ask a court for a right of way when access to the building cannot be secured another way (§ 151o ods. 3).
Who can ask a court for a right of way?
The owner of a building who does not own the adjacent land and cannot secure access to the building in another way (§ 151o ods. 3). The paragraph names the owner of a building, not the owner of vacant land.
Is a right-of-way easement entered in the cadastre?
Yes. The right is acquired by an entry in the cadastre (§ 151o ods. 1), and the list of ownership shows it in part C (Cadastral Act § 8). The cadastre office decides on the vklad proposal within 30 days (§ 32 ods. 1).
When does a right of way end?
It ends by an authority decision, by an act, by contract with an entry in the cadastre, when permanent changes mean it can no longer serve the entitled person, or by court cancellation for compensation in a case of gross imbalance (§ 151p). A personal right ends at the latest at the death of the entitled person.
Who pays for the upkeep of the path?
Unless the parties agree otherwise, the entitled person bears a reasonable share of the cost of keeping and repairing it, and the owner pays in proportion if the owner also uses it (§ 151n ods. 3).

Sources

  1. Zákon č. 40/1964 Zb. Občiansky zákonník · Národná rada SR, Slov-Lex · § 151n, § 151o, § 151p, § 134, § 135c ods. 3
  2. Zákon č. 162/1995 Z. z. o katastri nehnuteľností a o zápise vlastníckych a iných práv k nehnuteľnostiam (katastrálny zákon) · Národná rada SR, Slov-Lex · § 8, § 32 ods. 1
  3. Vyhláška č. 461/2009 Z. z., ktorou sa vykonáva zákon č. 162/1995 Z. z. o katastri nehnuteľností · Úrad geodézie, kartografie a katastra SR, Slov-Lex · § 3, § 23 ods. 3
  4. Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov · Národná rada SR, Slov-Lex · § 11 ods. 8
  5. Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách · Národná rada SR, Slov-Lex · § 20 ods. 4
  6. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada SR, Slov-Lex · § 29 ods. 1 písm. b