Drywall metal framing

Drywall metal framing is the light galvanised steel substructure of UD, CD, UW and CW profiles that carries plasterboard in partitions and ceilings.

Drywall metal framing is the light galvanised steel substructure of UD, CD, UW and CW profiles that carries plasterboard in partitions and ceilings. The profiles are cold-formed steel. They set where the board fixings land and give the finished wall or ceiling its shape. The Rigips datasheets for its profiles name DX51D+Z steel with a Z100 zinc coating and a thickness of 0.6 mm.

Which profile families make up a drywall frame?

Metal framing for gypsum board comes in a small set of families. The letters tell the jobs apart. C-shaped profiles, CW and CD, are the members that carry the boards. U-shaped profiles, UW and UD, are the tracks and channels at the edges. W marks a wall profile and D marks a ceiling profile (Decke in the German Rigips datasheets). The Rigips environmental declaration lists UD, CD, UW and CW for ceilings, attics and partition walls.

ProfilePositionWeb and flangeSteel
UD 28Perimeter channel for the edge connection of a ceiling28 mm web, 27 mm flange0.6 mm
CD 60/27Ceiling channel that carries the boards60 mm web, 27 mm flange0.6 mm
UW 75Wall track75 mm web, 40 mm flange0.6 mm
CW 75Wall stud75 mm web, 50 mm flange0.6 mm
UA 75-2Reinforcing profile, for example at a door opening75 mm web, 40 mm flange2.0 mm

The values come from the Rigips datasheets named in the sources. Rigips also lists R-CW 100 and R-CW 150 studs in its catalogue, and other makers may use other flange sizes. MTC lists CD 60, UD 28, CW 50, CW 75 and CW 100 at 0.6 mm. It lists UA 50, UA 75 and UA 100 at 2.0 mm.

What do the numbers in a profile name mean?

The first number is the nominal web size in millimetres. CW 75 has a 75 mm web, and CD 60/27 has a 60 mm web and a 27 mm flange. The Rigips datasheets give a second code that follows EN 14195, for example C 50/75/50 for CW 75 and U 40/75/40 for UW 75. The last figure of the long name is the steel thickness, as in CW 75 x 50 x 0.6.

A designer picks the web size from the partition depth and from the height of the wall. The Rigips sheets give 4,000 mm for the standard profiles and refer to the supply programme for other lengths.

What does STN EN 14195 cover, and why should a specification cite it?

STN EN 14195 is the Slovak adoption of the European standard for metal framing components in gypsum board systems. The Slovak standards catalogue lists it as an identical adoption of EN 14195:2014. It was released on 1 June 2015, is valid and replaces the 2005 edition. Its Slovak title is Kovové profily pre podkladové konštrukcie sadrokartónových systémov. The title lists definitions, requirements and test methods.

The Rigips datasheets say their profiles follow EN 14195 and the German DIN 18182-1. A specification should name the standard and the profile family. It should also ask for the manufacturer's declaration of the profile, and not describe the profiles by how they look on site.

How far apart are the studs and the channels?

The spacing belongs to the tested system. It is not a general rule. The Rigips fire catalogue of February 2024 says that the spacings and heights printed in it are maximum values. It also says that the insulation thicknesses and the cavity heights are minimum values.

One example from the catalogue is a partition 100 mm thick. It has R-CW 75 studs at 625 mm and one Rigips RB (A) board of 12.5 mm on each side. Its fire resistance is EI 15. The catalogue gives a maximum wall height of 4,700 mm for category A and 3,700 mm for the categories B, C1 to C4 and D. The same catalogue lists other partitions with other boards and spacings. For a ceiling, the hanger spacing and the channel spacing also come from the system datasheet for the board type that you use.

DecisionWhat it controlsWhere the value comes from
Profile family and steel thicknessStiffness and the load of the frameThe manufacturer datasheet, for example 0.6 mm and 2.0 mm
Stud and channel spacingBoard stiffness and fixing densityThe tested system, as a maximum value
Hanger spacing in a ceilingThe load path of the ceiling gridThe system datasheet of the maker
Corrosion classSuitability for humid roomsRigips lists a UW 75 for classes C3 to C4 and a CW 75 for class C5, and MTC lists strips for C3 and C5

Which board types go on the frame?

The board follows the room and the fire requirement. The Rigips fire catalogue lists the boards for each fire-resistant assembly. One example is RF (DF) boards of 12.5 mm for a ceiling with a fire requirement. The board type must match the tested assembly. The article on gypsum plasterboard explains the board types.

How does drywall framing differ from structural steel framing?

Drywall metal framing is a substructure for boards. The Rigips datasheets describe the profiles as the basis for substructures in gypsum board systems. A lightweight steel framing system is a different thing. It is a structural building system in which the steel members carry the loads of the building. A drywall frame is fixed to the structure and does not replace it. A partition built with it is a non-load-bearing partition, and a ceiling built with it is a suspended ceiling.

