Drain water heat recovery
A drain water heat recovery unit is a heat exchanger on a shower drain that preheats cold water with the heat of outgoing waste water.
What is drain water heat recovery?
A drain water heat recovery unit is a heat exchanger fitted to a waste pipe, usually the drain under a shower. The warm water going down the drain heats the cold water coming up the supply. The Passive House Database defines the category in one sentence: "Drain water heat recovery systems use the heat of outgoing wastewater to preheat incoming freshwater."
The unit does not store or heat water itself. It warms the cold supply before the water reaches the water heater or the shower mixer, so the heater has less to do.
How does a drain water heat exchanger move heat from the drain to the supply?
The most common design is the vertical gravity-film unit. Wastewater falls down a copper section of pipe and forms a thin film on the inner wall. Green Building Advisor describes a coil of smaller copper supply pipe wrapped tightly around that section. Heat passes through the copper from the drain water to the cold supply water. In the units the article describes, one copper pipe of about 12 mm is coiled around a drain pipe of 50 or 75 mm.
Horizontal designs replace a short horizontal section of the drain. A second Green Building Advisor article describes one horizontal product. It replaces a 50 mm PVC drain section and works on a nearly level waste line. According to its author, a steeper pitch increases recovery because the wastewater moves faster.
The supply side matters too. The same article describes two layouts. In one, the preheated water feeds only the cold side of the shower. In the other, it feeds both the shower and the cold inlet of the water heater. The author states that the equal-flow layout harvests the most heat. The installer should check which layout is planned before the bathroom is closed.
Is a vertical or a horizontal unit better?
A laboratory study from Oak Ridge National Laboratory (Energy and Buildings, 2025) tested both layouts. Under similar operating conditions, the vertical gravity-film exchanger gave higher heat transfer effectiveness than the horizontal one. At low flow rates the vertical exchanger is only partly wetted, and its effectiveness falls. The authors propose two distributor designs to improve this case.
The result does not make a horizontal unit a poor choice. Where a bathroom has no vertical drop, a horizontal unit may be the only option. A peer-reviewed test of a compact horizontal unit, described below, found it useful, especially with an electric water heater.
Where does a drain water heat recovery unit fit in a family house?
The easiest position is directly under the shower, close to the water heater. The drain run is vertical or can be laid at a fall. Short supply pipework between the unit and the heater keeps the preheated water from cooling on its way. Green Building Advisor says it helps if the water heater is in a basement or close to the showers.
- Upper-floor shower above the water heater: a vertical unit is the simplest fit, because the drain already runs down.
- Ground floor on a concrete slab: Green Building Advisor notes that vertical units need a vertical drain run. They do not capture heat from a first-floor shower in a slab-on-grade house.
- Horizontal units: these suit a drain that runs horizontally through a screed or a suspended floor. Check the pitch that the data sheet requires.
- Level-access showers: the drain is often a linear channel, as described in shower channel drain. The study below measured a linear unit at no more than 23.03 percent efficiency. Whether a heat exchanger fits your channel depends on its outlet route, so check with the supplier.
A shower that receives preheated cold water needs a steady outlet temperature. Consider a thermostatic mixing valve at the shower, so that the warmer supply does not change the temperature the user feels. Heat is recovered only while warm water leaves and cold water enters at the same time, so the unit suits a household that showers often.
How is drain water heat recovery different from heat recovery ventilation?
The two share a name, not a principle. Heat recovery ventilation moves heat between extracted indoor air and incoming fresh air inside a ventilation system with fans and ducts. Drain water heat recovery moves heat from waste water into cold supply water inside a pipe. A house can have one, both or neither.
| Feature | Drain water heat recovery | Heat recovery ventilation |
|---|---|---|
| Heat source | Warm waste water from showers | Extracted indoor air |
| Heat is passed to | Incoming cold water | Incoming fresh air |
| Construction | A drain pipe with a copper supply coil, or a horizontal exchanger | Ducts and a central unit with fans |
| Works when | Warm drain water and cold supply water flow at the same time | The ventilation system runs |
| Installed in | The drain pipe under the shower | Ducts and a central unit |
How much energy can it save, and what limits the figure?
Measured values are modest and depend on the unit. Kordana-Obuch and Starzec (Energies, 2022) tested a compact horizontal exchanger below a shower tray. Its efficiency ranged from 22.43 to 31.82 percent, depending on the cold water temperature and the flow rates. A linear drain unit reached no more than 23.03 percent in the same study. The authors found the investment most beneficial where an electric water heater heats the water.
