Biedermeier

Biedermeier is a plain, middle-class domestic style of Central Europe that flourished in Austria and Germany from about 1815 to 1848.

What is the Biedermeier style?

Biedermeier is the name for a plain, comfortable domestic style that arose primarily in Central Europe, particularly in Austria and Germany, in c. 1815 to 1848. EBSCO links it to the middle class. It describes the later phase as an almost antiheroic style linked to the middle class or bourgeoisie. The style covers furniture, interiors and the decorative arts of the period, not only buildings.

The label is a later one, as the next section shows. The sources below include the German Deutsches Historisches Museum (DHM).

Where did the Biedermeier style come from?

EBSCO says Biedermeier decorative arts grew out of the French Empire style. The classicism entry covers the wider classical tradition.

The name itself came later. The EBSCO research starter says the word was not used for a style until after 1853. The DHM adds that the term first had a negative meaning and was re-evaluated around 1900.

When did the Biedermeier period begin and end?

EBSCO gives the period as c. 1815 to 1848 and says that by 1848 the Biedermeier age was over. It also describes how a revolution in Paris led Viennese designers to demand similar design reforms. The DHM links the epoch to the time after the political unrest of the early nineteenth century. It describes a retreat into the domestic and private sphere and a longing for a petty-bourgeois family idyll.

The dates are approximate. For Slovakia, the Slovak National Gallery gives roughly 1815/1820 to 1848/1860 for its 2015 exhibition. The table lists each marker with the source that gives it, so one year is not read as a hard boundary.

MarkerDate or periodSource
Usual start of the stylec. 1815EBSCO Research Starters
Start and end as given for SlovakiaRoughly 1815/1820 to 1848/1860Slovak National Gallery
Geymüllerschlössel built in Vienna1808MAK, Vienna
First use of the term for a styleAfter 1853EBSCO Research Starters
End of the ageBy 1848EBSCO Research Starters
Term re-evaluatedAround 1900DHM

What does Biedermeier architecture look like?

The sources I could open describe Biedermeier mainly through interiors and furniture. The DHM says the interior of the Biedermeier was plain and functional, with only isolated ornaments. EBSCO says the style suited the modest size and practical needs of comfortable middle-class homes. The Slovak National Gallery says interior furnishing focused on practicality and comfort has been neglected in Slovakia.

The MAK describes the Geymüllerschlössel in Vienna as a summer residence built in 1808 for the banker Johann Jakob Geymüller. It says the early 19th-century interiors offer an authentic glimpse into the variety of Biedermeier decorative art. The MAK calls the house one of the few such places in Austria. These sources give no list of facade rules, so this article gives none.

How is Biedermeier furniture made?

Biedermeier furniture is the best-documented part of the style. EBSCO names light, local woods such as apple, elm, pear, cherry and birch. It also names mahogany, rosewood, walnut, maple, sycamore and poplar, with inlaid patterns of ebony or black-stained fruitwood. Finishes were light, with inlays and little or no carving. Makers emphasised smaller pieces for specific functions, such as ladies' writing desks and sewing tables. A less formal home arrangement usually featured a piano and knickknacks.

The forms changed over the period. EBSCO says the furniture was rectangular and sturdy, at first boxy but by 1840 curvy. Chairs had concave or sabre-like legs, and tables had lyre-like or melon-like pedestals. Makers used pressed brass ornaments in imitation of ormolu, and some pieces had painted decoration with motifs from antiquity.

FeatureWhat the sources saySource
WoodsLocal woods such as apple, elm, pear, cherry and birch, with mahogany, rosewood, walnut, maple, sycamore and poplarEBSCO Research Starters
FormRectangular and sturdy, at first boxy, curvy by 1840EBSCO Research Starters
OrnamentIsolated ornaments, light finishes, inlays, little or no carvingDHM; EBSCO Research Starters
Purpose and sizeSmaller pieces for specific functionsEBSCO Research Starters
CharacterLess representative, more comfortable and homelyDHM

Is there Biedermeier in Slovakia?