How does the frame meet an access panel or a door?

The frame changes where an opening goes in. For a ceiling opening, the Rigips catalogue says the profiles are interrupted at the opening and trimmers are inserted into the structure. For a hatch in a partition or a ceiling, it asks for trimmers. The profile faces then stay at most 100 mm from the hatch frame. For a reinforced door opening, Rigips offers the UA 75-2 profile. The article on the ceiling access panel shows where hatches belong.

What should the site check cover?

  • The profiles on site match the specified family, web size and steel thickness.
  • The studs and channels are no farther apart than the tested system allows.
  • Trimmers are in place at every opening before the first board is fixed.
  • The corrosion class suits the room, for example a humid room.

Record any deviation before the first board goes on. After that the frame cannot be inspected without damage to the finish.

Frequently asked questions

What is the difference between CW, UW, CD and UD profiles?
CW and UW are wall profiles, and CD and UD are ceiling profiles. In the Rigips datasheets a CW 75 profile has a 75 mm web and 50 mm flanges. The UW 75 track has a 75 mm web and 40 mm flanges. CD 60/27 and UD 28 are the ceiling channel and the perimeter channel.
Which standard covers drywall metal profiles?
EN 14195 covers metal framing components for gypsum board systems. The Slovak catalogue lists STN EN 14195 as an identical adoption of EN 14195:2014, released on 1 June 2015 and valid. It replaces the 2005 edition and covers definitions, requirements and test methods.
What steel thickness do these profiles have?
The Rigips datasheets give 0.6 mm for CW 75, UW 75, CD 60/27 and UD 28. The reinforcing profile UA 75-2 is 2.0 mm thick. MTC lists thin-walled profiles at 0.6 mm and thick-walled UA profiles at 2.0 mm. Read the thickness of your product from its own datasheet.
What do the numbers in CW 75 or CD 60/27 mean?
The first number is the web size in millimetres. In Rigips datasheets CW 75 is 75 mm web by 50 mm flange by 0.6 mm steel. CD 60/27 is 60 mm web by 27 mm flange by 0.6 mm steel. Other makers may use a different flange, so read the datasheet.
How far apart are the studs in a plasterboard partition?
The system sets the spacing. The Rigips fire catalogue of February 2024 gives 625 mm for a partition with R-CW 75 studs and one 12.5 mm board per side. That partition is rated EI 15. It states that all spacings in the catalogue are maximum values.
Does a rigidized profile make a frame stronger?
MTC states that its rigidized profiles increase the strength of the plasterboard construction by up to 30%. That is a claim for one product line. Check it against the tested system before you rely on it in a design.

Sources

  1. STN EN 14195: Kovové profily pre podkladové konštrukcie sadrokartónových systémov. Definície, požiadavky, skúšobné metódy · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS) · Catalogue entry: title, level of adoption (idt EN 14195:2014), release date, status
  2. Produktdatenblatt RigiProfil MultiTec CW 75 (24.03.26) · Saint-Gobain Rigips GmbH · Technische Daten
  3. Produktdatenblatt Rigips Wandprofil UW 75 C3-hoch / C4-hoch (25.03.26) · Saint-Gobain Rigips GmbH · Technische Daten
  4. Produktdatenblatt RigiProfil MultiTec RiDuce CD 60/27 (22.09.26) · Saint-Gobain Rigips GmbH · Technische Daten
  5. Produktdatenblatt RigiProfil MultiTec UD 28 (29.09.22) · Saint-Gobain Rigips GmbH · Technische Daten
  6. Produktdatenblatt Rigips Aussteifungsprofil UA 75-2 (26.03.26) · Saint-Gobain Rigips GmbH · Technische Daten
  7. Katalog požárně odolných konstrukcí suché výstavby Rigips, únor 2024 · Saint-Gobain Construction Products CZ a.s., Rigips (catalogue PDF) · Introduction notes on maximum and minimum values, partition table with R-CW 75 at 625 mm
  8. Katalog požárně odolných konstrukcí suché výstavby Rigips, leden 2018 · Saint-Gobain Construction Products CZ a.s., Rigips (catalogue PDF) · Revizní otvory v podhledech (p. 81), Revizní dvířka v příčkách a podhledech (p. 84)
  9. EPD-IES-0015575:002, RIGIPS metal profiles Rigiprofil UD/CD/UW/CW and RIGIPS UW/CW · Saint-Gobain Construction Products Romania, Rigips Business Unit (EPD International programme) · Product description
  10. Steel plasterboard profiles (SDK profiles), METAL TRADE COMAX a. s., MTC Kolín, EPD 6072 · EPD International programme (environdec.com) · Product description