Constructivism

Constructivism is a Soviet avant-garde movement that treated making things as the technical organisation of materials, including in architecture.

What is constructivism in architecture?

Constructivism is a Soviet avant-garde movement that treated making things as the technical organisation of materials. It began in the visual arts in Russia. Its best-known building is the Narkomfin apartment house in Moscow, a house-commune for office staff. The movement overlaps in time with functionalism, but the two have different roots.

Where did constructivism come from?

Tate dates the start of the art movement to around 1915 and names Vladimir Tatlin and Alexander Rodchenko as its founders. Tatlin had seen Picasso's constructions in Paris in 1913. He then began making abstract works from industrial materials.

By 1921, Russian artists who followed Tatlin's ideas called themselves constructivists. The 1923 manifesto in the magazine Lef put the idea in one line:

Constructivism is a purely technical mastery and organisation of materials.

Tate adds that the manifesto compared works of art to industrial products such as a car or an aeroplane.

What is the Narkomfin building?

The Narkomfin building in Moscow is the best-known constructivist apartment house. The Moscow Times names Moisei Ginzburg and Ignaty Milinis as the architects. It says they designed it for the People's Commissariat of Finance. The official Narkomfin website names it as an example of the “transitional type” projects that sat between ordinary flats and full house-communes. It was for staff of the finance ministry of the Russian republic. Ginzburg led the team that designed the apartments.

The sources give different dates for its completion. The Moscow Times says it was completed in 1932. The Narkomfin website says that the first residents moved in during 1931. The Moscow Times also reports that the building inspired Le Corbusier's housing blocks known as Unité d'Habitation.

ItemWhat the source saysSource
Origin of the art movementFounded by Tatlin and Rodchenko, dated to around 1915Tate
Name taken upBy 1921, followers call themselves constructivistsTate
Manifesto1923 manifesto in Lef on the technical organisation of materialsTate
Narkomfin buildingDesigned by Ginzburg and Milinis, completed in 1932Moscow Times
Narkomfin residentsFirst residents moved in during 1931Narkomfin website
Art movement in RussiaSuppressed in the 1920sTate

What happened to Soviet constructivism?

Tate states that authorities suppressed constructivism in Russia in the 1920s. Naum Gabo and Antoine Pevsner carried the ideas to the West, where they strongly shaped modern sculpture. Tate's statement concerns the art movement. The Narkomfin dates show that this building was finished or first occupied after the 1920s.

The Moscow Times reported in April 2014 that the Narkomfin building had been in a state of dilapidation for several decades. It also reported that an illegal reconstruction project was already under way. The Narkomfin website says a restoration plan led by Alexey Ginzburg, the grandson of Moisei Ginzburg, was approved in 2017. It says the restoration of the apartments was completed in 2020.

Were there echoes of constructivism in Czechoslovakia?

The clearest documented trace in the sources opened here is exhibition culture. The third exhibition of the avant-garde group Devětsil ran in the Rudolfinum in Prague from 12 May to the end of May 1926. A database of Czech art exhibitions records that Karel Teige wrote in Stavba that architecture "absolutely prevails at the exhibition". The Institute of Art History of the Czech Academy of Sciences runs the database. The show gave architecture its own hall.

The database says reviewers noticed the work of Jaromír Krejcar most. It names his Olympic of 1926 and his 1924 competition project for the Workers' Accident Insurance Company. The foreign guests it names are Le Corbusier, Amédée Ozenfant and Man Ray.

The database does not mention constructivism or Soviet contributors for this show. The sources show a strong architectural avant-garde in Prague, not a direct Soviet link. We found no source that ties Soviet constructivism to a Slovak building, so this page makes no such claim.

How is constructivism different from functionalism?

Both movements drew on industry and modern materials, so people often confuse them. The difference lies in origin and stated purpose. Constructivism grew out of Russian art around Tatlin and Rodchenko. The functionalism entry on this site describes a movement that crystallised in Europe in the 1920s and 1930s, with strength in Central Europe.

AspectConstructivismFunctionalism
OriginRussian art circle around Tatlin and RodchenkoEuropean architecture, strong in Central Europe
Stated ideaTechnical organisation of materialsForm emerges from use and structure
Typical exampleThe Narkomfin house-commune in MoscowHousing, schools and public buildings of the 1920s and 1930s
FateArt movement suppressed in Russia in the 1920sStrong in Central Europe, including Czechoslovakia

What does constructivism mean for an owner in Slovakia today?

Constructivism is not a Slovak building tradition, and the sources opened here show no Slovak buildings in the style. For an owner of a building from the interwar decades, the label does not decide legal protection. Act 49/2002 defines a cultural monument as a thing of heritage value that the authority declares a cultural monument (§ 2 ods. 3).

The owner of a cultural monument carries out its basic protection at their own expense (§ 28 ods. 2 písm. a). Before a renovation, the owner asks the regional heritage office for a decision on the renovation intent (§ 32 ods. 2). The text read for this page is the version in force from 1 April 2025. The Bauhaus entry covers the German school that the functionalism entry links to the same decades.

Frequently asked questions

Is constructivism the same as functionalism?
No. Constructivism came out of Russian art around Tatlin and Rodchenko. Functionalism is a European architectural movement in which form emerges from use and structure. Both drew on industry and modern materials, so people confuse them. See functionalism.
What is the Narkomfin building?
The Narkomfin building in Moscow is a house-commune for finance staff. The Moscow Times names Moisei Ginzburg and Ignaty Milinis as its architects and gives 1932 as its completion year. The Narkomfin website says the first residents moved in during 1931.
Was the Narkomfin building restored?
The Narkomfin website says a restoration plan led by Alexey Ginzburg was approved in 2017. It says the restoration of the apartments was completed in 2020. The Moscow Times reported dilapidation and an illegal reconstruction project in April 2014.
When did constructivism start?
Tate dates the start of the art movement to around 1915, when Vladimir Tatlin and Alexander Rodchenko worked in abstract forms made from industrial materials. By 1921 their followers called themselves constructivists.
Did constructivism reach Czechoslovakia?
The sources reviewed here document a strong architectural avant-garde in Prague, including the 1926 Devětsil exhibition. They do not show a direct Soviet link. A stronger claim needs further sources.
Does a constructivist building have heritage protection in Slovakia?
The style does not decide it. Under Act 49/2002 a building is protected when the authority declares it a cultural monument or when it stands in a heritage territory. Ask the municipality and the regional heritage office.

Sources

  1. Constructivism (art term) · Tate
  2. Constructivist utopia Narkomfin endangered by renovation project · The Moscow Times
  3. About the Narkomfin Building · Narkomfin (official project website)
  4. Third Devětsil exhibition (Třetí výstava Devětsilu) · Databáze uměleckých výstav v českých zemích 1820–1950, Institute of Art History of the Czech Academy of Sciences
  5. Zakon c. 49/2002 Z. z. o ochrane pamiatkoveho fondu · Slov-Lex · § 2 ods. 3, § 28 ods. 2, § 32 ods. 2