Yes. The Slovak National Gallery held an exhibition called Biedermeier from 19 June to 1 November 2015 at the Esterházy Palace in Bratislava. The gallery's page says the show covered roughly 1815/1820 to 1848/1860. It included portraits, landscapes, still lifes, scenes of everyday life, small practical items and furniture. Most works came from Slovak gallery and museum collections.

The gallery names Slovak makers of applied art: glassmakers in Košice and Zlatno, goldsmiths in Košice, Prešov, Banská Bystrica and Bratislava, and watchmakers. It credits furniture to Ján Justh of Kežmarok. The exhibition themes included censorship, the 1848 revolution, family life and travel to the Tatras and spas. This article names no Slovak building in the style, because the sources opened do not name one.

How is Biedermeier different from classicism?

Classicism is the wider architectural movement, and the classicism entry covers its forms and history. Biedermeier is narrower. EBSCO says Biedermeier decorative arts grew out of the French Empire style. The sources describe Biedermeier as a culture of home life more than as a set of public buildings.

The historicism entry covers the revival styles of the later 19th century. The sources opened for this entry do not compare Biedermeier with the baroque or with those revivals, so this article makes no such comparison.

What are the common misconceptions about Biedermeier?

The first misconception is that Biedermeier is a single furniture style. The sources show a range. Early pieces were boxy and sturdy, later ones curvy. Regions differed too: EBSCO says northern Germany most often used mahogany with black horsehair upholstery.

The second misconception is that Biedermeier means cheap or crude work. EBSCO says the period preferred the personal, homey touch of craftsmen's work to machine-made items. The DHM describes the interiors as plain and functional.

The third misconception is that the period name has always been in use. As noted above, the term first had a negative meaning and was re-evaluated around 1900.

Can Biedermeier ideas be used in a house today?

The logic of the style can transfer to a contemporary house. It means a plain, functional interior, furniture sized for modest rooms, light woods and restrained decoration. A designer can borrow that logic. It is an interpretive approach, not a rule of the period or a requirement of any building code. If you own an old house with period furniture or interiors, ask the regional monuments office or a museum before you remove or restore them.

Frequently asked questions

Which years does the Biedermeier style cover?
EBSCO gives the period as c. 1815 to 1848 and says that by 1848 the Biedermeier age was over. The Slovak National Gallery gives a wider span for Slovakia, roughly 1815/1820 to 1848/1860. The dates are approximate, not legal or technical boundaries.
How does Biedermeier differ from classicism?
Classicism is the wider architectural movement. Biedermeier is a narrower style of furniture, interiors and decorative arts. EBSCO says Biedermeier decorative arts grew out of the French Empire style.
Which woods were used in Biedermeier furniture?
EBSCO names local woods such as apple, elm, pear, cherry and birch. It also names mahogany, rosewood, walnut, maple, sycamore and poplar. Finishes were light, with inlays and little or no carving.
Where does the name Biedermeier come from?
EBSCO says the word was not used to describe a style until after 1853. The Deutsches Historisches Museum says the term first had a negative meaning and was re-evaluated only around 1900.
Is there Biedermeier in Slovakia?
Yes. In 2015 the Slovak National Gallery in Bratislava held a Biedermeier exhibition with works mostly from Slovak collections. It showed furniture by Ján Justh of Kežmarok and applied art from Košice, Prešov, Banská Bystrica and Bratislava.

Sources

  1. Biedermeier (LeMO, chapter Vormärz und Revolution, Kunst und Kultur) · Deutsches Historisches Museum, LeMO · Kunst und Kultur
  2. Biedermeier Furniture Style · EBSCO Research Starters · Whole article
  3. The history of the Geymüllerschlössel · MAK, Museum für angewandte Kunst, Vienna · History of the building
  4. Biedermeier (past exhibition, 2015) · Slovak National Gallery · Exhibition page