These figures come from one laboratory test. A vertical gravity-film unit may reach other values, and the Oak Ridge study shows that the layout changes the result. The Passive House Database shows how to compare units. It lists efficiency classes phA+, phA, phB and phC, and the performance fields nominal efficiency, dead time, flow rate and pressure loss. Ask the supplier for tested data at the flow rate and pipe size you will use. Do not rely on one headline percentage.
The saving in a real house is lower than any single efficiency figure suggests, because it depends on how the house is used and built:
| Factor | Effect on recovered heat |
|---|---|
| Number and length of showers | More and longer showers mean more warm drain water to recover |
| Cold supply temperature | The Kordana-Obuch study found efficiency changes with the cold water temperature |
| Flow rate through the unit | Both studies found that flow affects the result, so compare data sheets at the same flow |
| Drain orientation and pitch | Vertical units need a vertical run. A steeper pitch helps a horizontal unit |
| Supply connection | Cold side only, or both sides. The author of one trade article says equal flow harvests the most heat |
| Type of water heater | The investment pays off best with an electric water heater |
This page gives no price or payback. The trade articles quote prices and payback periods for US conditions with US energy prices, and none of them is a Slovak or European figure.
What are the honest limits of drain water heat recovery?
- It recovers heat only while warm water drains and cold water flows at the same time, so it suits showers better than other uses.
- A vertical unit needs a vertical drain run, and a horizontal unit needs its pitch. Fitting one into an existing bathroom can be difficult or impossible.
- It reduces the energy the water heater needs for the water already used. It does not reduce how much hot water the household uses, and it does not replace good pipe insulation or a correctly sized water heater.
- One trade article author says that recovering drain water heat stretches the storage capacity of a water heater. Check the effect with the designer of the hot water system.
- This page found no Slovak rule written for these units. Ask the installer whether the drain and water supply of your building allow the unit before you buy.
Drain water heat recovery is a modest, passive measure. It fits best where the shower is close to the water heater, the drain can be vertical or pitched, and the household showers regularly. The main hot water system, described in domestic hot water preparation, and the choice of heat pump water heater decide most of the energy bill. The drain unit only trims it.
Frequently asked questions
- Does drain water heat recovery need electricity?
- The gravity-film design in the sources is a drain pipe with a copper supply coil around it. It has no pump or fan, so it needs no power. The unit only transfers heat between water that already flows through the building.
- Is drain water heat recovery the same as heat recovery ventilation?
- No. It recovers heat from waste water in a drain pipe. Heat recovery ventilation recovers heat from extracted air in a ventilation system with fans and ducts.
- Is a vertical or a horizontal unit better?
- A 2025 laboratory study by Oak Ridge National Laboratory found higher heat transfer effectiveness for the vertical gravity-film exchanger under similar conditions. At low flow rates a vertical unit is only partly wetted and loses effectiveness. A horizontal unit suits a drain with no vertical drop.
- Can I fit one to an existing shower?
- Sometimes. A vertical unit needs a vertical drain run, and a horizontal unit needs the pitch its data sheet gives. You also need access under the floor. Ask an installer to check the drain route before ordering.
- What efficiency should I expect?
- A peer-reviewed laboratory test (Kordana-Obuch and Starzec, 2022) measured 22.43 to 31.82 percent for a compact horizontal unit. A linear unit reached at most 23.03 percent. Other designs differ, so ask the supplier for tested data at your flow rate and pipe size.
- Does it change the shower temperature?
- It warms the cold supply, so the outlet temperature can move as water use changes. Consider a thermostatic mixing valve at the shower to keep the temperature steady.
Sources
- Passive House Database: heat recovery components (drain water heat recovery category) · Passive House Institute (database.passivehouse.com) · Component list, drain water heat recovery filter
- Drainline Heat Exchangers · Green Building Advisor · Article and reader comments
- Drainwater Heat Recovery Comes of Age · Green Building Advisor · Article and reader comments
- Experimental investigation on heat transfer performance of drain water heat recovery heat exchangers · Oak Ridge National Laboratory; Energy and Buildings vol. 346 (2025) · Abstract
- Horizontal Shower Heat Exchanger as an Effective Domestic Hot Water Heating Alternative · Kordana-Obuch S., Starzec M., Energies 15(13), 4829 (2022), via RePEc/IDEAS · Abstract