Basement light well
A basement light well is a sunken shaft in front of a basement window that lets daylight into a room below ground level.
What is a basement light well?
A basement light well is a sunken shaft in front of a basement window. It lets daylight reach a room below ground level. MEA, a manufacturer, says its light wells channel daylight into the basement. It offers wells in two materials: glass-fibre reinforced plastic (GRP) and concrete. The wells come as ready-made shells or as made-to-measure concrete solutions (MEA brochure, undated, file metadata 2014).
Anglický dvorček is the Slovak name used on this site. For the sheet material that waterproofs the wall behind the well, see waterproofing membrane.
Why does a basement room need a light well?
Decree 259/2008 of the Slovak Ministry of Health sets rules for the indoor environment of buildings. Under § 4 ods. 3, indoor spaces where people stay for a long time must have satisfactory daylight. The requirements are in Annex 3, which this page did not read. Combined lighting is a mix of daylight and artificial light. It may be used only exceptionally. The designer must show that daylight cannot be provided for technical reasons (§ 4 ods. 8 and 9).
A window below ground needs open space in front of it to receive daylight. A light well provides that space. The decree does not name light wells. Whether a basement room is a space for long-term stay is a design decision.
How does a light well meet the wall and the water?
The German standard DIN 18533-1 covers waterproofing of elements in contact with soil. Its scope names protection against soil moisture, non-pressing water and externally pressing water. The 2026-06 edition replaces the 2017 edition and its 2018 amendment. The text is paid, so this page cannot say how the standard treats a light well. For the case of water pressing on a structure, see pressure water waterproofing.
MEA describes a watertight version of its plastic wells, called AQUA. The brochure states these points for the junction with the concrete wall:
- A fixing set with a special adhesive and sealing agent bonds the well to the concrete wall.
- The well is fixed through four holes in the bond.
- The installation is watertight up to the height of the ground element.
- The well comes with a closed floor, or with a drainage opening to connect to the wastewater system.
MEA also says its GRP wells can be installed directly on the concrete wall or with insulation in front of it. These are statements about one manufacturer's system. They are not a rule for every light well.
Which product values does a manufacturer state?
Manufacturer data sheets state values such as depth and load. They describe one product only and do not replace the design. The table shows values from the MEA brochure.
| Product in the brochure | Stated value or feature |
|---|---|
| MEA MULTINORM light well | Available in depths of 40 cm, 60 cm and 70 cm, and as a large light well |
| MEA MULTINORM with suitable grating | Withstands up to 900 kg wheel load |
| MEAMAX light well | Height adjustable by up to 25 cm with an integrated extension, and suitable for pedestrian or light vehicle traffic |
| MEA ventilation shaft | Available in size 42 cm by 42 cm by 325 cm, with up to seven shafts stacked on each other |
| MEA MULTINORM AQUA light well | Available with a closed floor or with a drainage opening to connect to the wastewater system |
What do concrete light wells and covers add?
MEA says concrete light wells suit tough building site conditions and heavy traffic. Its MEAVECTOR range uses reinforced concrete at least 8 cm thick. MEA recommends the MEAVECTOR AQUA and AQUA PLUS models where there is a risk of flooding or pressurised water, and it describes them as watertight. The table shows further values from the brochure.
| Item in the brochure | Stated value or feature |
|---|---|
| MEAVECTOR concrete well | C30/37 concrete, six standard widths up to 252 cm, eight standard heights up to 200 cm, depths of 50, 60, 80 and 100 cm |
| MEAVECTOR Individual | Made-to-measure wells, widths up to 350 cm |
| Gratings | Galvanised steel, for walk-on, light and heavy vehicle traffic |
| MEACOVER | Aluminium cover with a UV-resistant polycarbonate insert and a ventilation grating |
| MEATOP | Stainless steel protective grating for wells up to 115 by 60 cm |
| MEAVECTOR pumping sump shaft | Prefabricated concrete component with an integrated submersible pump that conveys basement wastewater into the wastewater pipe |
MEA states that its gratings and covers keep out dirt, fallen leaves and small animals and let fresh air flow into the basement.
How does a light well differ from a ventilation shaft?
MEA makes ventilation shafts of GRP for basement rooms such as a laundry or a boiler room. It names them as the solution where daylight is not the main issue. A light well brings daylight to a window. A ventilation shaft is sold for air. For water around the building, see perimeter drainage system.
What should be specified for a light well?
The brochure lists the choices that a project must settle. They come from one manufacturer's range, so check them against the product in the design.
- The material, GRP or concrete.
- The depth and the size of the well.
- The grating and its load, because MEA states a wheel load only for a well with a suitable grating.
- A closed floor or a drainage opening, and where a drainage opening discharges.
- Installation directly on the concrete wall or with insulation in front of it.
Frequently asked questions
- What does anglický dvorček mean?
- Anglický dvorček is the Slovak name used on this site for a basement light well. It is a sunken shaft in front of a basement window. The shaft lets daylight reach a room below ground level.
- Does a basement light well need a drain?
- MEA sells wells with a closed floor and wells with a drainage opening that connects to the wastewater system. The designer decides which one fits the project. A well with a drainage opening needs a connection that leads somewhere.
- Can a light well be installed in front of insulation?
- MEA says its GRP wells can be installed directly on the concrete wall or with insulation in front of it. Its MEAFIX insulation panel is one way to do this. The statement applies to MEA products only.
- What load can a light well grating carry?
- MEA states that its MULTINORM well withstands up to 900 kg wheel load when equipped with a suitable grating. It describes MEAMAX as suitable for pedestrian or light vehicle traffic. Other products differ, so use the data sheet of the product in the design.
- Does a basement room need daylight?
- Decree 259/2008 § 4 ods. 3 requires satisfactory daylight in indoor spaces where people stay for a long time. Combined lighting is allowed only exceptionally, when daylight cannot be provided for technical reasons (§ 4 ods. 8 and 9).
- Which standard covers waterproofing next to soil?
- The German standard DIN 18533-1, edition June 2026, covers waterproofing of elements in contact with soil. It is a German standard and the text is paid. This page did not read it, so it does not state any clause.
Sources
- Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 259/2008 Z. z. o podrobnostiach o požiadavkách na vnútorné prostredie budov a o minimálnych požiadavkách na byty nižšieho štandardu a na ubytovacie zariadenia · Slov-Lex (Zbierka zákonov SR) · § 4 ods. 3, 8 a 9
- Abdichtung von erdberührten Bauteilen - Teil 1: Anforderungen, Planungs- und Ausführungsgrundsätze (Waterproofing of elements in contact with soil - Part 1: Requirements and principles for design and execution), edition 2026-06 · DIN Media (Deutsches Institut für Normung) · Anwendungsbereich (scope), Ersatzvermerk (replacement note)
- Bright solutions: light well systems from MEA (product brochure, undated; file metadata 2014) · MEA (manufacturer of GRP and concrete light wells) · Pages 3 to 17 (product overview, MULTINORM and MEAMAX, ventilation shafts, AQUA variants, MEAFIX, MEAVECTOR concrete wells, accessories)