Phase Change Material (PCM)
A material that stores and releases heat as it melts and solidifies, added to linings or screeds to give lightweight houses extra thermal mass.
What is a phase change material?
A phase change material (PCM) is a substance that stores and releases large amounts of heat as it changes between solid and liquid states, at a nearly constant temperature. In buildings, PCMs are built into wall linings, floor screeds or panels so that a lightweight structure gains some of the heat-storing capacity that a heavy masonry house has naturally. The most common building PCMs are paraffin waxes and salt hydrates, both chosen for melting temperatures close to the indoor comfort range.
The product category has grown alongside lightweight construction, where the house starts with less built-in mass. It sits next to thermal mass, the traditional way buildings buffer temperature swings, and the two are often confused. This article explains how PCMs work, where they fit in a timber house, and why they are a specialist option in Slovakia rather than a default one.
How does a PCM store heat?
Ordinary building materials store heat as sensible heat: their temperature rises as they absorb energy. The amount stored depends on the mass, the specific heat capacity of the material and the size of the temperature change. A PCM adds a second store. When it reaches its melting point it absorbs heat while staying at roughly the same temperature, because the energy goes into changing the structure of the material. This is called latent heat. When the room cools at night, the material solidifies again and releases that heat back into the room.
This is why a PCM can hold a large amount of heat within a narrow temperature band, far more than a plaster or timber panel of the same thickness. The catch is that the effect only works in the band where the material changes phase. Outside that band, the PCM behaves like an ordinary, fairly light material.
Where are PCMs placed in a timber house?
In a drevostavba (timber-frame house) the heavy layers that normally provide mass are missing, so PCM products are usually fitted to interior surfaces that already exist. The three common locations differ in how much surface they expose and how hard they are to add later.
| Location | Typical form | Advantage | Drawback |
|---|---|---|---|
| Plasterboard (sadrokartón) | Board with the PCM sealed in microcapsules or laminated in | Fits a normal dry-lining sequence and offers a large exposed area | Adds cost per square metre, and the boards need careful handling and fixing |
| Floor screed (poter) | Granules or pellets mixed into the screed | Heat reaches the material from the floor as well as from the room | Changes how the screed behaves, so it must be specified before pouring and is hard to change later |
| Glazing or shading elements | Panels or interlayers built into glass units | Can act on sunlight before it enters the room | Specialist product, usually more expensive and rarely used in housing |
Plasterboard is the most common route in lightweight houses because it is a familiar dry-lining product that fits into the normal building sequence. Screed and glazing options are used less often and need the designer and the supplier to agree the details before construction starts.
How is a PCM different from thermal mass?
Thermal mass is the general property of heavy materials such as concrete, brick and stone to absorb heat and release it slowly. A PCM is a specialised material that achieves a similar buffering effect with much less volume, but only near its melting point. The table shows the practical differences that matter when choosing between them.
| Property | Conventional thermal mass | Phase change material |
|---|---|---|
| How it stores heat | Sensible heat across the whole temperature range | Latent heat at a narrow, fixed melting point |
| Volume needed | Large, usually structural masonry or concrete | Small, as a board or screed layer |
| Behaviour across the year | Works in every season once the mass is in place | Works only when temperatures cross the melting point |
| Fit with a timber frame | Needs a separate heavy layer added to the frame | Can be added to the existing dry lining |
| Cost and supply in Slovakia | Mature, familiar supply chain | Niche product with higher cost and a smaller supply base |
A PCM does not replace thermal mass in a house that is already heavy. In a lightweight timber house it can add some of the buffering that is otherwise missing, but a well-shaded, night-ventilated house usually does more for summer comfort with simpler means.
Is a PCM worth it in Slovak housing?
For most Slovak houses, a PCM is not a first measure. It is a niche and costly option that is rarely specified in standard practice. Summer overheating, the problem a PCM is meant to address, is more pressing in lightweight construction with large glazing, and the cheapest and most reliable fixes are external shading, sensible window orientation and night-time ventilation. These measures work whatever the house is built from, and they stop heat before it enters the room rather than storing it afterwards.
A PCM makes more sense in a narrower set of cases:
- a lightweight house with large south or west glazing where exterior shading cannot be fitted, for example on a protected facade;
- a top-floor room or attic conversion where a dry-lining upgrade is already planned;
- a design where the overheating assessment shows that exterior measures alone are not enough.
Treat the PCM as one line item that needs a justification. Ask the supplier for the melting range, the behaviour over repeated cycles and the fire classification in writing before deciding.
What are the common misconceptions about PCMs?
The first misconception is that a PCM is an insulator. It is not. It stores heat rather than slowing its flow, so it does not replace a properly insulated envelope.
The second is that a PCM works on its own. It absorbs heat during the day and needs a cool period at night to solidify again. If the room stays warm overnight, the material never recharges and quickly stops helping. Night ventilation is therefore part of the design, not an optional extra.
The third is that a PCM removes the need for shading. Shading stops solar gains at the window, while a PCM only holds the heat that gets in. Once the storage is full, extra heat simply stays in the room. The two measures are complementary, not interchangeable, which is why the summer overheating risk should be assessed before any PCM is specified.
Frequently asked questions
- Does a PCM lower indoor temperature by itself?
- Not by itself. A PCM can reduce the peak indoor temperature on hot days when it is combined with solar shading and night ventilation, but it does not cool the air. Its effect depends on the melting range, the amount of material and how well the room cools overnight.
- What melting range do building PCMs usually have?
- Most building products are designed to melt in a band of roughly 20 to 30 °C, close to indoor comfort temperatures. The exact value differs by product, so take it from the manufacturer's data sheet rather than from a general figure.
- Can a PCM be added to an existing house?
- Sometimes. Plasterboard products can be used in a renovation where the wall or ceiling linings are being replaced anyway. Adding one to a finished interior on its own is rarely practical, and the structure and fixings should be checked first.
- Is a paraffin-based PCM safe to use in a home?
- Paraffin is combustible, so the product's fire classification and test documents matter as much as its thermal performance. Encapsulated products keep the material sealed in its casing. Check that the installer follows the supplier's fixing instructions.
- Is a PCM cheaper than adding more concrete or masonry?
- Usually not for the material itself. PCM products are a specialist, higher-cost option, while concrete and masonry mass is a mature, familiar supply. The real comparison depends on the house and on the quotes you receive.