Sandwich panel
Factory-made panel with steel faces bonded to a mineral wool or foam core, used mainly for halls, workshops and cladding, not timber house structure.
What is a sandwich panel (sendvičový panel) and how is it made?
A sandwich panel is a factory-made composite of two thin outer skins, usually profiled steel sheet, bonded to a central insulation core. The core is most often mineral wool, polyisocyanurate (PIR) foam, or polyurethane (PUR) foam. It is glued to both faces under pressure, so the three layers act as one element that arrives on site in finished lengths.
On site the panel is fixed to steel rails or timber battens with screws or clips, and its interlocking edge profiles form the joints. The panel is the envelope itself, with no separate insulation layer added afterwards.
How does a sandwich panel differ from a structural insulated panel?
Both are factory-made and insulated, but the material and the job differ. A structural insulated panel (SIP) is a timber-building product with oriented strand board (OSB) or plywood faces, and it forms the load-bearing walls and roofs of a house. A sandwich panel has steel faces. It usually spans between the rails or purlins of a separate steel frame, so in most designs it works as cladding or roof covering rather than as the structure of the house.
| Feature | Sandwich panel | SIP |
|---|---|---|
| Faces | Steel sheet, usually profiled | OSB or plywood |
| Core | Mineral wool, PIR or PUR foam | EPS, XPS or PUR foam |
| Typical use | Halls, workshops, cladding, roofs | Load-bearing walls and roofs of houses |
| Structural role | Spans between a separate frame, usually cladding | Frame, insulation and sheathing in one |
| Fire behaviour | Set by the core and the full build-up | Set by the foam type and facing |
What are the main core types, and how do they behave in a fire?
The core decides most of the fire behaviour. Mineral wool is non-combustible, so panels with a mineral wool core are the usual choice where požiarna odolnosť (fire resistance) is required, such as separating walls. PIR, PUR and EPS cores are combustible. They can give good insulation in a thin profile, but they burn and release smoke, and metal faces do not make a foam core safe on their own.
Fire performance belongs to the whole build-up, not to the product name. Ask the supplier for test documentation covering the exact combination of core, thickness, facings and joints, and check it against the fire requirements the fire authority sets for your project. Never assume a panel is fire-rated because its faces are metal.
| Core | Fire behaviour | Insulation per thickness | Typical use |
|---|---|---|---|
| Mineral wool | Non-combustible core | Moderate | Fire-separating walls, halls with fire demands |
| PIR or PUR foam | Combustible, needs a verified build-up | High | Cold stores, roofs where the profile is limited |
| EPS | Combustible, needs a verified build-up | Moderate | Light cladding and lower-demand halls |
How do joints and airtightness work in sandwich panel buildings?
Joints are where many sandwich panel buildings leak. Panels connect through interlocking side profiles, and each seam is closed with a gasket, sealant or foam tape. A well-sealed face is not enough if the joints, the perimeter at the top and bottom rails, or the openings around doors and roller shutters are left open. Airtightness is a question of detailing and site execution, so the joint system, the perimeter closures and every penetration for ducts, pipes and downpipes must be specified and checked.
If the building has a low air-leakage target, plan a pressure test (blower-door test) on completion and treat the result as a measurement, not a guarantee. The panel system gives a good starting point for airtightness, but the final result depends on the crew that closes each joint.
Where do condensation and thermal bridges form at the fixings?
Metal faces conduct heat well, and every fixing that passes through the outer skin, whether a screw, clip or bracket, creates a point thermal bridge through the insulation. In cold weather the inner face at each fixing runs colder than the panel around it, so condensation forms there, with staining, mould or drips as the result. Steel rails and purlins that cross the insulation layer create a linear thermal bridge in the same way.
| Location | Risk | Typical measure |
|---|---|---|
| Screw or clip through the outer skin | Point thermal bridge, condensation spot | Thermal spacers or breaks under fixings, fewer fixings where the design allows |
| Steel rail or purlin crossing the insulation | Linear thermal bridge | Thermal break strip, insulation kept continuous over the support |
| Window or door reveal | Cold edge, surface condensation | Insulated reveal with a continuous seal |
| Eaves and wall-roof junction | Thermal bridge and air leakage | Continuous insulation and a sealed closure profile |
Why do sandwich panels drum in the rain, and can it be reduced?
Thin metal faces act like a drum when rain hits them, especially on large roofs with light sheeting and no solid layer beneath. The sound is loudest where the building has little internal mass and no ceiling absorption. It does not mean the panel is failing, but it matters in a bedroom or living room under a metal roof.
The usual measures are a heavier sheet, a denser core, or a lining board fixed to the underside on battens.
Why does a sandwich panel look industrial on a family house, and how can it be clad?
Profiled steel with exposed ribs, visible fixings and a corrugated surface reads as hall architecture. Left bare, a metal wall on a house looks cold and utilitarian, and the module lines and joints draw the eye. The fix is to hide the panel behind a second layer, such as a ventilated facade in timber, fibre cement, brick slips or render on a carrier, or to choose flat-faced panels with concealed fixings in a restrained colour.
Cladding changes the building physics too. The air gap, the detail at openings and the moisture behaviour of the outer layer must be designed together with the panel, not added after the envelope is fixed.
What does "sandwich panel" mean in Slovak usage for a system house?
In Slovakia the term is sometimes used loosely for the whole wall of a system house, meaning the prefabricated wall package from the house manufacturer. That wall may be a timber frame with insulation, a panel with a different core, or a combination, so the word does not reveal the build-up. Two offers both labelled sandwich panel can differ in fire behaviour and joints, so ask for each layer, its core, its fixings and its test documentation.
When is a sandwich panel the right choice for a house?
| Use | Fit |
|---|---|
| Workshop, garage or hall | Strong fit, the product was made for this |
| Family house with a visible metal envelope | Possible, if clad and detailed for the climate |
| Passive-house envelope | Only with thermal breaks at fixings and tested joints |
| Load-bearing timber house | Usually better served by a SIP or timber frame |
Choose a sandwich panel when an industrial character suits the building, or when a contemporary design uses it as a deliberate, detailed element. Involve the supplier and the energy consultant early, because the panel alone does not deliver the performance of its joints and fixings.
Frequently asked questions
- What is a sandwich panel made of?
- A sandwich panel has two outer skins, usually profiled steel sheet, bonded to a core of mineral wool, PIR or PUR foam. The layers are glued under pressure in a factory and delivered as finished elements. The term describes the product, not the whole building system around it.
- Is a sandwich panel fire resistant?
- It depends on the core and the complete build-up. Mineral wool cores are non-combustible, while foam cores are combustible and need verified fire test documentation for the exact combination used. Metal faces alone do not make a panel fire resistant.
- Why does a sandwich panel make noise in the rain?
- Thin metal faces vibrate under rain, and the sound is loudest on large roofs with little mass or absorption below. A lining board, a heavier sheet, a denser core or a ceiling layer reduces it. Test the specific build-up if the room below is sensitive to noise.
- What is the difference between a sandwich panel and a SIP?
- A SIP is a timber panel with OSB or plywood faces that forms the load-bearing walls and roofs of a house. A sandwich panel has steel faces, usually spans between a separate steel frame, and is mostly used as cladding or roof covering in halls and workshops.
- Can a sandwich panel be used for a family house?
- Yes, if the facade is clad or the panels are chosen with flat faces and concealed fixings, and the fixings, joints and openings are detailed for the climate. Without cladding the result often reads as industrial. Coordinate the design with the energy consultant when a low-energy target applies.